Loading...
HomeMy WebLinkAbout2016-02-02-J02 Daybreak P2_Prelim Plat AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: February 2, 2016 AGENDA ITEM: Consideration of approval of a resolution approving Preliminary Plat for Daybreak Plat 2 FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The applicant, Daybreak Waukee, LLC, requests approval of a preliminary plat for Daybreak Plat 2 which is approximately 42 acres in area located west of Ute Avenue and north of the Ashworth Road/Ute Avenue intersection. A total of 81 lots are proposed for single-family residential development. As part of the plat improvements the developer will be required to install a number of new streets and extend utilities over the course of the two phases of the project. Daybreak Drive will be extended further to the west to provide a connection to Ute Avenue and a new street, Dawn Valley Drive will provide a connection to Ashworth Road. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the preliminary plat at their meeting on January 12, 2016 and recommended approval subject to remaining staff comments: Approval of a Preliminary Plat for Daybreak Plat 2 Planner, Melissa DeBoer, stated that the subject property is located west of Ute Avenue and north of Ashworth Road, just west of Daybreak Plat 1, containing a total of 42.44 acres zoned R-1, Single Family Residential. Ms. DeBoer explained that the plat contains a total of 81 single family residential lots and one 1.46 acre lot dedicated as city park located in the southwest corner of the plat. Ms. DeBoer stated that Daybreak Drive will continue west into this plat, from Daybreak Plat 1 and a new street will be constructed off of Ashworth Road on the south in order to provide access to this development. Five foot sidewalks will be constructed on both sides of the streets throughout the plat and a 10’ trail is proposed to provide access from Sunflower Drive to Scenic View Drive. Ms. DeBoer explained that the trail will be installed by the developer as part of plat improvements. Ms. DeBoer explained that there will be a 30 foot landscape buffer easement along the south boundary of the plat, adjacent to Ashworth Road and these plantings will be installed as part of the plat improvements. Ms. DeBoer stated that all lots will be served with public utilities and the parkland dedication is being satisfied with the 1.46 acres being provided in the southwest corner of the plat. Commissioner Schmidt questioned what the long term plan is for the improvements to Ashworth Road. Brad Deets, Development Services Director, stated that for now the requirement is to chip seal the road from Ute Avenue to the west plat boundary of Daybreak Plat 2. Mr. Deets explained that the long term plan is to have Ashworth Road fully paved, but that plan is for 20 to 30 years out. Commissioner Nigro questioned how much water can be contained within the pond. Jake Becker, McClure Engineering, stated that the pond will be a dry bottom pond that overflows to the south. Mr. Becker explained that it is 7 ½ feet deep at the 100 year elevation. Commissioner Hoifeldt questioned who will be responsible for the maintenance of the pond to the east. Mr. Becker explained that the east pond will be maintained by the Homeowner’s Association and the west pond within the park will be maintained by the City of Waukee. Motion by Commissioner Schmidt, seconded by Commissioner Nigro to approve the preliminary plat for Daybreak Plat 2 subject to any remaining staff comments. Ayes: Nigro, Fontenot, Broderick, Hoifeldt, Shanks, and Schmidt. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff would recommend approval of the preliminary plat for Daybreak Plat 2. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Staff Comment Letter IV. Preliminary Plat PREPARED BY: Andy Kass, Senior Planner REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 16- APPROVING THE PRELIMINARY PLAT FOR DAYBREAK PLAT 2 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission reviewed and recommended approval, subject to remaining staff comments, of a Preliminary Plat for Daybreak Plat 2 on January 12, 2016; AND, WHEREAS, the Preliminary Plat for Daybreak Plat 2 is in general conformance with section §303 - Land Subdivision Ordinance of the Waukee Municipal Code. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this the 2nd day of February, 2016, that the Preliminary Plat for Daybreak Plat 2 be approved. ____________________________ William F. Peard, Mayor Attest: _______________________________________ Rebecca D. Schuett, City Clerk ROLL CALL VOTE AYE NAY ABSENT ABSTAIN Shane Blanchard Brian Harrison Shelly Hughes Larry R. Lyon Rick Peterson STAFF REPORT TO: Planning and Zoning Commission PREPARED BY: Melissa DeBoer RE: Daybreak Plat 2 – Preliminary Plat DATE: January 12, 2016 GENERAL INFORMATION: Applicant: Daybreak Waukee, LLC Requested Action Preliminary Plat Approval Location and Size: Property is generally located West of Ute Avenue, North of the Ute Avenue/Ashworth Road intersection containing approximately 42.44 