Loading...
HomeMy WebLinkAbout2016-02-16-J03 Cove at Kettlestone Apartments - Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: February 16, 2016 AGENDA ITEM: Consideration of approval of a resolution approving site plan for The Cove at Kettlestone Apartments FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The applicant, Bricktowne Waukee, LLC, is requesting approval of a site plan for 216 apartments, two garage bays and a clubhouse within the Cove at Kettlestone Development generally located south of University Avenue and west of SE Waco Place. The developer received approval of the rezoning of the Cove at Kettlestone Development in 2015 to allow for a combination of row house dwellings, apartments, mixed use retail/residential and commercial development. The property is located within the limits of the overall Kettlestone Development Overlay, however, zoning on this project was done through a Planned Development Document and was completed prior to adoption of the Kettlestone Plan. The proposed apartment project meets the requirements of the Planned Development Overlay for the property and generally follows the architectural and design guidelines of the larger Kettlestone area. A park has not been designated for this general vicinity. Two larger parks within Kettlestone are planned further to the south and southwest. The developer is satisfying its parkland dedication requirements with a combination of trails internal to the development and a cash payment in lieu of parkland dedication. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the request at their meeting on February 9, 2016 and recommended approval: Approval of a Site Plan for Cove at Kettlestone Apartments Senior Planner Andy Kass stated that the site plan, brought forth by applicant Bricktowne Waukee LLC, set to build 3 apartment buildings containing 72 units for a total of 216 units in the 9.92 acre site south of SE University Ave and West of SE Waco place. This property was the subject of a rezoning in early 2015 moving from a Community and Highway Service Commercial District to a planned development, community and highway service Commercial District. Mr. Kass pointed out that the area would provide Maintenance and club house as well as a pool for resident amenities, with 31 garage units and 384 Surface parking spaces provided sidewalks provided. Mr. Kass also explained that a 10 foot trail on the south side of area would be provided from SE Waco Place to SE University Avenue. There will be one access on SE Bishop Drive and an Access off of SE Waco Place as well. Utilities will extend water and sanitary off of SE Waco Place and SE Bishop Drive to be owned and maintained privately. Mr., Kass stated that there would be one pond on the North side of area, street trees provided on SE bishop drive, and 2 trash enclosures provided for the area. The design for the Apartments would be primarily comprised of red brick following the Kettlestone Design guidelines.  Commissioner Streit questioned the landscape and the provision of a vegetation buffer between the two proposed sites. Mr. Kass answered that the townhome developer would be responsible for most of the buffer, but did point out a section that the apartments may be responsible for.  Commissioner Streit also questioned an anticipated construction schedule to which the representative of both companies, Seth, advised that they would like to start as soon as possible and that they were interested in getting started on the apartments before the townhomes.  Commissioner Broderick clarified that there were only two trash areas for the entire complex and if there were any walk ways between the buildings or if someone would be walking across the parking lot. Mr. Kass advised that there was a small walk way, but that the majority of the area was for the parking requirement, and clarified that there were only two trash areas at this time.  Commissioner Streit questioned the viability of snow removal in the apartment parking area. Mr. Kass advised that there was not a set way to go about it aside from waiting for the majority of the tenants to be away for the day. Motion by commissioner Streit, seconded by Commissioner Broderick to approve the Site Plan for Cove at Kettlestone Apartments, subject to any remaining staff comments and review of all legal documents by the City Attorney. Ayes: Fontenot, Streit, Broderick, and Shanks. Nays: none STAFF REVIEW AND COMMENT: At this time, all staff comments related to the site plan have been addressed and staff would recommend approval. RECOMMENDATION: Approve the Resolution. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Staff Comment Letter IV. Site Plan V. Building Elevations PREPARED BY: Brad Deets REVIEWED BY: PUBLIC NOTICE INFORMATION THE CITY OF WAUKEE, IOWA RESOLUTION 16- APPROVING THE SITE PLAN FOR COVE AT KETTLESTONE APARTMENTS IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for the Cove at Kettlestone Apartments on February 9, 2016; AND, WHEREAS, the Site Plan for the Cove at Kettlestone Apartments is in general conformance with §304 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for the Cove at Kettlestone Apartments is in general conformance with §301.27(A) – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 16th day of February 2016 that the Site Plan for the Cove at Kettlestone Apartments is approved. ____________________________ William F. Peard, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk ROLL CALL VOTE AYE NAY ABSENT ABSTAIN Shane Blanchard Brian Harrison Shelly Hughes Larry R. Lyon Rick Peterson STAFF REPORT TO: Planning and Zoning Commission PREPARED BY: Melissa DeBoer RE: Cove at Kettlestone Apartments – Site Plan DATE: February 9, 2016 GENERAL INFORMATION: Applicant: Bricktowne Waukee, LLC Requested Action Site Plan Approval Location and Size: Property is generally located south of SE University Avenue and west of SE Waco Place containing 9.22 acres more or less. LAND USES AND ZONING: Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant - Undeveloped Waukee Futures Corridor PD/C-1 North Multi-Family Residential/Single Family Residential/Commercial Neighborhood Residential C-1A/R-3/C-4/R-5 South Vacant - Undeveloped Waukee Futures Corridor A-1 East Vacant – City of West Des Moines N/A N/A West Vacant - Undeveloped Waukee Futures Corridor A-1 BACKGROUND: The subject property is located south of SE University Avenue and west of SE Waco Place and is approximately 9.22 acres in area. This property was the subject of a rezoning in early 2015 that rezoned the property from C-1 (Community and Highway Service Commercial District) to PD/C-1 (Planned Development/ Community and Highway Service Commercial District). The preliminary and final plats for this development were approved in the fall of 2015. February 5, 2016 2 of 3 ABOVE: Aerial photo of proposed site plan outlined in RED in relation to the surrounding properties PROJECT DESCRIPTION: The site plan includes a total of three apartment buildings. All of the apartment buildings are three story and contain a total of 72 apartment units each (49 one bedroom and 23 two bedroom units per building). The site also includes a total of 31 garage units located on the west side of the site. One garage building will include 13 garage units and the other garage building will include 18 garage units. A clubhouse/maintenance building is proposed on the northwest portion of the site along with a fenced-in pool area immediately behind the clubhouse. ACCESS AND PARKING: Access to the site will be provided in two locations, one access will be located on the north side of the site off of SE Bishop Drive and the other access will be located on the east side of the site off of SE Waco Place/98th Street. A total of 384 parking spaces are required for this facility. The total amount of parking proposed is 384 spaces. This includes a total of 31 garage spaces and 14 handicap accessible stalls. Traffic throughout the parking lot will be two-way traffic. SIDEWALKS/TRAILS: A five foot wide sidewalk will be installed on the north side of the site along SE Bishop Drive. A ten foot wide trail will be installed along the east side of the site along SE Waco Place/98th Street. Sidewalk connections are being provided from the apartment buildings to the trail along SE Waco Place. Another sidewalk connection is provided from the apartment building on the north to the sidewalk located along SE Bishop Drive. February 5, 2016 3 of 3 UTILITIES: All buildings are serviced with public utilities. Storm water detention for the proposed development will be provided in a detention basin located at the northeast side of the site. This detention basin is proposed to be a dry bottom detention basin and will be seeded. OPEN SPACE AND LANDSCAPING: A minimum of 15% of the project area is required to be open space. The total project area is 9.22 acres and the proposed amount of open space is 40% of the project area. Street trees are proposed along both SE Bishop Drive and SE Waco Place/98th Street as part of the landscaping requirements for this site. ELEVATIONS: Elevations have been provided for your review. The elevations of all buildings are