MEETING DATE: September 18, 2017
AGENDA ITEM: Consideration of approval of Partial Payment Estimate No. 6 to McAninch
Corporation for the SE Westown Parkway Extension and Grand Prairie
Parkway Greenbelt Weirs SE Parkview Crossing Drive to Grand Prairie
Parkway Project in the amount of $545,957.30
FORMAT: Consent Agenda
SYNOPSIS INCLUDING PRO & CON: McAninch Corporation has requested Payment Estimate
No. 6 for the work completed on the SE Westown Parkway Extension and
Grand Prairie Parkway Greenbelt Weirs SE Parkview Crossing Drive to
Grand Prairie Parkway Project in the amount of $545,957.30. Foth
Infrastructure and Environment, LLC has reviewed the payment estimate and
recommends payment.
Partial Payment No.5 is for work completed from August I, 2017 to August
31, 2017.
FISCAL IMPACT INCLUDING COSTBENEFIT ANALYSIS: $545,957.30
COMMISSIONBOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve Partial Payment No. 6
ATTACHMENTS: I. Partial Payment No. 6
II. Letter of Recommendation
PREPARED BY: Beth Richardson
REVIEWED BY: John Gibson r
PUBLIC NOTICE INFORMATION —
NAME OF PUBLICATION:
DATE OF PUBLICATION:
*lsvFoth
September 13, 2017
John Gibson
Director of Public Works
805 University Avenue
Waukee, IA 50263
RE: Pay Request #6
SE Westown Pkwy Extension and GPP Greenbelt Weirs
SE Parkview Crossing Dr. to Grand Prairie Pkwy
Dear Mr. Gibson:
Attached please find a detailed Pay Request for City Council approval on September 18, 2017.
Submitted Quantity
• 0.26 LS of Item 1.1, Construction Staking
• 2,362 LF of Item 4.9, 6" PVC Subdrain
• 3.75 EA of Item 4.10, Subdrain Cleanout, Type A-1
• 16 EA of Item 4.11. Subdrain Connection to Intake or Storm Sewer
• 0.75 EA of Item 6.4, SW-501 Intake
• 0.50 EA of Item 6.5, SW-503 Intake
• 0.75 EA of Item 6.6, S W-505 Intake
• 0.50 EA of Item 6.7. SW-506 Intake
• 8,174.5 SY of Item 7.1, 9" PCC Pavement
• 298.47 SY of Item 7.2, 9" Reinforced PCC Pavement
• 1 LS of Item 7.3, PCC Pavement Samples and Testing
• 0.50 of Item 8.6, Traffic Control
• 1,280 LF of Item 8.10, Conduit 2"
• 0.10 LS of Item 8.15, Lighting
• 0.13 LS of Item 9.7, SWPPP Management
• 244 SY of Item 12.12, Anti -Graffiti Coating
• 2,015 SY of Item Al.1, Modified Subbase, 6"
•-335.83 CY of Item A1.2, Excavation Class 10, Borrow
We have reviewed the submitted quantities and they appear to be in order with what has been constructed
in the field. If City Staff concurs with this payment, we recommend the City of Waukee pay McAninch
Corp. of Des Moines, Iowa in the amount of $545,957.30 for the work completed to date.
Please let me know if you have any questions or need additional information.
Sincerely,
Foth Infrastructure and Environment, LLC
Joshua C. DeBower, P.E., Lead Civil Engineer
Encl: Pay Request #6 dated 09/12/17
8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 Fax: (515) 254-1642
-, Waukee Public Works Department
' . 805 University Avenue
kig4 Wauke, IA$0263
se Phone (515)9T8-7920
-ie Fax (515)987-39]9
Waukee
Contractor: MCAnnnch Corporation
4001 Delaware Avenue
Des Moines, IA 50313
Phone (515) 267-2500
PAY REQUEST 6
Project Title
BE Weslown Pkwy Exlenalon dad GPP Greenbelt Weia
6E PaMvlew Glossing o1 re Grand Prairie Pkwy
Waukee IA
Pro ect File No.