acres more or less. LAND USES AND ZONING: Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Neighborhood Residential R-1 North Vacant – Undeveloped Neighborhood Residential A-1 South Rural Residential Rural Residential A-1 East Daybreak Plat 1 – Single Family Residential Neighborhood Residential R-1 West Agricultural Neighborhood Residential A-1 BACKGROUND: The subject property is located west of Ute Avenue and north of the Ute Avenue/Ashworth Road intersection, immediately west of the Daybreak Plat 1 development. The developer, Daybreak Waukee, LLC, requests approval of a preliminary plat for an 81 lot single-family residential subdivision. In July 2015, the Planning & Zoning Commission recommended approval of the applicant’s request to rezone the subject property from A-1 (Agricultural) to R-1 (Single Family Residence) and the City Council approved the rezoning in September 2015. January 8, 2016 2 of 3 ABOVE: Aerial photo of proposed plat outlined in BBLLUUEE in relation to the surrounding properties Project Description: Lots: The preliminary plat includes 81 single family residential lots and one 1.46 acre lot dedicated as city parkland. The lots are a minimum of 10,000 square feet in size. All of the lots are indicated as having the required 30 foot front yard setback. Streets: Daybreak Drive will continue west from Daybreak Plat 1. A new street, Dawn Valley Drive, will be constructed off of Ashworth Road in order to provide access to this development. Other streets throughout the plat include Scenic View Drive, Sunflower Drive, Crescent Ridge Drive, Morningstar Court, and Sunburst Court. Five foot sidewalks will be constructed on both sides of the streets throughout the plat as part of individual lot build out. The five foot sidewalk along Parcel A will be installed as part of the plat improvements. A trail is proposed to provide access from Sunflower Drive down to Scenic View Drive and the park land to the south. The trail is located along lots 34, 35, 73, and 74 and will be installed as part of the plat improvements. January 8, 2016 3 of 3 Easements: Several easements are proposed within the plat based upon the location of proposed utilities. A 30 foot landscape buffer easement will be provided along the south boundary, adjacent to Ashworth Road. This landscape buffer easement includes lots 53, 54, 55, 59, 60, and the city park land. The landscape buffer plantings will be installed as part of the plat improvements. There are two 25’x25’ monument sign easements located on both sides of Dawn Valley Drive at the intersection of Dawn Valley Drive and Ashworth Road. Utilities: All lots will be served with public utility services. A majority of storm water from this plat will be routed to the proposed detention basin within Parcel A and the detention basin located in the rear yards of lots 53 and 54. Parkland Dedication As part of the development of this plat the applicant is required to dedicate parkland, for which the amount required in this case is 1.46 acres. The applicant has provided the required 1.46 acres of parkland in the southwest corner of this plat. STAFF RECOMMENDATION At this time Staff feels comfortable with the proposal and would recommend approval of the Preliminary Plat for Daybreak Plat 2 subject to remaining staff comments. CITY OF WAUKEE Melissa DeBoer, AICP Planner II Development Services Department 230 W. Hickman Road Waukee, IA 50263 Phone: (515) 978-9533 Fax: (515) 987-1845 1st Review: September 29, 2015 2nd Review: December 9, 2015 3rd Review: January 13, 2016 4th Review: McClure Engineering Co. Attn: Jake Becker 1360 NW 121st Street Clive, IA 50325 RE: Daybreak Plat 2 – Preliminary Plat Dear Mr. Becker: Per your request, staff has reviewed the proposed preliminary plat for Daybreak Plat 2. The property in question is located near the northwest corner of the Ute Avenue/Ashworth Road intersection. Based upon our review, staff has the following comments related to the preliminary plat: GENERAL COMMENTS 1. Provide IDNR Sanitary and Water Permit. 2. Provide a note stating that a preconstruction meeting with the City of Waukee will be required prior to any construction. 3. Please provide a geotechnical exploration report as part of the next submittal. 4. Provide a note stating who is responsible for the maintenance of the detention basin. 5. Staff questions if the width of the Sweetgum Drive intersection will be adequate for the future connection to Ashworth Road as it is improved. 6. Provide pedestrian facilities for the Horizon Drive and Daisy Drive intersection. 7. Verify all pedestrian facilities, including street crossings, will meet PROWAG. 8. Staff suggests removing the pedestrian ramp located on the southwest side of the intersection of Dawn Valley Drive and Scenic View Drive going north as there is no ramp on the other side of the street to connect to it as well as the ramp located on the northwest corner of the intersection of Crescent Ridge Drive and Scenic View Drive going south. 9. Please note that a temporary sediment basin facility will be required for disturbed areas over 10 acres. 