proposed as being composed of primarily brick. Material samples will be available at the meeting for your reference. MISCELLANEOUS: Two trash enclosures are proposed located in the center of the parking lot. A detail has been provided within the site plan and complies with the Site Plan Ordinance. A lighting plan has been submitted and the proposed lighting is in compliance with the Site Plan Ordinance. STAFF RECOMMENDATION At this time Staff feels comfortable with the proposal and would recommend approval of the Site Plan for the Cove at Kettlestone Apartments subject to remaining staff comments. CITY OF WAUKEE Melissa DeBoer, AICP Planner II Development Services Department 230 W. Hickman Road Waukee, IA 50263 Phone: (515) 978-9533 Fax: (515) 987-1845 1st Review: December 2, 2015 2nd Review: January 5, 2016 3rd Review: February 5, 2016 4th Review: Snyder & Associates, Inc. Attn: Eric Cannon 2727 SW Snyder Blvd Ankeny, IA 50023 RE: Cove at Kettlestone Apartments – Site Plan Dear Mr. Cannon: Per your request, staff has reviewed the proposed site plan for the Cove at Kettlestone Apartments. The property is located at the southwest corner of SE University Avenue and SE Waco Place / 98th Street. Based upon our review, staff has the following comments related to the site plan: SITE PLAN: COVER SHEET & GENERAL COMMENTS 1. In addition to the 98th Street label, please label SE Waco Place on the vicinity map. Waco is spelled incorrectly. 2. Please provide project manager contact information on the cover sheet. 3. Please provide elevations of the clubhouse, maintenance building, garages and trash enclosures with the next submittal. 4. Staff questions if all of the apartment buildings will be identical to the building elevations that were submitted. 5. Please provide a materials board with the next submittal. 6. Please note that a minimum of 2.26 acres of parkland dedication is required with this development. Please provide how this parkland dedication requirement will be met. 7. Staff questions how mail service will be provided throughout this development. Will there be mailbox pads or are the boxes located inside the apartment buildings? Please address. 8. Please provide a photometric plan with the next submittal. 9. Please provide details of any proposed lighting with the next submittal. 10. Staff questions if any monument signage is proposed with this project. If so, please provide details including the location, size, material, lighting, etc. 11. Please add a note to notify the City of Waukee prior to any weekend or holiday work. Please remove reference to the Engineering Department. Project Name Project Engineer/Manager Project Type City Contact Cove at Kettlestone Apartments Eric Cannon Site Plan Melissa DeBoer SHEET 2 | PROJECT INFORMATION 12. In General Note T, please revise to have changes approved by the City of Waukee Development Services Department rather than the Engineering Department. 13. Please provide open space calculations. 14. Please remove “minimum of two stories” under Bulk Regulations in order to be consistent with the Planned Development document for the Cove at Kettlestone development. 15. Revise the elevations on the bench marks to reflect Waukee Datum. 16. Information provided in POLLUTION PREVENTION NOTES C.e. states 7 days for correction and sheet 7 states 3 days, please revise for consistency with SWPPP. 17. Staff questions if the apartments will be built in phases. If so, please provide a phasing plan. 18. Please provide the impervious surface area in square feet for calculating the Storm Water Utility Billing Rate. 19. Please indicate the overall site address of 1300 SE Waco Place. Also, please indicate the legal description of the property. 20. Addresses for the proposed buildings should be indicated. See attached document for assigned addresses. The City does not assign addresses for individual units, but would suggest that the developer begin each floor with 101 on the first floor, 201 second floor, 301, third floor. SHEET 3 | DIMENSION PLAN 21. Staff questions what the plans are for trash service to this site. Please address. 22. Please revise Note 2.D. to 6 inch PCC for the trail. 23. Please label the sidewalk easement along SE Waco Place/98th Street. 24. Show curb ramps where the trail and sidewalk intersect at the southwest corner of SE Bishop Drive and SE Waco Place/98th Street. 25. Please provide sidewalk connections from the private sidewalks located at both the north and south sides of the parking lot to the public trail located along SE Waco Place/98th Street. The Site Plan Ordinance requires that pedestrian corridors to be provided from any public street to all proposed principal buildings. 26. The driveway approach onto Bishop is to utilize “Type A” (SUDAS) connection with expansion joint. 27. The driveway approach paving in ROW is to be same thickness as Bishop Dr (8”). 28. Please label the dimensions for the public sidewalk and trail. 29. Please label locations of warning panels on the plan. 30. Verify that the east property line of the site is accurate. 31. Fencing around the pool should be indicated. In addition, a detail of the fencing should be provided for review. 32. Please provide a development timeline for this project. Will it be constructed in phases or all at once. 33. Staff questions if the trash enclosure locations will allow for maneuverability of garbage truck. 34. Proposed monument signage location should be noted. Minimum 15 foot setback. Please note on the plans that all proposed monument signage will require a permit from the Development Services Department. SHEET 4 | WATER MAIN AND SANITARY SEWER PLAN 35. Call out all critical crossings, including water, with top and bottom of pipe elevations. 36. Please provide a note that all hydrants are to have Storz fittings. 37. Please label 8x6 tee for building services or add to note 3.C. 38. Please note the tee at SE Waco Place is to be 16x8 tapping sleeve. This appears to have been labeled incorrectly. 39. Please revise hydrant label at southwest corner of site to be 3D. SHEET 5 | STORM SEWER PLAN 40. Provide critical crossing information for ST-34 to ST-35 with water. SHEET 6 | GRADING AND EROSION CONTROL PLAN 41. Provide 100-year flood elevations for detention and sump areas. Please illustrate these areas. 42. Please illustrate the percent grade across the development and swales. 43. Please illustrate overflow routes with elevations. 44. Please verify that grades shown along SE Waco Place/98th Street are consistent with the SE Waco Place/98th Street plans. 45. Please provide the area of disturbance calculation. 46. Provide the indicate and illustrate the 100 year flood elevation for the pond west of this site. In addition, indicate the overflow route and overflow elevation. The normal pool elevation should be idnciated and illustrated if applicable. SHEET 8 | PLANTING PLAN 47. Please show and label mechanical units on this plan as well as provide a detail of how these will be screened. 48. Please revise Planting Plan General Note F to “Sod all areas disturbed…” 49. Please provide landscaping throughout the middle parking lot island located in the middle of the parking lot. Provide a detail of what the low grow grass will look like. In addition, the native grass plantings in this area trees should be added to the islands and medians to meet landscaping requirements. The landscaping and open space ordinance requires that all landscaped islands be planted with at least one ornamental or one deciduous tree. There are multiple island off of the large median in the middle that do not have at least one tree. Please add tree to comply with the ordinance. Staff would also suggest adding trees to the median as well. 50. Please label which areas are to be sodded versus seeded. 51. Please provide seed mix design. 52. Staff questions if any type of fencing will be provided. If so, please include locations and details including material, height, color, etc. 53. Verify that street trees along SE Waco Place and SE Bishop Drive are not included in the count to satisfy the required amount of plantings to satisfy the open space requirements. The street tree requirements are separate and should be noted on the landscaping plan. SHEET 9 | DETAILS 54. Please provide the City of Waukee fire hydrant detail and provide note for Fire Hydrant Assembly to install Storz fittings on all hydrants. Staff has attached the City Hydrant Detail for your use. SHEET 10 | SIDEWALK RAMP DETAILS 55. Provide a standard detail for sidewalks within ROW. 56. Add dimensions (width information) to all details. 57. Please label the slopes on both sides of the sidewalk ramp rather than the middle and include these on all ramps. 58. Please label the cross slopes for all details (areas 3 & 4). 59. Please label all slope information for sidewalk ramp crossings (areas 8 & 9). 60. Staff questions if the slope of the sidewalk ramps for the ADA parking spaces can be lessened in order to not be at the maximum allowed slope. 61. The curb ramp for sidewalk detail should be updated to indicate 5 foot sidewalks on the detail and in note 2. 