HomeMy WebLinkAbout2016-02-02-J07 Westown Pkwy Improvements Amendment 21 � ► O V/aukee `�■f r THE KEY TO GOOD LIVING AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: February 2, 2016 AGENDA ITEM: Consideration of approval of a resolution approving Amendment to Agreement between Shive-Hattery, Inc., and the City of Waukee [2015 Westown Parkway Improvement Project] FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The original Agreement with Shive-Hattery was for preliminary design, final design and bid process. The Amendment to the Agreement scope of services include and environmental trees survey for potential threatened and/or endangered species habitat, additional design for a right turn land addition to R22, Construction Engineering, and completion of as -build drawings. FISCAL IMPACT INCLUDING COSTBENEFIT ANALYSIS: Not To Exceed $56,700 COMMISSIONIBOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the resolution approving the Amendment to the Agreement between Shive-Hattery and the City of Waukee in the not to exceed amount of $56,700. ATTACHMENTS: I. Amendment to Agreement PREPARED BY: Beth Richardson Z/ REVIEWED BY: John Gibson PUBLIC NOTICE INFORMATION — NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 16- APPROVING AMENDMENT NO.2 TO AGREEMENT BETWEEN SHIVE-HATTERY, INC., AND THE CITY OF WAUKEE [2015 WESTOWN PARKWAY IMPROVEMENT PROJECT] IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, on May 4, 2015, the Waukee City Council approved an Engineering Services Agreement with Shive Hattery for civil engineering and land surveying services related to the 2015 Westown Parkway Improvement Project (Resolution 415-135); AND, WHEREAS, on November 2, 2015, the Waukee City Council approved an amendment to said Engineering Services Agreement related to wetland and stream delineation services for the project as required by the U.S. Army Corps of Engineers (Resolution #15-376); AND, WHEREAS, the City proposes an Amendment No. 2t to the Engineering Services Agreement for services to include environmental tree survey for potentially threatened or endangered species habitat, additional design for turn lanes, construction engineering, and completion of "as built' drawings; AND, WHEREAS, the engineering services amendment, attached hereto as Exhibit A, has been reviewed and approved by the Waukee City Attorney. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee that Amendment No. 2 to Agreement between Shive-Hattery, Inc., and the City of Waukee [2015 Westown Parkway Improvement Project], is hereby approved. Passed by the City Council of the City of Waukee, Iowa, and approved the 2"d day of February, 2016. William F. Peard, Mayor Attest: Rebecca D. Schuett, City Clerk ROLL CALL VOTE AYE NAY ABSENT ABSTAIN Shane Blanchard Brian Harrison Shelly Hughes Larry R. Lyon Rick Peterson SHIVCFIA-FrERY A R C H I T E C T U RE. E N G IN E E R ING AMENDMENT TO AGREEMENT between SHIVE-HATTERY, INC. AND THE CLIENT PROJECT NAME: Waukee — 2015 Westown Parkway Improvements CLIENT NAME: City of Waukee AMENDMENT NO.: 002 ORIGINAL AGREEMENT DATE: May 4, 2015 AMENDMENT DATE: January 21, 2016 City of Waukee, Iowa and Shive-Hattery, Inc. (S-H) agree to amend the Original Agreement as follows: A. SCOPE OF SERVICES: 1. Tree Survey a. Visually survey and document the existing trees in the area that are potential threatened and/or endangered species habitat. This is a result of information requested by USACE in order to approve the project under a nationwide Section 404 permit. b. Shive-Hattery to prepare memorandum on the trees and submit to USACE c. Staking of Tree Removal Limits 2. Right Turn Lane addition to R-22 (Ute Ave) a. A northbound right turn lane is to be added to R-22. The turn lane will be designed as an urban turn lane with a 50' storage bay and 15:1 taper b. Driveway into adjacent property will be reconfigured to accommodate right turn lane c. Additional topographic survey will be required for the driveway d. Temporary easement exhibits will be prepared for the right turn lane e. Traffic control along R-22 will be modified to accommodate turn lane 3. Construction Engineering a. Complete construction engineering and administration for the project, construction engineering to include I. Pre -construction Meeting ii. Weekly on -site construction meetings (assumed April 2016-November 2016), including meeting minute documentation iii. Pay application processing monthly in coordination with Waukee on -site construction representative iv. Change order processing and approvals in coordination with City of Waukee v. Shop drawing review vi. Engineering of changes during construction of limited scope, changes resulting from a change to the overall scope of the project would not be included in this item. These include but are not limited to, changes to the length of the project, typical section, length of turn lanes and tapers on R-22 would not be included. Project #415185-0 Shive-Hattery 1412SWestown Parkway I Suite 1001 West Des Moines,IAS0266 I SI S.223.8104 If" 515.223.0622 1 shive-hattery.cm vii. Final walk through and punchlist development viii. Project Closeout ix. Task does not include: Construction inspection or observation, material testing, and safety inspections of any kind b. As -built plans to be completed by Shive-Hattery. i. As -built plans to be the design plans, revisions issued during construction, and inclusion of field notes and data provided to Shive-Hattery by the City of Waukee construction representative. B. CLIENT RESPONSIBILITIES: Provide on -site construction representative to coordinate with Shive-Hattery for preparation and processing of construction engineering and as -built related items listed previously. C. SCHEDULE: Construction scheduled to be substantially completed in 2016; final seeding and site restoration may extend to spring of 2017. As -built survey may be completed in 2017 depending on construction completion date. D. COMPENSATION: $56,700 Not To Exceed 1. Tree Survey: $3,000.00 2. Right Turn Lane Addition to R-22: $5,000.00 3. Construction Engineering and Administration, As Built Survey: $48,000.00 + $700.00 expenses, Total $48,700 E. ATTACHMENTS: NO CHANGE F. AGREEMENT: This Amendment is subject to all other terms and conditions of the Original Agreement. Return one signed copy to Shive-Hattery. G. ACKNOWLEDGEMENT OF APPROVAL AND OF AMENDMENT: CITY OF WAUKEE, IOWA SHIVE-HATTERY, By: Printed Name: Printed Name: Michael L. Anthony, PE Title: Title: Project Manager Date Accepted: Project#415185-0 1 Date —January 21, 2016 SHM-D-IATTERY A R C H I i E C 10 R E, E N 0 1 N E E R I NC