10. Provide a 20’ minimum sanitary sewer easement (10’ each side) or two times the depth. Provide a 10’ easement if the main is less than 10’ from the property line. 11. Keep storm sewer mains from underneath the pavement (Horizon Court), try to locate manholes out of pavement. 12. Keep utility layout consistent on street sides throughout the plat. Project Name Project Engineer/Manager Project Type City Contact Daybreak Plat 2 Jake Becker Preliminary Plat Melissa DeBoer 13. Show services to all lots. 14. Verify storm sewer is extended to serve every lot with sump services (lots 78-81). 15. Show Ashworth Road improvements. 16. Please revise street names as follows: • Moonglow Court – Morningstar Court • Sweetgum Drive – Dawn Valley Drive • Daisy Drive – Scenic View Drive • Horizon Drive – Crescent Ridge Drive 17. On note 3, please add “pond B” to the end of the note in order to clarify which pond the HOA is responsible for. Engineers Response: 18. Please label the lot square footage on each individual lot on the plan set. Engineers Response: SHEET 1 19. Please update the street names under the Pavement block. 20. The vicinity map should be updated to include the label for Daybreak Drive. 21. Please provide a note on the cover sheet indicating that the five foot sidewalks are to be installed as part of individual lot development. 22. Please provide a note indicating that the 10 foot trail located on lots 34/35 and 73/74 are to be installed as part of individual lot development. 23. In the note provided at the bottom of the page in the lower left corner, please reference the City of Waukee Standard Specifications for Public Improvements prior to SUDAS. 24. Please provide all bulk regulations for the R-1 zoning district. 25. Please complete the information under the Benchmark block located on the cover sheet. 26. Revise Daisy Court to Daisy Drive to remain consistent. 27. Revise Sunflower Court to Sunflower Drive to remain consistent. 28. Please rename Horizon Drive as that name is already used within the city of Waukee. 29. Please note that Ashworth is not an asphalt surfaced roadway. Please revise plans. 30. Show improvements carried through to the plat boundaries. 31. Staff suggests considering options in order to provide more through streets throughout the subdivision. SHEET 2 32. Please revise Sunflower Drive located in the southeast corner of the sheet to the correct street, Morningstar Court. 33. Remove the looped watermain from Scenic View Drive to Sunflower Drive. 34. Sunflower Drive should be 29’ wide. The cul-de-sac can remain at 26’ in width. 35. Please verify that Lot 43 meets the minimum required lot width of 80 feet, measured at the building setback. 36. Please provide easements and label on the plan for all utilities that are located within any of the private lots. 37. Please label the street pavement widths throughout the plan set. 38. Please label the road/ROW widths throughout the plan set. 39. Please label the five foot sidewalks throughout the plan set. SHEET 3 40. Please label the buffer easement as “Landscape Buffer Easement” and also label the width. 41. Please indicate on the plan whether the monument sign locations will be within a sign easement and also indicate the size of the easement. Please provide a note on the cover sheet indicating who will be responsible for the maintenance of the monument signs. 42. Staff questions if services should be extended to the existing property located in the southeast corner. 43. Remove the looped watermain from Sunflower Drive (Morningstar Court) to Sunburst Court. 44. Please revise Sunflower Drive located in the southeast corner of the sheet to the correct street, Morningstar Court. 45. The 18” storm on Lot 44 needs to run straight across the street. 46. Provide easements with width to double the depth of main (sanitary along Horizon Drive, Daisy Drive, Sunburst Court, Sweetgum Drive, and Sunflower Court; storm sewer in rear lot of Lot 35 and Lot 51). 47. Provide pond elevation information (normal and 100 year elevations) and illustrate. 48. Provide 100 year overflow path location. 49. Detentions should be maintained by a Homeowner’s Association, please provide a note stating the responsibility of the detention basins. 50. Show existing utilities along Ashworth Road. 51. Please indicate the existing Xenia water main along the south side of Ashworth Road. 52. Provide a detention easement for Detention Pond B. Please revise plan to show the detention pond being located entirely within the easement, it appears that a tiny sliver of it is shown outside the easement boundary. Engineers Response: 53. Staff questions if sanitary sewer could be extended to the adjacent property in the southeast corner through the easement between lots 52 and 53. This would provide a sanitary connection for this property in the future. 54. Staff questions if Pond A will be on its own lot or if the developer intends to include it within the parkland. The City has no interest in acquiring a pond as part of parkland dedication. SHEET 4 & 5 55. Provide a detention easement for the critical overflow located within lots 14-23. 