62. The general sidewalk and curb ramp detail should be updated to eliminate tied joints, expansion joint needs to be installed at back of curb and around the turning space and sealed. Update dimensions for width of 5 feet. Notes 5 and 6 can be deleted. 63. Area 8 detail should be updated to correct the width to 6’ instead of 6%. 64. Staff questions if anything can be done to bring down the running ramp slope on the west side of Area 8 closer to 6.5%. 65. Staff questions if anything can be done with the cross slopes at the maximum at Area 8. FIRE DEPARTMENT COMMENTS: 66. A site plan needs to be submitted to the Fire Department with a 1”-20’ or 1”-30’ to determine turning radius for our largest apparatus. 67. Add the locations of the Fire Department connections to confirm distance to hydrant. This appears that it will be fine with current hydrant locations as FDC will be required to be at main entrance address location. Fire hydrant is required to be within 100 feet of FDC. 68. A Knox box will be required at the main entrance on each building. 69. The hydrants in the southeast and southwest corner need to be positioned so they face the parking lot and will not be obstructed by parking stalls. 70. Apparatus access width is fine until it is directly in front of hydrants. Minimum clearance around a fire hydrant is 26 feet. Please see example below. 71. The Fire Department has run their turning template thru the site plan and have discovered that the east entrance has an access issue. Our largest apparatus will not be able to make entrance and turn south in the east entrance. The median width will need to be reduced and shortened. Turning south, we are unable to turn back west on both two southern aisles. The apparatus can not turn north from the south aisle at the Southeast corner of site. Attached are two photos. The yellow highlight of the southeast corner of shows the curb issues that need to be addressed. The red highlight are the areas where fire lanes signage will need to be installed per signs and markings of 511.4 of chapter 222 of the Municipal Code of Waukee. MISCELLANEOUS COMMENTS: 72. Provide a copy of the Construction Site SWPPP Review Checklist signed by the SWPP designer. 73. Complete COSESCO application and submit with $65 fee for the first required quarterly COSESCO inspection. 74. Provide a temporary sediment basin if over 10 acres is disturbed. 75. Post Construction What practices considered for this site? a. Provide a site plan specific to the storm water management facilities of the property indicating the permanent measures utilized by the designer and requirements for maintenance of said facilities. b. A maintenance covenant will need to be created and provided for review. c. As-built plans of all storm water management facilities on site and a certification statement signed by SWPPP designer indicating that facilities were constructed as designed will be required. Engineers Response: Should you have any questions or concerns regarding these comments, please feel free to contact Brad Deets (515-978-7899), Andy Kass (515-978-7897) or myself at Melissa DeBoer (515) 978-7898. Sincerely, Andy Kass, AICP Senior Planner OWNER/DEVELOPER 1"=500' VICINITY MAP 1 500'PROJECT LOCATION SE UNIVERSITY AVE.TITLE SHEET1COVE AT KETTLESTONE APARTMENTS INDEX OF SHEETS CITY OF WAUKEE, DALLAS COUNTY, IOWA MULTI - FAMILY RESIDENTIAL DEVELOPMENT FOR SITE PLAN SE BISHOP DRIVE Sheet 8 SIDEWALK RAMP DETAILS SITE DETAILS PLANTING PLAN EROSION AND SEDIMENT CONTROL PLAN GRADING PLAN STORM SEWER PLAN WATER AND SANITARY SEWER PLAN DIMENSION PLAN PROJECT INFORMATION TITLE SHEET LOT1 LOT2 LOT3 LOT4 LOT5 LOT6 OUTLOT "Z" 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. CONTACT: TODD PETERSEN AMES, IA 50014 4611 MORTENSEN ROAD, SUITE 106 BRICKTOWNE WAUKEE, LLC SE WACO PLACE/98TH STREETPROJECT MANAGER PHONE: 233-2752 CONTACT: TODD PETERSEN AMES, IA 50014 4611 MORTENSEN ROAD, SUITE 106 BRICKTOWNE WAUKEE, LLC Date IOWALICENSEDPROFESSIO N A LEN GI NEERLicense Number Pages or sheets covered by this seal: My License Renewal Date is December 31, 2017 18954 18954 CANNON ERIC D.Eric D. Cannon, P.E. under the laws of the State of Iowa. licensed Professional Engineer supervision and that I am a duly by me or under my direct personal engineering document was prepared I hereby certify that this Sheets 1-7, 9-10 STATE OF IO WA PROFESSIO N ALLANDSCAPE AR CHITECTDate License Number Pages or sheets covered by this seal: 512 NO. ARCHITECT LANDSCAPE Clay R. Schneckloth, ASLA 512 SCHNECKLOTH CLAY R. under the laws of the State of Iowa. Professional Landscape Architect charge. I am a duly licensed direct supervision and responsible below was prepared by me or under my this technical submission described I hereby certify that the portion of June 30, 2017 License Expires: BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.0886\Cadd\SP01_1150886_TSH.dgn1/28/20164:13:47 PMSnyder1:500pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.0886 115.088610 10EDCEDCJWM11-18-15COVE AT KETTLESTONE APARTMENTS1REVISED AS PER CITY COMMENTS12/23/15JWM2REVISED AS PER CITY COMMENTS01/28/16JWM PROJECT INFORMATION2 2ZONING GENERAL USE PARKING REQUIREMENTS: CONTROL POINTS IARTN DERIVED - US SURVEY FEET IOWA STATE PLANE SOUTH COORDINATE SYSTEM OF 6TH POWER POLE NW OF 98TH STREET. SET 1/2" REBAR WITH RED PLASTIC CAP APPROXIMATLY 55' NE OF RR TRACKS, 17' NE N=582615.07 E=1545099.92 ALICE'S ROAD. SET CUT "X" ON WEST END OF CENTER ISLAND ON UNIVERSITY AVE, EAST OF N=583274.48 E=1543827.85 BRICK DRIVE. SET CUT "X" ON WEST END OF CENTER ISLAND ON UNIVERSITY AVE, EAST OF SE N=583276.66 E=1544730.94 ENTRANCE TO WINHALL APARTMENTS. SET CUT "X" ON WEST END OF CENTER ISLAND ON UNIVERSITY AVE, EAST OF N=583274.75 E-1545387.19 PLACE, NORTH OF STREET LIGHT. SET CUT "X" IN CENTER OF SIDEWALK, NORTH SIDE OF UNIVERSITY, EAST OF WACO N=583316.05 E=1546598.58 SIDE OF WACO PLACE, NW OF LARGE POLE WITH ANTENNA. SET CUT "X" AT NE CORNER OF CONCRETE PAD OF WATER PUMP STATION ON WEST N=582768.4 E=1546447.64 PLACE, 5' SOUTH OF 3RD POWER POLE NORTH OF RR TRACKS. SET 1/2" REBAR WITH RED PLASTIC CAP AT TOP OF BANK, EAST SIDE OF WACO N=582329.84 E=1546516.75 OF RR TRACKS, ON EAST SIDE OF WACO PLACE, 10' EAST OF EDGE OF ROAD. SET 1/2" REBAR WITH RED PLASTIC CAP ON NORTH SIDE OF FIELD ENTRANCE, NORTH N=581926.84 E=1546506.45 CP13 CP10 CP9 CP8 CP5 CP4 CP3 CP2 BM3 BM2 BM1 BM93 BENCHMARKS APARTMENTS POLLUTION PREVENTION NOTES PRIOR TO FILING OF THE "NOTICE OF DISCONTINUATION". REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND SITE WASTE k. MUST BE CONTAINED ONSITE. BASIN OR OTHER CONTROL DEVICE WHERE POSSIBLE. CONCRETE WASHOUT DIVERSION BERMS AND/OR SILT BARRIERS AND DIRECT TO A SEDIMENT WASHOUT FACILITY. CONTROL RUNOFF FROM STAGING AREAS WITH AREA, TEMPORARY SANITARY FACILITIES, MATERIALS STORAGE, AND CONCRETE CONTAIN THE FOLLOWING: JOB TRAILERS, FUELING / VEHICLE MAINTENANCE IN THE SWPPP. UNLESS NOTED OTHERWISE, STAGING AREAS SHOULD COORDINATE LOCATIONS OF STAGING AREAS WITH THE OWNER AND RECORD j. CALENDAR DAYS. ACTIVITY HAS FINISHED OR IS PLANNED TO BE DELAYED MORE THAN 21 MEASURES NO LATER THAN 14 CALENDAR DAYS AFTER CONSTRUCTION COMPLETION OR DELAY OF GRADING OPERATIONS. INITIATE STABILIZATION MIX, PERMANENT SEED MIX, OR SOD AS SOON AS PRACTICAL UPON STABILIZE UNDEVELOPED, DISTURBED AREAS WITH MULCH, TEMPORARY SEED i. OTHER IMPROVEMENTS ARE LOCATED. IN SOD) ON ALL DISTURBED AREAS, EXCEPT WHERE PAVEMENT, BUILDINGS OR RESPREAD A MINIMUM OF 6 INCHES OF TOPSOIL (INCLUDING TOPSOIL FOUND h. CONTROL MEASURES AS SOON AS STORM SEWERS ARE INSTALLED. TO ENSURE CONTINUOUS RUNOFF CONTROL. PROVIDE INLET AND OUTLET REACH THEIR FINAL GRADES AND AS CONSTRUCTION OPERATIONS PROGRESS CONTROL MATS, MULCH, DITCH CHECKS OR RIPRAP AS SOON AS AREAS INSTALL NECESSARY CONTROL MEASURES SUCH AS SILT BARRIERS, EROSION g. REMEDIAL ACTIONS FOR FUTURE PREVENTION. REMOVE ANY ACCUMULATION OF EARTH OR DEBRIS IMMEDIATELY AND TAKE STREETS, DRIVEWAYS, SIDEWALKS, DRAINAGEWAYS, OR UNDERGROUND SEWERS. ACTIVITIES ON ADJOINING PUBLIC OR PRIVATE PROPERTIES, INCLUDING PREVENT ACCUMULATION OF EARTH AND DEBRIS FROM CONSTRUCTION f. ANY RECOMMENDED MEASURES WITHIN 3 DAYS. OR ENGINEER DURING CONSTRUCTION. REVISE THE SWPPP AND IMPLEMENT ACTIONS IN THE SWPPP WITH A COPY SUBMITTED WEEKLY TO THE OWNER DAYS. RECORD THE FINDINGS OF THESE INSPECTIONS AND ANY RESULTING PERSONNEL ASSIGNED BY THE CONTRACTOR) EVERY SEVEN CALENDAR INSPECT THE PROJECT AREA AND CONTROL DEVICES (BY QUALIFIED e. ORIGINAL CAPACITY. SILT CONTROL DEVICES WHEN THE MEASURES HAVE LOST 50% OF THEIR SEDIMENT REMOVAL THROUGHOUT THE PERMIT PERIOD. CLEAN OR REPLACE WORKING ORDER, INCLUDING CLEANING, REPAIRING, REPLACEMENT, AND MAINTAIN ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES IN d. OPERATIONS AT ANY TIME. AND LIMIT TO A MINIMUM THE TOTAL AREA DISTURBED BY CONSTRUCTION PRESERVE EXISTING VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION c. GRADING OPERATIONS. DOWNSTREAM OF SOIL DISTURBING ACTIVITIES PRIOR TO SITE CLEARING AND BARRIERS, DITCH CHECKS, DIVERSION BERMS, OR SEDIMENTATION BASINS INSTALL PERIMETER AND FINAL SEDIMENT CONTROL MEASURES SUCH AS SILT b. AND MINIMIZE SOIL COMPACTION. INCREASE SEDIMENT REMOVAL AND MAXIMIZE STORM WATER INFILTRATION, AROUND