IsMa Number 1 14W02102
Purchase Order Number
Orig. Contract Amount 6 Date
$2,833,29OL59 L8/201i
Notice to Proceed Data
v17rz017
Estimated Completion Doh
811512817
Pay Period
8111201i To 811
Pay Request Number
fi
Data
8/121201i
Contract ID
BID ITEMS
Item
No.
Item
COde
Description
Unit
Est.
Ogy
Unit
Price
Extended
Side
Quantity
Completed
Venue
Completed
DIVISION i -GENERAL
it
1090A-1000
CONSTRUCTION STAKING
US
1
$11.]0000
in t,AnN
S.
$10,29e
1 ]
1090A-2000
MOBIUTATION
I L$
I 1
1 $114,600.00
$114.600 001
100
1 E114.600.00
DIVISION 2 - EARTHWORK, SUBGRADE AND SUBBASE
21
2010 C-1000
CLEARING B GRUBBING
IS
1
53,80000
53,5000.
100
$380000
22
20100-1000
TOPSOIL, ON SITE
CY
3.634
5575
Re,89550
1.10.00
S104535r
23
200E-1000
EXCAVATION CIA$$tO.ON SITE
Cy
9,54]
$504
$48,11800
95200
$40.n60B
24
2010E-2000
EXCAVATION CLAS510. BORROW
CY
56.263
Si
$358900.08
56283DD
$35090000
25
2010F1024
BELOW GRADE EXCAVATION(CORE DUN
Cy
1.127
$6,00
$6762.
000
5000
20
2010G 1012
$UBGR.E PREPARATION, 121N.
By
saga
$3.09
S20, 115.91
909900
$28.145111
DIVISION 3 - TRENCH AND TRENCHLESS CONSTRUCTION
31 DEWATERING L$ 1 524,00000 $24,Me 00 100 52a xG
DIVISION 4 - SEWERS AND DRAINS
41
4021bA1015
STORMSEWER, TRENCHED.ROP,CLA$SV, 151N.
LF
572
$7800
$44CIA
17200
sea DID .0
43
4020-A 1NP
STORMSEWER, TRENCHED,RCP,CU$$V, 161N.
LE
J29
$80,00
SOS 32000
32900
SW 3AN
43
4011060
STORM SEWER TRENCHED. RCP. CLASS III, 601N.
LF
25
$35s00
$8,950 SO
240a
Salar 0
44
4020A-1072
STORM SEWER. TRENCHED. RCP. CLAS$ 111, 72 IN,
LF
114
E467.00
Si
114,00
$51,2380D
45
40201
STORM SEWER, TRENCHED. RCAP, CLASS A III, 51"MD
LF
134
E228,00
too a.. a.
134,00
$3055200
46
403001652
PIPE APRON, CONCRETE, 51"x3Y'ARCH
EA
1
$3,488.00
E348800
100
$]salad
4.7
403081072
PIPE APRON, CONCRETE, 721N.
EA
1
$5,984do
so MN d0
IA
$5984 do
40
4040A1064
SVBDRAIN, PVC.(WAUKEE SPECIFICATIONS. 41N
LF
665
$16.30
$10,Ger
66500
Sir EGA 1.
49
40404,-1006
SUBDRAIN,PVC. CASE D(WAUKEE SPECIFICATION$). 61N.
LF
2,362
$18 do
$4348000
236200
$111.or
4.10
1404OGTION
I SUBORAIN CLEANOUT, TYPE AI
EA
6
E35]00
E2, 142 C0
li5
$2408]S
4.11
4040D-tODO
SUBDRAIN WNNECTION TO INTAKE OR STORM SEWER
EA
b
E255A
$433500
17W
$433500
412
4040D2000
I SUBDRAIN OUTLET, WI RODENT GUARD
EA
1
$35]00
$35700
coo
$000
4t3
FIELD HILL AND FITTMGS, PVC, UNSPECIFIED DIA.