56. Provide a temporary construction easement at the north plat boundary of Sunflower Drive. 57. Please indicate and illustrate the 100 year flood elevations and overflow routes for all detention and sump areas. 58. Show and label all easements. 59. Provide a minimum 2% grade for all overland flowage easements, label this on the plan set. Please label the percent of grade through lots 57-59 and lots 42-43. 60. Staff questions if an overland flowage easement is needed for lots 55-59. Please address. 61. Show existing drainage outlet points along Ashworth Road. 62. Show existing grades for the area to the east. 63. Provide an additional easement for potential ponding of water indicated by critical elevation in lots 15, 16, and 18-22. 64. Label the overland flowage easement located within lots 55-59. 65. The 100-year elevation for the pond located within the parkland encroaches into the Ashworth Road right-of-way. The pond will need to be adjusted so that the 100 year does into encroach into the right-of-way SHEET 6 & 7 66. Please show the hydrant radius as 150 feet and the hydrant spacing at 300 feet. 67. Provide proposed water main fitting locations. 68. All improvements shall be extended to the plat boundaries (sanitary and pavement west end of Daisy Drive and Daybreak Drive / north end of Sunflower Drive). 69. Keep water on same side of street on Daisy Court and move storm to same side as sanitary to avoid storm under multiple panels on Moonglow Court. 70. Consider an outlet point for the storm sewer (Parcel A) that is not near the sanitary manhole. 71. Please provide water main along Ashworth Road. Staff questions if there is an existing connection point. 72. Provide sump services for Lots 78 & 79 (not to be installed in structures). Sump services are not allowed to be installed into structures, use a wye into the storm pipe on all applicable lots. Engineers Response: 73. Provide information for proposed outlet structures at detention facilities to Ashworth Road right-of- way. VEENSTRA & KIMM COMMENTS 74. The 100 year flood limits should be indicated for all sump areas. 75. Overflow routes from the detention basin and sump areas should be indicated with arrows. 76. The northerly drainage and extension of the roadway of Sunflower Drive to the adjoining property should be clarified. 77. Intakes should be provided at the northerly end of Sunflower Drive and the westerly ends of Daybreak Drive and Daisy Drive. 78. We understand that Ashworth Road is designated as a major arterial on the major streets plan and the Kettlestone plans. Minimum right-of-way width for the major arterial is considered 120 feet. 79. The north part of the plat is proposed to be served with sanitary sewers connected to the sewer of Daybreak Plat 1 to the east. The south part of the plat is intended to be served by the future Daybreak Trunk Sewer to be located southeasterly of Ashworth Road. 80. The storm drainage computations appear reasonable. The off-site drainage of approximately 11 acres northerly and westerly should be verified regarding its impact downstream when developed. MISCELLANEOUS 81. Provide a copy of the Construction Site SWPPP Review Checklist signed by SWPPP designer. 82. Provide a copy of the SWPPP prepared for obtaining General Permit #2 coverage. 83. Provide a copy of the IDNR issued General Permit #2 authorization letter. 84. Complete COSESCO application and submit with $65 fee for the first required quarterly COSESCO inspection. 85. Provide temporary sediment basin if over 10 acres is disturbed. 86. The applicant will be required to provide the following as a part of the completion of the public improvements prior to approval of a certificate of occupancy: a. Post Construction What practices considered for this site? i. Provide a site plan specific to the storm water management facilities of the property indicating the permanent measures utilized by the designer and requirements for maintenance of said facilities. ii. A maintenance covenant will need to be created and provided for review. b. As-built plans of all storm water management facilities on site and a certification statement signed by SWPPP designer indicating that facilities were constructed as designed will be required. c. Provide finished grade spot elevations at all locations where an overland flowage easement crosses a property line, including locations where said easements run to the street. 87. Staff would request that the revised plans and comment response letter be provided in digital form (PDF) and hard copies with 5 full-sized hard copies delievered to Waukee City Hall. The PDF copy should be emailed. One additional hard copy set should be delivered directly to Veenstra and Kimm to Jordan Kappos’ attention. Should you have any questions or concerns regarding these comments, please feel free to contact Brad Deets (515-978-7899), Andy Kass (515-978-7897), or myself at (515) 978-7898. Sincerely, Melissa DeBoer, AICP Planner II