SURFACE WATERS, DIRECT STORM WATER TO VEGETATED AREAS TO WHEN DISCHARGING FROM BASINS, PROVIDE AND MAINTAIN NATURAL BUFFERS UTILIZE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE a. FOLLOWING BMP'S UNLESS INFEASIBLE OR NOT APPLICABLE: THE GENERAL PERMIT AND SWPPP, INCLUDING, BUT NOT LIMITED TO, THE THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL REQUIREMENTS OF 4. CONSTRUCTION PROGRESS AND CHANGES AT THE PROJECT SITE. THE SWPPP AND SITE MAP SHOULD BE EXPEDITIOUSLY REVISED TO REFLECT 3. PLAN MAY BE REQUIRED. IDENTIFY, NOTE AND IMPLEMENT. ADDITIONAL BMP'S FROM THOSE SHOWN ON THE CONSTRUCTION ACTIVITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR TO BMP'S AND EROSION CONTROL MEASURES REQUIRED AS A RESULT OF (BMP) FOR COMPLIANCE WITH THE PROJECT'S NPDES PERMIT COVERAGE. ALL THE SWPPP ILLUSTRATES GENERAL MEASURES AND BEST MANAGEMENT PRACTICES 2. THE POLLUTION PREVENTION PLAN MADE DURING CONSTRUCTION. REFER TO THE SWPPP FOR ADDITIONAL REQUIREMENTS AND MODIFICATIONS TO DOCUMENT IN ADDITION TO THESE PLAN DRAWINGS. THE CONTRACTOR SHOULD THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS A SEPARATE 1. POLLUTION PREVENTION PLAN:C. AND/OR SUBMITTAL OF THE NOTICE OF DISCONTINUATION. PROVIDE THE ORIGINAL DOCUMENTS TO THE OWNER UPON PROJECT ACCEPTANCE PROJECT COMPLETION. THE CONTRACTOR SHALL RETAIN A RECORD COPY AND DOCUMENTS MUST BE RETAINED FOR A PERIOD OF THREE YEARS AFTER EROSION CONTROL MEASURES. ALL PLANS, INSPECTION REPORTS, AND OTHER STABILIZATION OF THE DISTURBED SITE AND REMOVAL OF ALL TEMPORARY A "NOTICE OF DISCONTINUATION" MUST BE FILED WITH THE IDNR UPON FINAL 3. AND THE CODE OF IOWA. THE NPDES PERMIT REQUIREMENTS IS A VIOLATION OF THE CLEAN WATER ACT TO ANY JURISDICTIONAL AGENCIES UPON REQUEST. FAILURE TO COMPLY WITH OTHER ITEMS, SHALL BE KEPT ON SITE AT ALL TIMES AND MUST BE PRESENTED DISCHARGE AUTHORIZATION LETTER, CURRENT SWPPP, SITE INSPECTION LOG, AND BUT NOT LIMITED TO, THE NOTICE OF INTENT, PROOF OF PUBLICATIONS, ALL DOCUMENTS RELATED TO THE STORM WATER DISCHARGE PERMIT, INCLUDING, 2. PERMIT COVERAGE FROM THE IDNR. POLLUTION PREVENTION PLAN (SWPPP) AND POSSIBLY OBTAINING THE GENERAL GENERAL PERMIT NO. 2 INCLUDING CREATING OR MAINTAINING THE STORM WATER FOR COMPLIANCE WITH AND FULFILLMENT OF ALL REQUIREMENTS OF THE NPDES (EPA). THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FROM THE IDNR, AS REQUIRED BY THE ENVIRONMENTAL PROTECTION AGENCY FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES THIS PROJECT REQUIRES COVERAGE UNDER THE NPDES GENERAL PERMIT NO. 2 1. STORM WATER DISCHARGE PERMITB. THE COST THEREOF FROM AMOUNTS DUE TO THE CONTRACTOR. PROPERTY, THE OWNER MAY, BUT NEED NOT, REMOVE SUCH ITEMS AND DEDUCT SEDIMENTATION OR DEBRIS WHICH COMES ONTO ADJOINING PUBLIC OR PRIVATE CONTRACTOR FAILS TO TAKE NECESSARY STEPS TO PROMPTLY REMOVE EARTH INCLUDING REASONABLE ATTORNEY FEES INCURRED TO OWNER. FURTHER, IF THE RESULTING FROM DAMAGES TO ADJOINING PUBLIC OR PRIVATE PROPERTY, ENGINEER HARMLESS FROM ANY AND ALL CLAIMS OF ANY TYPE WHATSOEVER DAMAGE CLAIMS: THE CONTRACTOR WILL HOLD THE OWNER AND ARCHITECT / 2. DURING PERFORMANCE OR AS A RESULT OF PERFORMANCE. FROM THIS PROJECT SITE AND ALL OFF-SITE BORROW OR DEPOSIT AREAS TAKE ALL NECESSARY STEPS TO PROTECT AGAINST EROSION AND POLLUTION U.S. CLEAN WATER ACT AND ANY LOCAL ORDINANCES. THE CONTRACTOR SHALL CODE, THE IOWA DEPARTMENT OF NATURAL RESOURCES (IDNR) NPDES PERMIT, THE POTENTIAL POLLUTION AND SOIL EROSION CONTROL REQUIREMENTS OF THE IOWA CODE COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL 1. POLLUTION PREVENTION AND EROSION PROTECTIONA. 93 93.0 93 C OC FO E OE 4" G 4" HPG 8" W 8" S 12" ST12" ST G G AST UST Features Existing Proposed G EB W LEGEND 8" W(*) 8" S(*) 4" G(*) 4" HPG(*) C(*) OC(*) FO(*) E(*) OE(*) DUCT(*) 93.0 1 Soil Boring Mailbox Satellite Dish Sign Above Ground Storage Tank Underground Storage Tank Fence Post or Guard Post Gas Apparatus Gas Manhole Gas Valve Fiber Optic Handhole Fiber Optic Manhole Communication Handhole Communication Manhole Communication Pedestal Traffic Sign Electric Transformer Electric Box Yard Light Street Light Utility Pole with Transformer Utility Pole with Light Guy Anchor Utility Pole Well Water Service Valve Water Main Valve Fire Hydrant on Building Fire Hydrant Double Storm Sewer Intake Single Storm Sewer Intake Storm Manhole Storm Sewer with Size Sanitary Manhole (*) Denotes the survey quality service level for utilities Test Hole Location for SUE w/ID Duct Bank Sanitary Sewer with Size Water Main with Size High Pressure Gas Main with Size Gas Main with Size Overhead Electric Underground Electric Fiber Optic Overhead Communication Communication Coniferous Tree or Shrub Deciduous Tree or Shrub Tree Stump Tree Line Fence (Silt) Fence (Wood) Fence (Chain Link) Fence (Barbed, Field, Hog) Contour Elevation Spot Elevation UTILITY CONTACT INFORMATION SYSTEM, TICKET NUMBER 551501715. RECEIVED FROM THE IOWA ONE CALL DESIGN REQUEST UTILITY CONTACT FOR MAPPING INFORMATION SHOWN AS UTILITY WARNING UTILITY QUALITY SERVICE LEVELS THE TYPE, SIZE, CONDITION, MATERIAL, AND OTHER CHARACTERISTICS. BY ACTUAL EXPOSURE OR VERIFICATION OF PREVIOUSLY EXPOSED SUBSURFACE UTILITIES, AS WELL AS IS HORIZONTAL AND VERTICAL POSITION OF UNDERGROUND UTILITIES OBTAINEDQUALITY LEVEL (A) SUBSURFACE UTILITIES. GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF INFORMATION IS OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE QUALITY LEVEL (B) QUALITY D INFORMATION. UTILITY FEATURES AND USING PROFESSIONAL JUDGMENT IN CORRELATING THIS INFORMATION WITH INFORMATION IS OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND QUALITY LEVEL (C) INFORMATION IS DERIVED FROM EXISTING UTILITY RECORDS OR ORAL RECOLLECTIONS.QUALITY LEVEL (D) APPLICABLE, SIZE. THE QUALITY LEVELS ARE BASED ON THE CI / ASCE 38-02 STANDARD. QUALITY LEVELS OF UTILITIES ARE SHOWN IN THE PARENTHESES WITH THE UTILITY TYPE AND WHEN EXCEPT WHERE NOTED AS QUALITY LEVEL A. UTILITIES OR SUBSURFACE FEATURES SHOWN ARE IN THE EXACT LOCATION INDICATED SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE SUBSURFACE FEATURES SHOWN COMPRISE ALL SUCH ITEMS IN THE AREA, EITHER IN RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES OR THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDED IN BOOK 2015 PAGE 9498 COMMERCIAL DISTRICT) (COMMUNITY AND HIGHWAY SERVICE PLANNED UNIT DEVELOPMENT / C-1 GENERAL NOTES CONVERSION TO NORTH AMERICAN VERTICAL DATUM OF 1988 = +774.01 IARTN DERIVED - US SURVEY FEET WEST DES MOINES DATUM Contact Email : troyer@waukee.org 515-978-7920 Tim Royer WAUKEE, CITY OF Gary@nexgencom.com 515-369-9000 Gary Reimers NEXGEN INTEGRATED COMMUNICATIONS Contact Email : troyer@waukee.org 515-978-7920 Tim Royer WAUKEE, CITY OF Thomas.sturmer@centurylink.com 303-664-8090 Tom Sturmer CENTURYLINK pmay@mediacomcc.com 515-246-2252 Paul May MEDIACOM COMMUNICATIONS CORP Joel.Schroeder@windstream.com 800-289-1901 JOEL SCHROEDER WINSTREAM MCLEOD MECDSMDesignLocates@midamerican.com 515-252-6632 Craig Ranfeld MIDAMER-ELEC jeff@netins.com 515-830-0445 Jeff Klocko IOWA NETWORK SERVICES Joni.McCabe@HickoryTech.com 507-387-1770 Joni McCabe HICKORY TECH GAS NO RESPONSE W-2 C-1 CLEAR C-2 OE/E C-2 FO1 BULK REGULATIONS IMPERVIOUS AREA PERVIOUS AREA (INCLUDES 31 GARAGE STALLS AND 14 ADA STALLS) 384 SPACES TOTAL PROVIDED 339 SPACES TOTAL REQUIRED 216 UNITS / 4 = 54 SPACES 1 SPACE X 147 UNITS = 147 SPACES 2 SPACES X 69 UNITS = 138 SPACES 1 SPACE PER 4 UNITS 1 SPACE PER EFFICIENCY OR 1 BEDROOM UNIT 2 SPACES PER TWO BEDROOM OR LARGER UNIT MINIMUM OPEN SPACE = 15% NUMBER OF STORIES = MAXIMUM 4 REAR YARD = 20 FEET SIDE YARD = 15 FEET FRONT YARD = 15 FEET STREET) LOT WIDTH = 60 FEET MINIMUM(FRONTING A PUBLIC OR PRIVATE EFFICIENCY AND ONE(1) BEDROOM UNITS CAN BE 600 SQUARE FEET) MINIMUM FLOOR AREA = 750 SQUARE FEET PER UNIT(EXCEPT FOR DENSITY = 20 DWELLING UNITS/ACRE MAXIMUM UNIVERSITY AVE, WEST OF PEOPLE'S BANK. NW UPPER BOLT ON YELLOW HYDRANT ON NORTH SIDE OF ELEV=284.334 (1058.344 WAUKEE DATUM) AVE, EAST OF WINHALL APARTMENTS, 7' EAST OF STREET LIGHT. BURY BOLT ON YELLOW HYDRANT ON NORTH SIDE OF UNIVERSITY ELEV=287.289 (1061.299 WAUKEE DATUM) TOWER ON EAST SIDE OF WACO PL, SOUTH OF RR TRACKS. BURY BOLT ON WATROUS HYDRANT, NORTH OF ENTRANCE TO WATER ELEV=281.745 (1055.755 WAUKEE DATUM) WACO PL, 147' SOUTH OF CENTERLINE OF SE UNIVERSITY AVE. STANDARD CITY OF WEST DES MOINES BENCHMARK, EAST SIDE OF ELEV=272.57 (1046.58 WAUKEE DATUM) 237,566 SF 164,127 SF OF WAUKEE PUBLIC WORKS SHALL WITNESS ALL TIE-INS. BB. CONTRACTOR SHALL COORDINATE ALL TIE-IN TO UTILITIES WITH THE CITY OF WAUKEE PUBLIC WORKS DEPARTMENT AND CITY CONCRETE OPERATIONS TO DISCHARGE OFFSITE. AA. CONSTRUCTION OPERATIONS SHALL PROTECT STORM SEWERS AND DRAINAGE WAYS FROM ALLOWING CONCRETE SLURRY FROM PUBLIC IMPROVEMENTS AND ALL UTILITIES SHALL BE TESTED TO CITY STANDARDS. THE CITY SHALL WITNESS ALL TESTING. Z. ALL UTILITIES INCLUDING PRIVATE UTILITIES SHALL BE CONSTRUCTED TO THE CITY OF WAUKEE STANDARD SPECIFICATIONS FOR TO THE DESIGN ENGINEER FOR INCLUSION ON THE RECORD AS-BUILT DRAWINGS. DRAINAGE SWALES, OVERFLOWS, ACCESSIBLE RAMPS AND DETENTION FACILITIES. THE CONTRACTOR SHALL PROVIDE INFORMATION Y. AS-BUILTS SHALL BE PROVIDED TO THE WAUKEE ENGINEERING DEPARTMENT INCLUDING ALL UTILITIES AND AS-BUILT GRADES FOR SEALED. SIDEWALKS AND PCC PAVEMENT. THE PCC RAMP JOINT LOCATED AT THE BACK OF CURB AND ALL EXPANSION JOINTS SHALL BE X. PLACE 3/4" EXPANSION JOINT BETWEEN ALL PCC PAVEMENT/SIDEWALKS AND BUILDINGS. PLACE 1/2" EXPANSION JOINT BETWEEN W. ALL CONSTRUCTION TO EXISTING SANITARY MANHOLES SHALL BE CORE DRILL WITH A LINK SEAL. ALL SANITARY SEWER MANHOLES SHALL BE VACUUM TESTED. WITNESS ALL CLEANING AND TELEVISING. COPIES OF THE REPORT AND VIDEO SHALL BE PROVIDED TO THE CITY OF WAUKEE. V. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND TELEVISED PRIOR TO PAVING. THE CITY OF WAUKEE SHALL IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES. U. THE CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES MADE DURING CONSTRUCTION THAT HAVE NOT BEEN GRANTED APPROVAL DEVELOPMENT SERVICES DEPARTMENT PRIOR TO CONSTRUCTION. T. ANY CHANGES PROPOSED TO THE DRAWINGS DURING CONSTRUCTION SHALL BE APPROVED IN WRITING BY THE CITY OF WAUKEE FACILITIES. S. ALL STAKING SHALL BE DONE UNDER THE DIRECTION OF A LICENSED ENGINEER FOR LAND SURVEYING INCLUDING PEDESTRIAN CONSTRUCTION ACTIVITIES BEGINNING. R. A PRE-CONSTRUCTION MEETING WITH THE CITY OF WAUKEE WILL BE REQUIRED A MINIMUM OF ONE WEEK PRIOR TO TO THE STORM SEWER IS AT LEAST TEN FEET. GASKET JOINTS SHALL BE INSTALLED ON EACH SIDE OF THE CROSSING UNTILL THE NORMAL DISTANCE FROM THE WATER MAIN SHALL BE CONSTRUCTED OF REINFORCED CONCRETE WITH A FLEXIBLE O-RING GASKET RATED AT 13 PSI OR GREATER. O-RING Q. IF STORM SEWER CROSSES ABOVE WATER MAIN OR CROSSES LESS THAN 18" BELOW A WATER MAIN THEN STORM SEWER UTILITY SERVICE PROVIDER, CITY OF WAUKEE, AND THE OWNER PRIOR TO CONSTRUCTION. P. CONTRACTOR TO COORDINATE NATURAL GAS, ELECTRICAL, TELEPHONE AND ANY OTHER FRANCHISE UTILITY SERVICES WITH PERMIT IS REQUIRED FOR THIS PROJECT. OF CONSTRUCTION. GRADING AND SOIL EROSION CONTROL CODE REQUIREMENTS SHALL BE MET BY CONTRACTOR. A COSESCO CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR MAINTAINING ANY EXISTING EROSION CONTROL MEASURES ON SITE AT THE TIME O. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING EROSION AND SEDIMENT CONTROL MEASURES AS NECESSARY. N. THE ADJUSTMENT OF ANY EXISTING UTILITY APPURTENANCES TO FINAL GRADE IS CONSIDERED INCIDENTAL TO THE SITE WORK. CAUSED BY CONSTRUCTION ACTIVITIES AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT. M. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS, AND SIDEWALKS UNLESS OTHERWISE NOTED. L. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF PAVING SLAB (GUTTER), TO FINISH GRADES. K. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO MINIMUM 6" DEPTH PROJECT TO AN APPROVED OFF-SITE WASTE SITE. J. CONTRACTOR TO LOAD AND TRANSPORT ALL MATERIALS CONSIDERED TO BE UNDESIRABLE TO BE INCORPORATED INTO THE ORDER TO MEET THE CITY OF WAUKEE STANDARDS. FOR APPROVAL OF ANY CHANGES AND THAT ANY CHANGES COMPLETED WITHOUT APPROVAL ARE SUBJECT TO REMOVAL IN BE RESPONSIBLE FOR LAYOUT VERIFICATION OF ALL SITE IMPROVEMENTS PRIOR TO CONSTRUCTION. CONTACT CITY OF WAUKEE CONDITIONS ARE TO BE REPORTED TO THE ARCHITECT/ENGINEER PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL DESIGN. DEVIATIONS MAY BE NECESSARY IN THE FIELD. ANY SUCH CHANGES OR CONFLICTS BETWEEN THIS PLAN AND FIELD I. DIMENSIONS, BUILDING LOCATION, UTILITIES AND GRADING OF THIS SITE ARE BASED ON AVAILABLE INFORMATION AT THE TIME OF THE AS-BUILT DOCUMENTS. H. ALL FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE RECONNECTED OR REPAIRED AND NOTED ACCORDINGLY ON GOVERN. G. IN THE EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED PLANS SHALL MAXIMUM DENSITY. F. CONSTRUCT MANHOLES AND APPURTENANCES AS WORK PROGRESSES. BACKFILL WITH SUITABLE MATERIAL AND COMPACT TO 95% THE CITY OF WAUKEE AT LEAST 48 HOURS PRIOR TO ANY PLANNED WEEKEND OR HOLIDAY WORK. E. NOTIFY OWNER, ENGINEER, CITY OF WAUKEE AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. CONTRACTOR SHALL ALSO NOTIFY NOTIFY THE CITY OF WAUKEE AT LEAST ONE WEEK PRIOR TO ANY ANTICIPATED LANE CLOSURE. BE PROVIDED. FLAGGERS SHALL CONFORM TO THE MUTCD IN APPEARANCE, EQUIPMENT AND ACTIONS. THE CONTRACTOR SHALL TRAFFIC CONTROL DEVICES (MUTCD). WHEN CONSTRUCTION ACTIVITIES OBSTRUCT PORTIONS OF THE ROADWAY, FLAGGERS SHALL D. ALL TRAFFIC CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM C. LENGTH OF UTILITIES SHOWN ON PLANS ARE DIMENSIONED FROM CENTERLINE OF STRUCTURE TO CENTERLINE OF STRUCTURE. PUBLIC IMPROVEMENTS, STATEWIDE URBAN DESIGN AND SPECIFICATIONS AND THE SOILS REPORTS PREPARED BY OTHERS. B. CONSTRUCTION OF ALL STREET AND UTILITY IMPROVEMENTS SHALL CONFORM TO THE WAUKEE STANDARD SPECIFICATIONS FOR AT THE CONTRACTOR'S EXPENSE. TO UTILITY ITEMS NOT SHOWN FOR REMOVAL OR MODIFICATION SHALL BE REPAIRED TO THE UTILITY OWNER'S SPECIFICATIONS OF ALL UTILITIES. PROTECT ALL UTILITY LINES AND STRUCTURES NOT SHOWN FOR REMOVAL OR MODIFICATION. ANY DAMAGES NECESSARY DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT LOCATION, AND DEPTH A. NOTIFY UTILITY PROVIDERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES AND COORDINATE WITH UTILITY PROVIDERS AS BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.0886\Cadd\SP02_1150886_NTS.dgn1/28/20164:13:51 PMSnyder1:0.999998pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.0886 115.088610 10EDCEDCJWM11-18-15COVE AT KETTLESTONE APARTMENTS1REVISED AS PER CITY COMMENTS12/23/15JWM2REVISED AS PER CITY COMMENTS01/28/16JWM 8"W 8"S 15"ST15"ST 15"ST 15"ST15"ST8"S24"ST24"ST1 8 "S T 8"WSE WACO PLACE / 98TH STREET24"ST8"S8"W8"WBuried24?" CMP SE F.L.=277.97Broken15" CMP NW F.L.=278.40 12" CMP S F.L.=277.37 12" CMP S F.L.=278.08 CP2 CP3 CP11 F.L.=265.85 6" VCP SW /NE Intake=266.95 WEST PARK PLAT 1 PARCEL A LOT 3 GERLICH, KAREN A ETAL 50% KAREN A & MARGARET L TRUST 50% 3069 WACO PL, WAUKEE HAKEMAN, DALLAS D & LINDA M JTRS 3101 WACO PL, WAUKEE GILES, RICHARD W & CAROLYN A GILES TRUSTEES GILES, RICHARD W REVOCABLE TRUST CURVE 4 CU RV E 693.82'90.00' 94.55'408.54'LOT6 9.20 AC. 400,855 SF 162.43'M&R 867.31'M&R 2,785.88' M&R 737.26' M&RCURVE C-5M&R 9 14 2226161422 99 98 9 8 1314 12 8 18 GARAGE 13 GARAGECLUBHOUSEOFFICE M AINT 10887 16161610 13999 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS H36" ST30" ST 36" ST15" ST24" ST 24" ST 24" ST24" ST15" ST 12" ST12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 15" ST 15" ST 12" ST 18" ST 18" ST 18" ST 18" ST 18" ST24" ST15" ST18" ST18" ST 18" ST 12" ST 48" ST48" ST48" ST18" ST 8"S8"S 8"S8" S8" W8" W8"W8"W8"W 8"W 8"WH15" ST 12 " ST SE WACO PLACE / 98TH STREETFFE=1056.00 FFE=1056.50 FFE=1056.00 FFE=1055.50 FFE=1053.60 FFE=1053.10 FFE=1053.4 FFE=1053.4FFE=1054.20FFE=1054.00 FFE=1053.60 6"S6"S6"S6"S 6"W6"W6"W1"W SE BISHOP DRIVE POOL 24" ST 12" ST BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.0886\Cadd\SP03_1150886_DIM.dgn1/28/20164:13:54 PMSnyder1:40pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.0886 115.088610 10EDCEDCJWM11-18-15COVE AT KETTLESTONE APARTMENTS1REVISED AS PER CITY COMMENTS12/23/15JWM2REVISED AS PER CITY COMMENTS01/28/16JWM0 SCALE (FEET) 40 DIMENSION PLAN3 340'1"R 2"R 3"4.5" 7.5" NOT TO SCALE 6" STANDARD CURB 3 1 DIMENSION PLAN CONSTRUCTION NOTES 109.0' 12.0' 25.5'108.0'15.8'28.0' 126.5'8.0'82.0'37.0'82.0'8.0'82.0' 100.0'35.5'118.0'37.0'73.0'35.0'64.0' 73.0'34.0'73.0'37.0'73.0'33.0'46.0'20.0' 9.0'9.5' 9.0'9.5' 9.0'9.5' 24.0' 82.0'37.0'82.0'8.0'64.0'91.0'8.0' 24.0' 5.0'R5.0'R 5.0'R5.0'R 5.0'R 5.0'R 5.0'R5.0'R 5.0'R 15.0'R15.0' R 5.0'R 5. 0'R5.0'R4.0'R5.0'R5.0'R5.0'R 5.0'R4.0'R5.0'R 1 5 .0 'R5.0'R 5.0'R 5.0'R 5.0'R5.0'R 4.0'R 5.0'R 5.0'R15.0'R5.0'R 5.0'R 15.0'R 5.0'R15.0'R 3.0'R3.0'R 15 .0 ' R 15.0'R3.0'R5.0'R 15.0'R15.0'R5.0'R 5.0'R5.0'R 5.0'R5.0'R 5.0'R3.0'R4.0'R 5.0'R5.0'R 5.0'R5.0'R5.0'R5.0'R5.0'R 5.0'R 5.0'R5.0'R 4.0'R5.0'R5.0'R 5.0' R 5.0'R 5.0'R5.0'R 5.0'R15.0'R5.0'R15.0'R15.0'R39.0'R24.0' 5.0'R 6.0' 212.0'R 188.0'R 15.0'R15.0'R 109.0'31.5' 2A 2A2A 2A 2A 2A 2B2B2B 2B 2B 2B 2B2B 2B 2B 2B 2B 2B 2B 2B2B 2C 2C 2C 2C 2C 2C 2C 2C 2C 2C 2C 2D 2D 2B 2B2B2B2B 2B 2B2B2B 2E2E 2E 2E 2E 2E 2E 2E 2E 2E 2E 2E 2E 2E 2E 2C 2C 2E2E 2E 2E 2E 4B 14.0' 14.0' 2A 2A 2A 2F 2F 2F2F2F2F2F2F 2G 2H 2I 2I 2F 2C 2C 2J 2J 2J2J 2J 2J 2J 2J 2J 2J 2F 2J 2J 2J 2E 2E 55 2H 2E 2E 2I 2I 2E 2E 2E2E 2I 2I 2I2I 6 6 2K 2K 2J NOT TO SCALE3 3 MODULAR BLOCK WALL DETAIL 1 1 max. 4'-0'' Cap Stone Proper Block Setback Pins or Lip to Ensure Finished Grade (slope varies) Excavation Line Granular Backfill Material Subdrain wide (min.) leveling pad. Construct a 6" thick X 18" Foundation Compacted Excavation Line (typ.) Wall Unit specified by the wall manufacturer. materials and dimensions will be limits, reinforcement, and leveling pad Exact dimensions, wall batter, backfill 6" min. 6" min. 8" min. Geogrid Geogrid structural engineer. certified by manufacturers manufacturer. Shop drawings shall be be provided by the wall system Any necessary structural design shall segmental block retaining wall. For walls higher than 4 feet, use (TW) (FG) (If Applicable) Property Line Backfill Material Topsoil or Suitable fabric. with engineering backfill material Wrap porous Grade Finished NO SCALE PCC INTEGRAL CURB 4"6" 12"18" 6" VARIES 3 2 3A TYP3ATYP 3A TYP3ATYP 3B3B 3C3C TYPTYP 3C 3C3B3B TYPTYP 3B3B 3C3C TYPTYP 3C 3B TYP 3A TYP 3A TYP 3A TYP 3A TYP 2I 2H5.0'10.0' 10.0' 2J 2L 3.0'R 3 .0 'R3.0'R3.0'R20.0'15.5'15.5'10.0'10.0'20.0'8.5'8.5' 8.5'8.5' 7 7 8 8 820.0'5.0' 183.0' R 5.0'5.7'5.0' 5.0' 6.0' 3.0'R 3.0'R29.5' 29.5'20.0' R15.0'R20.0'R 2C 2C 2J 2J 2E 2E 4B 4B 4B 4B 4B 4B 4B 4B 4B 5.0'6.0'5.7'24.2'4A4A4A4A 4A4A4A4A 4B 4B 4B 4B 4A 4A 4B 6.0'6.0'9.5'82.0'4.0'R4.0'R 18.0'6.0' 6.6' 5.0'6.0'6.0'4A4A 4A 4A163.3'23.0'19.0'12.0'4B 4B 4B 4B 2B 25.5'82.0'8.0'82.0'37.0'82.0'8.0'82.0'29.0'135.5'130.5' 5.0'6.0'3.5'24.0'40.0'24.0'24.5'24.5'18.0'24.0'3.5'18.0'5.0'5.0' 5.0' 2C 2I 2I 2M 2M 2M 2M TYPTYP TYPTYP 2M 2M TYP TYP 2M 2M 2M TYPTYPTYP 2M TYP TYP TYP 2M 2M 8. KNOX BOX. SEE ARCHITECTURAL PLANS FOR DETAIL. 