RE: Pay Request #7
SE Westown Pkwy Extension and GPP Greenbelt Weirs
SE Parkview Crossing Dr. to Grand Prairie Pkwy
Dear Mr. Gibson:
Attached please find a detailed Pay Request for City Council approval on October 16, 2017.
Submitted Quantity
0.12 LS of Item 1.1, Construction Staking
1,816 CY of Item 2.2, Topsoil
9,099 SY of Item 2.6, Subgrade Preparation, 12”
2.25 EA of Item 4.10, Subdrain Cleanout
1.0 EA of Item 4.12, Subdrain Outlet, w/ Rodent Guard
3.0 EA of Item 6.8, Manhole Adjustment Major
1,365.56 of Item 7.4, 6” PCC Shared Use Path
2,044 SY of Item 7.5, Special Subgrade Preparation for Shared Use Path
714.4 SY of Item 7.6, 4” PCC Sidewalk
53.7 SY of Item 7.7, 6” PCC Sidewalk
60.0 SF of Item 7.8, Detectable Warnings
138.75 SF of Item 8.2, Type A Signs
113.63 STA of Item 8.3, Painted Pavement Markings, Durable
23 EA of Item 8.4, Painted Symbols and Markings, Durable
6.92 STA of Item 8.5, Painted Pavement Markings, Waterborne
0.5 LS of Item 8.6, Traffic Control
2.0 EA of Item 8.7, Handhole Type 3
2.0 EA of Item 8.8, Fiber Termination Panel
4,050 LF of Item 8.11, Tracer Wire
4,050 LF of Item 8.12, Pull Rope
4,050 LF of Item 8.13, 72 Single-Mode Fiber Optic Cable, Dry Core
1.0 LS of Item 8.14, Traffic Signalization
0.80 LS of Item 8.15, Lighting
5.05 AC of Item 9.1, Conventional Seeding & Mulching, Type 3
0.96 AC of Item 9.2, Hydraulic Seeding, Fertilizing & Mulching Type 1
0.13 LS of Item 9.7, SWPPP Management
692 LF of Item 9.8, Silt Fence Installation
95 LF of Item 9.9, Silt Fence Removal
8.0 EA of Item 9.10, Inlet Protection
96 LF of Item 12.5, Ornamental Metal Railing
241 SY of Item 12.6, Anti-Graffiti Coating
C:\pw_workdir\pw_ie\jcd\dms03954\Ltr-2017-1013-SEWestownPkwyExtension-Recommend PayApp7.docx 10/13/2017
We have reviewed the submitted quantities and they appear to be in order with what has been constructed
in the field. If City Staff concurs with this payment, we recommend the City of Waukee pay McAninch
Corp. of Des Moines, Iowa in the amount of $235,942.05 for the work completed to date.
Please let me know if you have any questions or need additional information.
Sincerely,
Foth Infrastructure and Environment, LLC
Joshua C. DeBower, P.E., Lead Civil Engineer
Encl: Pay Request #7 dated 09/28/17