LF
I WO
1 $11,00
$5 Sao N
0,00
so.
414
140401
IViDEO INSPECTION OF STORM SEWER AND CULVERTS
L$
I 1
$2,910.00
1 S2,9110M
1.00
$2,910.W
DIVISION 5 -WATER MAIN AND APPURTENANCES
51
NH ia12
WATER MAN, TRENCHED, PVC C900, OR 16. 121N
LF
1110
S3X
$3135300a
111000
$XSC3000
52
5010A1112
WATER MAIN, TRENCHED PVC C900. DR 18, 121N., RESTRAINED JOINT
10]
S4800
S0,9]B OD
18].On
S89]600
53
5m0G1000
WATER MAN FITTINGS
N2
S500
&d'MCd 0
912do
S45fi00a
5A
COUP A1012
VALVE, GATE 121N
3
$193900
$581700
300
so Aldo
55
VALVE BOXADJUSTMENTMINOR
ILE
1
$98300
$N3IN
ICH
S9830D56
5D200d000
FIRE HYDRANT ASSEMBLY
4
IN 41do
$17.172.00
a
$17,17200
Si
5eri
REMOVAL OF HYDRANT ASSEMBLY
1
$t A5800
AOR 0.
1co
$1.45800
PRsInman awa Pwy Fusnesince
Pace 1013
DIVISION 6 - STRUCTURES FOR SANITARY AND STORM SEWER
51
6010-A UI84
MANHOLE, STORM SEWER, SW-401. IN IN
EA
1
$6,10000
$6,18000
100
E6.18000
63
6010.A 2072
MANHOLE, STORM SEWER. SWAU2, n IN.
EA
1
$9.9]],00
$9, 9]]00
100
$9,9]]00
6J
6010A110A
MANHOLE, STORM SEWER. SW-404,MX9
EA
2
$31,]]0.WO
563510.O0
2,00
$63.5g0.00
64
6010.E-0501
INTAKE, SINGLE GRATE, SW-501
EA
3
$2.195 Re
$SSII 0
3,00
SB,SB500
8.5
6010E 1503
INTAKE, SINGLE GRATE WITH MANHOLE, SW-503
EA
2
$4,30600
$3612.
200
$8,6120E
S6
6010B-1505
INTAKE, DOUBLE GRATE, SW-505
EA
3
$3A70.00
$10,4100
3.00
$10,4100D
67
60100.E-05.
INTAKE, DOUBLE GRATE WITH MANHOLE, SW'506
EA
2
56,2.11.
$12,57800
2A)
$12.51000
&B
6010.E1100
MANHOLE ADJUSTMENT, MAJOR
EA
3
$3.UP 00
$10.920 DD
0U0
SU J
AS
6010.H-1000
REMOVAL OF MANHOLE OR INTAKE, STORM
EA
4
V020.00
$17,28000
400
$1]2P000
DIVISION T - STREETS & RELATED WORK
] 1
7010LA 1090
PAVEMENT, PCC, CLASS C. 91N.
SY
B l90
$55 00
$450,450 W
6174.50
$419597. 50
72
701OA2090
PAVEMENT, REINFORCED PCC, CLASSC, W IN.
BY
299
$7000
$20.930W
29841
$20..269
73
7010-1-SVX
Pee PAVEMENT SAMPLES AND TESTING
LS
1
$227000
$2.270IS
10W
02.2T0 W0
7.4
XJ0-C-1006
SHARES USE PATH, PCC, 61N.
SY
1,41E
S3550
lIS.339IS
000
SO WW
26
7036D-1012
SPECIAL SUBGRADE PREPARATION FOR SHARED USE PATHS, 121N.
SY
2,OM
$1 TS
$643860
OOD
W0
]6
703W-E-1WW4
SIDEWALK, PCC. 41N.
SY
725
53450
525.01250
O0J
SOOD
27
7030-E-1006
SIDEWALK, PCC. 5 IN.