7. TRASH ENCLOSURE. SEE ARCHITECTURAL PLANS FOR DETAIL. 6. STEM WALL ON GARAGE. SEE ARCHITECTURAL PLANS FOR DETAIL. 5. RETAINING WALL. CODE OF WAUKEE. B. FIRELANE SIGNAGE AND MARKINGS AS PER SECTION 511.4 OF CHAPTER 222 OF THE MUNICIPAL THE BUILDING ALSO ADD SIGN READING "VAN ACCESSIBLE". ENAMEL FINISH IN A 12" DIAMETER CONCRETE FOOTING. FOR THE TWO STALLS CLOSEST TO USE" AS PER ADAAG STANDARDS. SECURE SIGN TO 2" SQUARE STEEL CHANNEL POST WITH A. BLUE SIGN WITH DISABLED SYMBOL READING "PARKING ONLY" AND "$200 FINE FOR IMPROPER 4. SIGNAGE, PROVIDE THE FOLLOWING: C. PAINTED STATE OF IOWA APPROVED DISABLED SYMBOL. B. 45° STRIPING AT 3' ON CENTER SPACING WHERE SHOWN. A. PAINTED PARKING STALL LINE, 4" WIDE, PAINTED YELLOW. 3. PAVEMENT MARKINGS, PROVIDE THE FOLLOWING: DENSITY. M. 4" PCC PATIO ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR PROCTOR DENSITY. L. 8" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD MATCH EXISTING ELEVATIONS. K. CONNECT TO EXISTING PCC PAVEMENT. SUDAS TYPE "A" CONNECTION WITH EXPANSION JOINT. WHERE SHOWN. J. PEDESTRIAN RAMP WITH MAXIMUM SLOPE OF 8.33%. PROVIDE DETECTABLE WARNING PANELS I. TAPER FROM FULL 6" CURB. H. 5' CURB OPENING. G. NO CURB. F. 6" PCC INTEGRAL CURB AND SIDEWALK. E. 6" PCC STANDARD CURB. DENSITY. D. 6" PCC TRAIL ON 6" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR STANDARD PROCTOR DENSITY. C. 4" MINIMUM DEPTH PCC SIDEWALK ON 6" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY. B. 6" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY. A. 7" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% 2. PAVEMENTS, PROVIDE THE FOLLOWING: B. EXISTING PAVEMENT. ELEVATION AND MINIMUM COVER REQUIREMENTS PRIOR TO CONSTRUCTION. A. EXISTING UTILITY. ADJUST AS NECESSARY TO ALLOW FOR CONSTRUCTION. VERIFY LOCATION, 1. PROTECT THE FOLLOWING SITE FEATURES:23.2'40.7' 10.1'6.0'18.0'24.0'40.0'24.0'18.0'20.0'18.0'24.0'40.0'24.0'18.0'6.0'5.7'5.7'5.7'34.6' 26.4' 19.1' 18.0'29.3'15' Building Setback LineStorm Sewer Easem ent 10' Public Utiltiy Easement20' Building Setback Line 10' Public Utiltiy Easem ent 15' Building Setback Line 15' Rear Yard Setback Line 16" W16" W16" W16" W16" W16" W16" W16" W8"W 8"S 15"ST15"ST 15"ST 15"ST15"ST8"S24"ST24"ST1 8 "S T 8"WSE WACO PLACE / 98TH STREET24"ST8"S150' HYDRANT COVERAGE8"W8"WBuried24?" CMP SE F.L.=277.97Broken15" CMP NW F.L.=278.40 12" CMP S F.L.=277.37 12" CMP S F.L.=278.08 CP2 CP3 CP11 F.L.=265.85 6" VCP SW /NE Intake=266.95 WEST PARK PLAT 1 PARCEL A LOT 3 GERLICH, KAREN A ETAL 50% KAREN A & MARGARET L TRUST 50% 3069 WACO PL, WAUKEE HAKEMAN, DALLAS D & LINDA M JTRS 3101 WACO PL, WAUKEE GILES, RICHARD W & CAROLYN A GILES TRUSTEES GILES, RICHARD W REVOCABLE TRUST LOT6 9.20 AC. 400,855 SF 9 14 2226161422 99 98 9 8 1314 12 8 18 GARAGE 13 GARAGECLUBHOUSEOFFICE M AINT 10887 16161610 13999 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS H36" ST30" ST 36" ST15" ST24" ST 24" ST 24" ST24" ST15" ST 12" ST12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 15" ST 15" ST 12" ST 18" ST 18" ST 18" ST 18" ST 18" ST24" ST15" ST18" ST18" ST 18" ST 12" ST 48" ST48" ST48" ST 18" ST 8" W8" W8"W8"W8"W 8"W 8"W 1 5 0' HYDRANT COVERAGE1 5 0' HYDRANT COVERAGE1 5 0' HYDRANT COVE RAGE1 5 0' HYDRANT COVERAGE1 5 0' HYDRANT COVERAGE1 5 0' HYDRANT COVERAGE1 5 0' HYDRANT COVERAGEH15" ST 12 " ST SE WACO PLACE / 98TH STREETFFE=1056.00 FFE=1056.50 FFE=1056.00 FFE=1055.50 FFE=1053.60 FFE=1053.10 FFE=1053.4 FFE=1053.4FFE=1054.20FFE=1054.00 FFE=1053.60 6"W6"W6"W1"W SE BISHOP DRIVE POOL 24" ST 12" ST BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.0886\Cadd\SP04_1150886_SAN.dgn1/28/20164:13:58 PMSnyder1:40pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.0886 115.088610 10EDCEDCJWM11-18-15COVE AT KETTLESTONE APARTMENTS1REVISED AS PER CITY COMMENTS12/23/15JWM2REVISED AS PER CITY COMMENTS01/28/16JWM0 SCALE (FEET) 40 4 440'WATER MAIN AND SANITARY SEWER PLANUTILITY PLAN CONSTRUCTION NOTES GENERAL CONSTRUCTION NOTES TESTED AND DECHLORINATED. E. ALL WATERMAIN SHALL BE PRESSURE AND BACTERIA D. ALL SANITARY MANHOLES TO BE VACUUM TESTED. MANHOLES SHALL BE VACUUM TESTED. SHALL BE PROVIDED TO THE CITY OF WAUKEE. ALL SANITARY SEWER ALL CLEANING AND TELEVISING. COPIES OF THE REPORT AND VIDEO TELEVISED PRIOR TO PAVING. THE CITY OF WAUKEE SHALL WITNESS C. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND DEPARTMENT. TIE-INS SHALL BE WITNESSED BY THE CITY OF WAUKEE ENGINEERING SPECIFICATION FOR PUBLIC IMPROVEMENTS AND ANY TESTING OR B. ALL UTILITIES SHALL BE TESTED TO THE CITY OF WAUKEE STANDARD CONNECTING TO ANY PUBLIC UTILITY. A. NOTIFY THE CITY OF WAUKEE AT LEAST 48 HRS PRIOR TO 222 LF OF 8" SANITARY SEWER @0.50% 2A 2B 2B 2B 2B 3A 3B 3J3B 3D 3D 3B3B3D 3D 3E 3F 3B 3B 3D 3D 3B 3F 3D 3F 6 6 EX. INV = 1043.18 203 LF OF 8" SANITARY SEWER @ 0.50%208 LF OF 8" SANITARY SEWER @ 0.50%INV=1044.20(OUT NE) INV=1044.30(IN SE) INV=1044.30(IN SW) RIM=1051.91 MANHOLE NO. 1 INV=1045.41(OUT NW) RIM=1051.62 MANHOLE NO. 2 INV=1045.34(OUT NE) INV=1045.44(IN SE) RIM=1055.05 MANHOLE NO. 3 INV=1047.44(OUT NW) RIM=1054.20 MANHOLE NO. 4 6 6 6 400 LF OF 8" SANITARY SEWER @ 0.50% 3C 3G2D 2C 6"S6"S6"S6 66 2D 3G 3C 66 3C 3G 2D 2C 76 6 6"S 2C 2D 3G 3H 6 6"S INV=1046.60 8"S INV=1045.38 NOT TO SCALE4 1 OD OD+ 6" 3" OD/4 SECTION A-A A 3"12"OD12" A New sewer material 1 •" compressible Existing utiltiy free of concrete. Keep the 12" utility clear zone Form interior surface of footings. water, gas, etc.) Existing utiltiy (sewer, New sewer Undisturbed soil PCC material 1 •" compressible with Figure 3010.101 Bedding: Comply 12" or less PIPE SUPPORT OVER EXISTING UTILITY TOP SANITARY=1044.84 BOTTOM WATER=1047.00 6 BP=1049.50(W) TP=1047.06(SAN) 3I TP=1048.92(SAN) BP=1051.00(ST) 3I TP=1047.01(SAN) BP=1050.93(ST) 6"S INV=1048.00 8"S INV=1047.37 2C 6 3I 6 BP=1046.50(WAT) TP=1043.84(SAN) TP=1044.57(WAT) BP=1043.07(SAN) TP=1044.06(WAT) BP=1045.56(SAN) TP=1049.44(WAT) BP=1050.94(ST) TP=1046.66(WAT) BP=1048.16(SAN) TP=1049.50(WAT) BP=1051.00(ST) TP=1047.52(SAN) BP=1047.81(ST) TP=1043.12(WAT) BP=1044.62(ST) TP=1045.27(WAT) BP=1046.77(ST) TP=1046.34(SAN) BP=1048.83(WAT) TP=1045.69(WAT) BP=1047.19(ST) TP=1046.38(WAT) BP=1047.88(ST) TP=1042.61(WAT) BP=1044.11(SAN) TP=1043.64(WAT) BP=1045.14(ST) 6 TP=1045.05(SAN) BP=1046.70(ST) 6 TP=1044.22(SAN) BP=1047.12(ST) 6"S INV=1045.92 8"S INV=1045.29 3K3K 3K 8. LIGHT POLE LOCATIONS VERIFY AND SEE ELECTRICAL DRAWINGS FOR DETAILED CONSTRUCTION INFORMATION. 7. CRITICAL CROSSING, CONTRACTOR TO PROVIDE STRUCTURAL SUPPORT AS SHOWN IN SUDAS FIGURE 3010.901 6. CRITICAL CROSSING. CONTRACTOR TO VERIFY ALL CROSSINGS AND PROVIDE 18" MINIMUM SEPARATION. SHEET 5. 5. PROVIDE STORM SEWER IMPROVEMENTS AS SHOWN ON THE PLANS AS PER CITY OF WAUKEE STANDARDS. SEE DESIGN INFORMATION AND COORDINATE UTILITY CONNECTIONS ACCORDINGLY. PRIOR TO CONSTRUCTION. SEE ARCHITECTURAL AND MECHANICAL PLANS FOR INTERIOR UTILITY ROUTING,METERS, 4. COORDINATE NATURAL GAS AND ELECTRICAL SERVICES AND METER LOCATION WITH UTILITY SERVICE PROVIDER K. FIRE DEPARTMENT CONNECTION. SEE MECHANICAL AND ARCHITECTURAL PLANS FOR DETAILS. J. 16"X8" TAPPING SLEEVE AND VALVE. I. 8"x6" TEE H. 1" WATER SERVICE WITH CURB STOP. MAINTAIN 18" VERTICAL CLEARANCE FROM OTHER UTILITIES. MECHANICAL PLANS PRIOR TO CONSTRUCTION. SERVICE SHALL BE CLASS 52 DUCTILE IRON PIPE. CONNECT TO BUILDING WATER SERVICE. VERIFY LOCATION WITH G. INSTALL WATER SERVICE AS PER CITY OF WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS. F. 8" TEE. E. 8" VALVE. D. HYDRANT ASSEMBLY WITH STORZ FITTINGS. C. 6" WATER SERVICE WITH VALVE. MAINTAIN 18" VERTICAL CLEARANCE FROM OTHER UTILITIES. FROM OTHER UTILITIES B. 8" WATER LINE WITH FITTINGS AND BENDS AS NECESSARY. MINIMUM 5.5' DEEP. MAINTAIN 18" VERTICAL CLEARANCE A. CONNECTION TO EXISTING 8" WATER MAIN. 3. PRIVATE WATER SERVICE. PROVIDE THE FOLLOWING AS PER CITY OF WAUKEE STANDARDS. CONSTRUCTION. D. CONNECT TO BUILDING SANITARY SERVICE. VERIFY LOCATION AND ELEVATION WITH MECHANICAL PLANS PRIOR TO C. 6" PVC SDR23.5 SANITARY SEWER STUB AT MINIMUM 1.00%. B. PRIVATE 8" SANITARY SEWER PER CITY OF WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS. CONSTRUCTION. A. REMOVE CLEANOUT AND CONNECT TO EXISTING SANITARY SEWER STUB. CONTRACTOR TO VERIFY PRIOR TO 2. PRIVATE SANITARY SEWER SERVICE. UTILITY OWNER'S SPECIFICATIONS. DEMOLITION SHALL BE REMEDIED AT THE CONTRACTOR'S EXPENSE WITH THE WORK BEING PERFORMED TO THE A. EXISTING UTILITIES. ANY DAMAGES TO EXISTING UTILITIES THAT ARE NOT SCHEDULED FOR MODIFICATION OR 1. EXISTING FEATURES, PROTECT THE FOLLOWING: 8 8888 8 8 888 8 8 8 8 10412681042 10421042 1043 1043 1043 10431043 1044 1044 1044 10441044 1045 1045 1045 1045 1046 1046 1046 1046 10461046 104610461046 1047 1047 1047 1047 104710471048 1048 1048 1048 10481048 1049 1049 1049 10491049 104910491049 1050 1050 1050 1050 1050 10501051 1051 1051 1051 1051 1052 1052 1052 1052 10 5 2 10521052 1053 1053 1053 10 5 3 1053105310531053 1053 1053 105410541054 10 5 4 1054 1054 1054 10 5 4 1054 105410541054 1054 10541055 1055 1055 1055 1055 105510551055 10551056 1056 1056105610 5 6 1056 1056 1057 1057 105710571057 1057 1057 1057 1058 1058 1058105810581058 1058 1059 1059 105910591059 1059 1059 1059 1059 1059 1059 1059 1059 10601060 10601060 1 0 6 0 1060 1060 1060 1 0 6 0 1061 1061 1061 1061 1062 1062 1062 1063 1063 16" W16" W16" W16" W16" W16" W16" W16" W8"W 8"S 15"ST15"ST 15"ST 15"ST15"ST8"S24"ST24"ST1 8 "S T 8"WSE WACO PLACE / 98TH STREET24"ST8"S8"W8"WBuried24?" CMP SE F.L.