BY
53
$48,00
$2.514.00
0.00
$0DU
]B
703RG1000
DETECTABLEWARNINGS
SF
fi0
$43.00
$2.5000
000
$OED
79
ID40-H-1000
PAVEMENTREMOVAL
BY
95
$15.50
$1.472.50
000
$00J
DIVISION 8 - TRAFFIC SIGNALS AND TRAFFIC CONTROL
9.1
POSTS FOR SIGNS. STEEL
LF
208
$12.50
$2,60000
000
E600
82
TYPE A SIGNS
SF
141
$10.50
$2.80850
000
$000
83
PAINTEDPAVEMENTMARKINGS, DURABLE
'STA
05
$13300
$11.289.04
000
5000
84
PAINTED SYMBOLS AND MARKINGS. DURABLE
EA
24
$204.0.
$4,696.00
000
$000
85
PANTED PAVEMENT MARKINGS ,WATERBORNE
STA
9
$07,00
$]8]34
0IT
50110
8.6
TRAFFIC CONTROL
LS
1
53.050.00
53,05000
0.50
INSCA 00
B]
HANDI TYPE 111, 3P X 4W
EA
3
$1 O2 G
$X..PRS
100
$1,02600
AS
FIBER TERMINATION PANEL. 40 POSITION, RACK MOUNT
FA
2
$11.W
$ip20W
0.00
$D 0J
89
FIBER OPTIC TERMINATIONS
EA
72
$3600
$2,592W
000
$V0W
610
CONSNIT-2 IN. PVCMDPE
LF
3715
$867
$32,209.0$
37150D
53?2.eX
8.11
TRACER WIRE
LF
4.050
S0.36
$1.45800
0.00
5000
812
PULL ROPE
LF
4050
10.15
560250
000
$J W
BR
idt-1.11I..
72 SINGLE MODE FIBER OPTIC CABLE, DRY CORE
LF
g850
$180
$0,37O00
000
SO WW
L14
TRAFFIC BIGNALIZATION
LS
4
$10,28600
$1026000
0,00
5W.W0
6.15
LS
1
$88.00000
$80.000 OD
010
$8PJ000
DIVISION 9 - SITEWORK AND LANDSCAPING
81
901OA-1300
CONVENTIONAL SEEDING B MULCHING. TYPE
ACRE
AK
$]65.00
53.3660E
1.13
$1,093.95
5.2
SNINA-1100
CONVENTIONAL SEEDING B MULCHING. WEDAND SEEDING
ACRE
0.0
$400000
$SOD
0.00
$J III
9,3
SOLIDS -I WO
HYDRAULIC SEEDING, FERTILIZING&MULCHING, TYPE I(PERM. LAWN MIXTURE)
ACRE
10
$2.550,00
$2,55000
000
6000
3A
SHRR1400
HYDRAULIC SEEDING. FERTILIZING SMULCHING, TYPE 4(UBRAN TEMP MIXTURE)
ACRE
6.0
$1.830.00
$10,9800D
1,18
S?16489
95
9DTGD 1000
WATERING
MGAL
523
$41.00
$21 U,U J
100
IS 00
96
901OEi000
WARRANTY
LS
1
$3,57000
$3,570.00
0.00
SOLO
9]
MNGA-1000
STORMWATER POLLUTION PREVENTION PIAN(SWPPFL MANAGEMENT
LS
1
$3,WO 00
$3 "Go 00
0]5
S2,28500
98
9010N 1000
SILT FENCE. INSTALLATION
OF
3,123
$143
$446589
3974IS
S5 GA202
BS
9040 N3000
SILT FENCE, REMOVAL
LF
3.123
50.05
8156.15
000
WIT
9.10
9040�T-tOLU'
INLETPROTECTION
EA
0
$153 W0
$1,224.00
4.00
$012.00
911
9040J�0]020
RIP RAP, CLASS
TON
127
$56.00
$]111200
191.84
1 $10.743,04
912
9040-13-1012
FILTER BOOKS. 12' GA. INSTAU 1.D B REMOVAL
LF
]fi0
$330
$2,500.00
760.00
1 $2,500.00
DIVISION 12-STRUCTURES
CULVERT QUANTITIES
12.1
FLOODED BACKFILL
CY
153
$7650
$11,70450
15300
S11704%
122gANL-.RAFFNF
EXCAVATION, CLASS 20
CY
103
52850
$5,21550
1P300
55,2155E
123STRUCTURAL
CONCRETE (FEEL
CY
210
5660 J0
$1 BL'P400
21]90
$187 394 00
124REINFORCING
STEEL
LB
11,]49
5326
SlJ$T0174
4174900
SIR 10174
12.5ORNAMENTAL
METAL RAILING
LF
122
$]200
$8,74800
2600
Si B]200
12fi
COATING
SY
152
$2000
59,810.S.