=277.97Broken15" CMP NW F.L.=278.40 12" CMP S F.L.=277.37 12" CMP S F.L.=278.08 CP2 CP3 CP11 F.L.=265.85 6" VCP SW /NE Intake=266.95 1041 1042 1043 1043 10 4 4 104410451045 1045 1046 1046 10461047 1047 10 4 71047 1047 1047 10 4 7 10 4 7 104810 4 8 1048 10481048 1049 1049 1049 1049 10491050 1050 10501050 1051 1051 1051 1051 105 11051105210521052 1052 10 5 210521052 1052 10521052105210521052 1052 10521052105310531053 1053 1053105310531053 1053 1053 1053 1053 1053 10531053 1053 1053 10 5 3 1053 10 5 3 1053 105310541054 1054 1054 10541054 105410541054 1054 10541054 1054 10541054 1054 1054 1054 105410541054 1054 10 5 4 1054 1054 1054 10541054 1054 1054 1054 105410 5 4 10541055 105510551055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 10551055 1055 10551055 1055 10551055 1055 1055 1055 1055 1055 10551055 1055 1055 1055 10 5 5 1056 1056 1056 1056 1056 1056 10561056 1056 1056 1056 10561056 10561056 1056 10561056 1057 105710571057 1057 1057 10571057 1057 10571058 1058 1058 1058 1059 1059 10591059 1060 1060 106110621062 1063 WEST PARK PLAT 1 PARCEL A LOT 3 GERLICH, KAREN A ETAL 50% KAREN A & MARGARET L TRUST 50% 3069 WACO PL, WAUKEE HAKEMAN, DALLAS D & LINDA M JTRS 3101 WACO PL, WAUKEE GILES, RICHARD W & CAROLYN A GILES TRUSTEES GILES, RICHARD W REVOCABLE TRUST LOT6 9.20 AC. 400,855 SF 9 14 2226161422 99 98 9 8 1314 12 8 18 GARAGE 13 GARAGECLUBHOUSEOFFICE M AINT 10887 16161610 13999 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS H8"S8"S 8"S8" S8" W8" W8"W8"W8"W 8"W 8"WH SE WACO PLACE / 98TH STREETFFE=1056.00 FFE=1056.50 FFE=1056.00 FFE=1055.50 FFE=1053.60 FFE=1053.10 FFE=1053.4 FFE=1053.4FFE=1054.20FFE=1054.00 FFE=1053.60 6"S6"S6"S6"S 6"W6"W6"W1"W SE BISHOP DRIVE POOL BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.0886\Cadd\SP05_1150886_STM.dgn1/28/20164:14:01 PMSnyder1:40pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.0886 115.088610 10EDCEDCJWM11-18-15COVE AT KETTLESTONE APARTMENTS1REVISED AS PER CITY COMMENTS12/23/15JWM2REVISED AS PER CITY COMMENTS01/28/16JWM0 SCALE (FEET) 40 5 540'STORM SEWER PLANUTILITY PLAN CONSTRUCTION NOTES 15"PVC @0.50%50 LF OF 18" PVC @0.30%82 LF OF 18"RCP @ 0.50% 36 LF OF 92 LF OF 24"RCP @0.30% 18"PVC @0.40%64 LF OF80 LF OF 12" PVC @0.30%89 LF OF 24"RCP @0.50%208 LF OF 30"RCP @0.32%109 LF OF 36"RCP @0.30%142 LF OF 15"RCP @1.0%67 LF OF 24"RCP @0.30%24"RCP @0.30%52 LF OF149 LF OF 15"RCP @1.0% 117 LF OF 36"RCP @0.30%48"RCP @ 0.40%58 LF OF 48"RCP @ 0.40%58 LF OF 48" R CP @ 0.40 %70 LF OF 24"RCP @0.30%72 LF OF12"RCP @ 0.50%73 LF OF310 LF OF 12"PVC @0.50% @ 0.50%12"PVC 38 LF OF 368 LF OF 12"PVC @0.50%24"PVC @ 0.50%59 LF OF24"PVC @0.50% 61 LF OF 90 LF OF 24"PVC @ 0.50%90 LF OF 18"PVC @ 0.60%90 LF OF 18"PVC @ 0.50%84 LF OF 18"PVC @0.50%82 LF OF 15"PVC @0.60%15"PVC @0.50% 60 LF OF 15"PVC @0.50% 60 LF OF 15"PVC @0.50% 60 LF OF 12"PVC @0.50% 60 LF OF 12"PVC @0.50% 60 LF OF INV=1051.73(OUT SE) RIM=1054.50 BASIN W/ DOME GRATE ST-1 INTAKE, 15" NYLOPLAST INV=1051.33OUT SE) INV=1051.43(IN NW) RIM=1054.50 BASIN W/ DOME GRATE ST-2 INTAKE, 15" NYLOPLAST INV=1050.93(OUT SE) INV=1051.03(IN NW) RIM=1054.50 BASIN W/ DOME GRATE ST-3 INTAKE, 15" NYLOPLAST INV=1050.53(OUT SE) INV=1050.63(IN NW) RIM=1054.50 BASIN W/ DOME GRATE ST-4 INTAKE, 15" NYLOPLAST INV=1050.13(OUT SE) INV=1050.23(IN NW) RIM=1054.50 BASIN W/ DOME GRATE ST-5 INTAKE, 15" NYLOPLAST INV=1049.73(OUT SE) INV=1049.83(IN NW) RIM=1054.50 BASIN W/ DOME GRATE ST-6 INTAKE, 15" NYLOPLAST INV=1049.14(OUT SE) INV=1049.24(IN NW) RIM=1053.90 BASIN W/ DOME GRATE ST-7 INTAKE, 18" NYLOPLAST INV=1048.62(OUT SE) INV=1048.72(IN NW) RIM=1053.50 BASIN W/ DOME GRATE ST-8 INTAKE, 18" NYLOPLAST INV=1048.07(OUT SE) INV=1048.17(IN NW) RIM=1053.50 BASIN W/ DOME GRATE ST-9 INTAKE, 18" NYLOPLAST INV=1047.43(OUT SE) INV=1047.53(IN NW) RIM=1053.50 BASIN W/ DOME GRATE ST-10 INTAKE, 24" NYLOPLAST INV=1046.88(OUT W) INV=1046.98(IN NW) RIM=1053.50 BASIN W/ DOME GRATE ST-11 INTAKE, 24" NYLOPLAST INV=1046.47(OUT NE) INV=1046.57(IN SW) RIM=1053.40 BASIN W/ DOME GRATE ST-12 INTAKE, 30" NYLOPLAST INV=1051.84(OUT SE) RIM=1055.65 BASIN W/ SOLID LID ST-13 MANHOLE, 24" NYLOPLAST INV=1048.53(OUT NE) INV=1050.45(IN SE) INV=1050.81(IN NW) RIM=1055.50 ST-25B MANHOLE, TYP SW-401 INV=1052.00 RIM=1056.14 BASIN W/ SOLID LID ST-25 MANHOLE, 24" NYLOPLAST INV=1048.06(OUT NE) INV=1048.16(IN SE) INV=1048.16(IN SW) T/C=1054.00 ST-27 INTAKE, TYP SW-503 INV=1048.52(OUT NW) RIM=1052.95 ST-26 INTAKE, TYP SW-511 NECESSARY TO FLOW LINES. INCHES BELOW FINISHED GRADE. CONCRETE FILLET INSIDE INTAKES AS 5. ALL FOOTINGS FOR STORM SEWER STRUCTURES SHALL BE A MINIMUM 42 SECTION. STRUCTURE TO CENTER OF STRUCTURE AND INCLUDE FLARED END 4. ALL STORM SEWER PIPE LENGTHS ARE MEASURED FROM CENTER OF PROVIDE 18" MINIMUM SEPARATION. 3. CRITICAL CROSSING. CONTRACTOR TO VERIFY ALL CROSSINGS AND WAUKEE STANDARDS. 2. PROVIDE STORM SEWER IMPROVEMENTS AS SHOWN AS PER CITY OF TO THE UTILITY OWNER'S SPECIFICATIONS. AT THE CONTRACTOR'S EXPENSE WITH THE WORK BEING PERFORMED NOT SCHEDULED FOR MODIFICATION OR DEMOLITION SHALL BE REMEDIED A. EXISTING UTILITIES. ANY DAMAGES TO EXISTING UTILITIES THAT ARE 1. EXISTING FEATURES, PROTECT THE FOLLOWING: INV=1047.74(OUT NE) INV=1047.84(IN SW) T/C=1053.90 ST-28 INTAKE, TYP SW-503 INV=1048.17(OUT NE) INV=1048.27(IN SW) RIM=1051.70 BASIN W/ DOME GRATE ST-33 INTAKE, 18" NYLOPLAST INV=1048.52(OUT NE) INV=1048.62(IN SW) RIM=1051.70 BASIN W/ DOME GRATE ST-32 INTAKE, 18" NYLOPLAST INV=1047.89(OUT SE) INV=1047.99(IN SW) RIM=1053.00 BASIN W/ SOLID LID ST-33A MANHOLE, 24" NYLOPLAST INV=1047.18(OUT W) INV=1047.28(IN NE) T/C=1052.30 ST-35 INTAKE, TYP SW-501 INV=1048.75(OUT SE) RIM=1051.70 ST-24A MANHOLE, TYP SW-401 INV=1045.23(OUT SE) INV=1045.33(IN SW) INV=1046.36(IN NW) T/C=1051.80 ST-21 INTAKE, TYP SW-506 INV=1044.51(OUT SE) INV=1044.56(IN NW) T/C=1051.20 ST-22 INTAKE, TYP SW-506 370 LF OF 12"PVC @0.50% FL=1043.00 8'X12' FTM & 16'X17' TRM FOOTING AND ST-24C, 48" F.E.S. W/ INV=1043.28(OUT NW) INV=1043.42(IN SW) RIM=1051.00 ST-24B MANHOLE, TYP SW-401 INV=1046.75(OUT NE) T/C=1053.50 ST-19 INTAKE, TYP SW-505 RCP @ 0.50%71 LF OF 15" 18"PVC @0.30%60 LF OF 24 "RCP @1 .0% 68 LF OF INV=1046.80(OUT SE) INV=1046.90(IN SW) RIM=1051.40 WITH TYPE "Q" CASTING ST-20 INTAKE, TYP SW-502 INV=1047.18(OUT NE) INV=1047.28(IN NW) RIM=1052.55 ST-29 INTAKE, TYP SW-502 WITH TYPE "Q" CASTING INV=1047.48(OUT SE) INV=1047.58(IN SW) RIM=1053.20 ST-28A MANHOLE, TYP SW-401 INV=1047.54(OUT SE) INV=1047.64(IN NW) RIM=1051.70 BASIN W/ DOME GRATE ST-34 INTAKE, 18" NYLOPLAST INV=1043.65(OUT NE) INV=1043.75(IN SW) INV=1046.90(IN NW) RIM=1052.40 TYP SW-401 ST-24A MANHOLE, INV=1043.98(OUT NE) INV=1044.18(IN NW) INV=1044.18(IN SW) T/C=1051.40 TYP SW-506 SPECIAL ST-23 INTAKE, FL=1047.00 4'X8' FTM & 11'X12' TRM FOOTING AND ST-35A, 18" F.E.S. W/ FL=1040.82 11" ORIFICE PLATE FOOTING AND APRON GUARD ST-, 24" F.E.S. WITH 24"RCP @ 0.50% 16 LF OF INV=1040.74 CONNECT TO EXISTING STORM SEWER REMOVE EXISTING FES AND FOOTING 136 LF OF 24"RCP @0.52 % INV=1045.27(OUT NW) INV=1045.37(IN SE) T/C=1052.35 ST-36 INTAKE,TYP SW-501 INV=1051.00 RIM=1055.70 BASIN W/ SOLID LID ST-25A MANHOLE, 24" NYLOPLAST INV=1046.07(OUT NW) INV=1046.17(IN SE) INV=1050.00(IN W) RIM=1053.40 SW-401 W/ TYPE 4B GRATE ST-14 MANHOLE TP=1048.92(SAN) BP=1051.00(ST) CRITICAL CROSSING TP=1049.50(WAT) BP=1051.00(ST) CRITICAL CROSSING TP=1046.44(SAN) BP=1050.93(ST) CRITICAL CROSSING TP=1047.73(WAT) BP=1048.23(ST) CRITICAL CROSSING TP=1043.12(WAT) BP=1044.62(ST) CRITICAL CROSSING TP=1047.52(SAN) BP=1047.81(ST) CRITICAL CROSSING TP=1046.38(WAT) BP=1047.88(ST) CRITICAL CROSSING TP=1045.05(SAN) BP=1046.70(ST) CRITICAL CROSSING TP=1045.27(WAT) BP=1046.77(ST) CRITICAL CROSSING TP=1045.69(WAT) BP=1047.19(ST) CRITICAL CROSSING TP=1044.22(SAN) BP=1047.12(ST) CRITICAL CROSSING TP=1049.44(WAT) BP=1050.94(ST) CRITICAL CROSSING TP=1043.64(WAT) BP=1045.14(ST) CRITICAL CROSSING 100 YEAR=1047.13 INV=1048.19(OUT SE) RIM=1052.60 W/ TYPE Q CASTING ST-17 INTAKE, TYP SW-505 INV=1044.53(OUT NE) INV=1046.70(IN W) INV=1044.59(IN SE) T/C=1052.40 ST-18 INTAKE, TYP SW-506 8"W 8"S 15"ST15"ST 15"ST 15"ST15"ST8"S24"ST24"ST1 8 "S T 8"WSE WACO PLACE / 98TH STREET24"ST8"S8"W8"W10412681042 10421042 1043 1043 1043 10431043 1044 1044 1044 10441044 1045 1045 1045 1045 1046 1046 1046 1046 10461046 104610461046 1047 1047 1047 1047 104710471048 1048 1048 1048 10481048 1049 1049 1049 10491049 104910491049 1050 1050 1050 1050 1050 10501051 1051 1051 1051 1051 1052 1052 1052 1052 10 5 2 10521052 1053 1053 1053 10 5 3 1053105310531053 1053 1053 105410541054 10 5 4 1054 1054 1054 10 5 4 1054 105410541054 1054 10541055 1055 1055 1055 1055 105510551055 10551056 1056 1056105610 5 6 1056 1056 1057 1057 105710571057 1057 1057 1057 1058 1058 1058105810581058 1058 1059 1059 105910591059 1059 1059 1059 1059 1059 1059 1059 1059 106010601060 10601060 1 0 6 0 1060 1060 1060 1 0 6 0 1061 1061 1061 1061 1062 1062 1062 1063 1063 Buried24?" CMP SE F.L.