OLD
$000
GREENBELT WEIR QUANTITIES
121
GRANULAR BACKFILL
TON
1.555
$2660
ILI 3. IX
105401
$28.036 fi]
12.8
EXCAVATION, CLASS 20
CY
1.W5
51225
513160]5
107500
S13.16875
129
STRUCTURAL CONCRETE (MISCELLANEOUS)
CY
402
5J630J
$305.06]]W
40190
$39506]]0
1210
REINFORCING STEEL
LB
4],0]0
53fi2
IT 73.122US
1]0]8J0
51]012236
1211
ORNAMENTAL METAL RAILING
LF
281
P200
$18,79920
.110
$18]992.
12,12
ANTI GRAFFITI COATING
BY
264
531 J0
$B.18100
2440D
$7.56400
1213
WEIR OUTLET CONTROL. 4- DIP WITH GATE VALVE
EA
2
E850.OD
$1.7.LL
20J
51.>00. Fe
1RF]O11D6]15E PRO- H, Ealexiorvtlsm
P., 2 of
BID ALTERNATE M1
At
MODIFIED SUBBASE, 6'
6v
0780
Sfi.35
E55.]5300
0]0000
E55 ]5300
Al2
2010E-2000
E AVATIBN CIA5510, BORROW
CY
1065
E5.30
SB,22950
-1 <83.33
5921900
TOTAL
$2,01,3]6.59
E2,611.1T9.]0
MATERIAU STORED SUMMARY
Description
I Yol U.P.
I Unit Pllce j
Eatontletl Ca s1
TOTAL
I.A.
PAY REDDEST SUMMARY
Total Appravetl
Total Com@ pletl
LonllaR Plice
52,933,29059
$2.61117978
AProvetl CM10n0e Ortlelt
Apposed LFa" O1Ee12
Sa a20 DO
$1 SBD0
Ppproved C0an9e OIOeo3
5000
Revisetl Conrad Price
52931 9]B 59
Ed, 611,179. 76
M aleoals Slated
$O 00
Retainers 50%
ITS.560. BB
Total Eamed Less Ron diet.
$2.480,62079.
Total Previously Approved (list each)
Pay Requastl
5191.204.20
Pay Request
$74502203
Pay Requesl3
S403.55842
Pay Request)
$261,073.01
Pay Requesl5
$333.807 B3
Pay Requesl5
Pay Request]
Pay Requee10
Pay per, uesl9
Pay Request 10
Total P1.1—t y Applwatl
E193a63141
Amount Due This Request
$5<5,95T30
Percent Complete
89.1%
Percent 0( Contract Proud mixed (in Calendar Days, Based on Notice to Proceed Date B Lanford ComgeVen Dakl
96fi%
The amount 5j545i571 �s recom end.d lot aPProval for payment In acwrdanc-11, the lermsofthe
Cunle,
', n
Recommended By
en.
.I,n.rc
Short—
Signature
Name Don Taylor
Rome Joshua 0. DuBois., P.1
No..'
Title Proectillanager
Lead Civil Engineer
Title
—Ttle
Date,
Data'