=277.97Broken15" CMP NW F.L.=278.40 12" CMP S F.L.=277.37 12" CMP S F.L.=278.08 CP2 CP3 CP11CP12 F.L.=265.85 6" VCP SW /NE Intake=266.95 WEST PARK PLAT 1 PARCEL A LOT 3 GERLICH, KAREN A ETAL 50% KAREN A & MARGARET L TRUST 50% 3069 WACO PL, WAUKEE HAKEMAN, DALLAS D & LINDA M JTRS 3101 WACO PL, WAUKEE GILES, RICHARD W & CAROLYN A GILES TRUSTEES GILES, RICHARD W REVOCABLE TRUST LOT6 9.20 AC. 400,855 SF 9 14 2226161422 99 98 9 8 1314 12 8 18 GARAGE 13 GARAGECLUBHOUSEOFFICE M AINT 10887 16161610 13999 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS H36" ST30" ST 36" ST15" ST24" ST 24" ST 24" ST24" ST15" ST 12" ST12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 15" ST 15" ST 12" ST 18" ST 18" ST 18" ST 18" ST 18" ST24" ST15" ST18" ST18" ST 18" ST 12" ST 48" ST48" ST48" ST 18" ST 8"S8"S 8"S8" S8" W8" W8"W8"W8"W 8"W 8"WH15" ST 12 " ST SE WACO PLACE / 98TH STREETFFE=1056.00 FFE=1056.50 FFE=1056.00 FFE=1055.50 FFE=1053.60 FFE=1053.10 FFE=1053.4 FFE=1053.4FFE=1054.20FFE=1054.00 FFE=1053.60 6"S6"S6"S6"S 6"W6"W6"W1"W SE BISHOP DRIVE POOL 24" ST 12" ST 1041 1042 1043 1043 10 4 4 104410451045 1045 1046 1046 10461046.93 1047.00 1047 1047 10 4 71047 1047 1047 10 4 7 10 4 7 1047.50 OVERFLOW 1048.00 104810 4 8 1048 104810481048.49 1048.56 1048.61 1048.76 1048.87 1048.89 1048.92 1049.00 1049.00 1049.00 1049.00 1049 1049 1049 1049 10491049.02 1049.10 1049.15 1049.15 1049.25 1049.30 1049.40 1049.60 1049.75 1049.75 1049.84 1049.90 1049.92 1049.99 1050.00 1050 1050 105010501050.10G 1050.59G 1050.70 LP 1050.70 1050.85 1050.85 1050.90 1050.90 LP 1050.92 1051.00 1051.00 1051.00 1051 1051 1051 1051 105 110511051.13 1051.18 1051.25 1051.30 LP 1051.30 1051.35 1051.39 1051.40 1051.40 1051.40 LP 1051.40 LP OVERFLOW 1051.45 1051.45 OVERFLOW HP 1051.45G 1051.95TC 1051.45G 1051.95TC1051.501051.55 1051.55 1051.55 1051.60 1051.65 1051.651051.651051.70 1051.70 1051.70G HP 1051.70 LP 1051.70 LP 1051.70 LP 1051.75 1051.75 1051.75 1051.75 HP 1051.80 LP 1051.82 1051.84 1051.85 LP 1051.88 1051.93 1051.95G 1052.45TC 1051.95G 1052.45TC 1051.95G 1052.45TC 1051.95G 1052.45TC 1051.95G 1052.45TC 1051.95G 1052.45TC 1051.95G 1052.45TC 1052.00 1052.00 OVERFLOW HP 1052.00 OVERFLOW HP 1052 1052 10521052 10 5 210521052 1052 10521052105210521052 1052 10521052 1052.051052.05 1052.05 LP 1052.08 1052.15G OVERFLOW HP 1052.20 1052.20 HP 1052.25 1052.25 1052.251052.25 1052.25 1052.25 1052.27 1052.30G OVERFLOW HP 1052.35 1052.35 1052.40 1052.40 1052.40G HP 1052.40 OVERFLOW HP 1052.40 1052.41 1052.45G 1052.95TC 1052.45G 1052.95TC 1052.45G 1052.95TC 1052.45G 1052.95TC 1052.50 1052.50G HP 1052.53G 1052.55 1052.551052.55 1052.55 1052.55 1052.55 1052.55 1052.55G 1053.05TC 1052.55G 1053.05TC 1052.55G 1053.05TC 1052.55G 1053.05TC 1052.55 LP 1052.551052.55 1052.60 1052.60 1052.60 1052.60 1052.60 LP 1052.60G 1052.65 1052.65 1052.65 1052.35 1052.70 1052.70G 1053.20TC 1052.70 1052.75 1052.75 1052.75 1052.75 1052.80 1052.80 1052.80G 1053.30TC 1052.80G 1053.30TC 1052.80 1052.81 1052.81 1052.83 1052.91 OVERFLOW HP 1052.92 1052.95 1052.95 LP 1052.951052.95 1053.00 1053.00 LP1053 10531053 1053 1053105310531053 1053 1053 1053 1053 1053 10531053 1053 1053 1053.00 10 5 3 1053 10 5 3 1053 10531053.05 1053.05 1053.05 1053.05 1053.05G 1053.05 1053.05 1053.05 1053.08 1053.10 1053.10 1053.10 1053.10 1053.10 1053.10 1053.10 1053.10 1053.10G 1053.60TC 1053.10 OVERFLOW HP 1053.10 1053.101053.10 1053.13 1053.151053.15 1053.15 1053.15 1053.15 1053.15 1053.15 1053.15 1053.15G 1053.65TC 1053.15 1053.18 1053.20 1053.20 1053.20G 1053.70TC 1053.20 1053.22 1053.25G 1053.75TC 1053.27 1053.30 1053.35 1053.35 OVERFLOW HP 1053.40 1053.40 1053.40 1053.40 1053.40 1053.40 1053.40 1053.40 1053.40 1053.40G 1053.90TC 1053.40 LP 1053.40 LP 1053.40 LP 1053.40 1053.41 1053.421053.45 1053.45 1053.47 1053.50 LP 1053.50 LP 1053.50 LP 1053.50 LP 1053.50 LP 1053.50 1053.51G HP 1053.53 1053.54 1053.55 1053.551053.551053.55 1053.57 1053.601053.60 1053.60 1053.60 1053.60 1053.601053.60 1053.60 1053.60 1053.60 1053.60 1053.60 1053.60 1053.65 1053.65 1053.65 OVERFLOW HP 1053.69 1053.70 1053.70 HP 1053.70 OVERFLOW HP 1053.70 1053.70 1053.72G 1053.72 1053.72 1053.74 1053.75 OVERFLOW HP 1053.80G 1054.30TC 1053.80G 1054.30TC 1053.80G 1054.30TC 1053.80G 1054.30TC 1053.80G 1054.30TC 1053.80G 1054.30TC 1053.80G 1054.30TC 1053.85 1053.85 1053.85G 1054.35TC 1053.90 1053.90 1053.90 LP 1053.95 1053.951053.95 1053.95 HP 1053.98 1054.00 1054.001054.00 1054.00 1054.00 1054.001054.00 1054.00G 1054.50TC 1054.00 1054.00 OVERFLOW HP 1054.00 1054.00 10541054 1054 1054 10541054 105410541054 1054 10541054 1054 10541054 1054 1054 1054 105410541054 1054 10 5 4 1054 1054 1054 10541054 1054 1054 1054 105410 5 4 10541054.01 1054.03 1054.05 1054.06 1054.10 1054.101054.10 1054.10 1054.10 1054.14 1054.15 1054.15 1054.20 1054.20 1054.20 1054.201054.20 1054.20 1054.30 1054.32 1054.36 1054.40 1054.401054.401054.40 1054.40G 1054.90TC 1054.40G 1054.90TC 1054.40 HP 1054.40 HP 1054.40 HP 1054.40 OVERFLOW HP 1054.40 HP 1054.43G 1054.451054.451054.45 1054.45 HP 1054.47 1054.501054.50 1054.50 OVERFLOW HP 1054.50 LP 1054.50 LP 1054.50 LP 1054.50 LP 1054.50 LP 1054.50 LP 1054.60G 1054.60 1054.60G 1055.10TC 1054.70 1054.70 1054.70 1054.701054.70 1054.70 1054.70 1054.70 1054.70 1054.70G 1055.20TC 1054.721054.80 1054.80 1054.80G 1055.30TC 1054.80G 1055.30TC 1054.80G 1055.30TC 1054.80G 1055.30TC 1054.80G 1055.30TC 1054.80G 1055.30TC 1054.80G 1055.30TC 1054.80G 1055.30TC 1054.81 1054.84 1054.90 1054.90 1054.90 1054.90 1054.90G 1055.40TC 1054.90G 1055.40TC 1054.90G 1055.40TC 1054.90G 1055.40TC 1054.90G 1055.40TC 1054.90G 1055.40TC 1054.90G 1055.40TC 1054.90 HP 1054.95 1055.00 1055.00 1055.00 1055.001055.00 1055.00 1055.00 1055.001055.00 1055.00 1055 105510551055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 10551055 1055 10551055 1055 10551055 1055 1055 1055 1055 1055 10551055 1055 1055 1055 10 5 5 1055.10 HP 1055.10 HP 1055.10 HP 1055.10 HP 1055.10 HP 1055.10 OVERFLOW HP 1055.15 1055.20 1055.201055.20 1055.20 1055.20 1055.20 1055.25 1055.33 1055.351055.35 1055.40 1055.40 1055.40 1055.401055.40 1055.40G 1055.90TC 1055.40G 1055.90TC 1055.40G 1055.90TC 1055.40G 1055.90TC 1055.43 1055.50 1055.50 1055.501055.50 1055.501055.50 1055.50 1055.50 1055.50 1055.50 1055.50 1055.501055.50 1055.50 1055.50 1055.501055.50 1055.55 1055.65 1055.70 1055.70 HP 1055.77 1055.80 1055.80 1055.851055.85 1055.87 1055.90 1056.001056.001056.001056.00 1056.00 1056.00 1056.00 1056.00 1056.00 1056.00 1056.00 1056.00 1056.00 1056 1056 1056 1056 1056 1056 10561056 1056 1056 1056 10561056 10561056 1056 10561056 1056.001056.00 1056.00 1056.00 1056.00 1056.30 1056.33 1056.40 1056.40 1056.40 1056.43 1056.50 1056.50 1056.50 1056.50 1056.50 1056.50 1056.70 H.P. 1057.00 1057.00 1057.00 1057.00 1057 105710571057 1057 1057 10571057 1057 10571057.40 1057.70 1057.70 1058 1058 1058 1058 1059 1059 10591059 TW=1060.00 BW=1059.00 1060 1060 TW=1061.00 BW=1059.00 1061 TW=1062.00 BW=1059.00 TW=1062.00 BW=1059.00 10621062 TW=1063.00 TW=1063.00 BW=1059.00 TW=1063.00 BW-1059.00 1063 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.0886\Cadd\SP06_1150886_GRA.dgn1/28/20164:14:04 PMSnyder1:40pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.0886 115.088610 10EDCEDCJWM11-18-15COVE AT KETTLESTONE APARTMENTS1REVISED AS PER CITY COMMENTS12/23/15JWM2REVISED AS PER CITY COMMENTS01/28/16JWM0 SCALE (FEET) 40 6 640'GRADING PLAN NOTES GRADING PLANDRIVEWAYS, AND SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES. 8. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, TO MINIMUM 6" DEPTH TO FINISH GRADES. 7. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD ROUTING, CRITICAL DIMENSIONS, CONNECTIONS, AND INVERT ELEVATIONS. IMPROVEMENTS WITH THE ARCHITECTURAL MECHANICAL/ ELECTRICAL/ PLUMBING SYSTEMS INCLUDING 6. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND COORDINATION OF ALL SITE UTILITIES AND SODDING ARE COMPLETE. PLAN. SILT FENCE AROUND STORM INTAKES SHALL BE MAINTAINED UNTIL PAVING AND SEEDING/ 5. CONTRACTOR SHALL PROVIDE SILT FENCE AROUND ALL STORM INTAKES AND WHERE SHOWN ON THE NOTED. 4. GRADES SHOWN ARE FINISHED GRADE AND/OR TOP OF PAVING SLAB (GUTTER), UNLESS OTHERWISE 3. PRIOR TO GRADING, THE OWNER/ CONTRACTOR SHALL OBTAIN A COESCO PERMIT. COMPENSATION. REPAIRED BY THE CONTRACTOR TO THE OWNERS SPECIFICATIONS WITHOUT ADDITIONAL 2. PROTECT EXISTING UTILITIES FROM CONSTRUCTION DAMAGE. ANY DAMAGE THAT OCCURS SHALL BE NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES OR RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE 1. UTILITY WARNING: THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/ 2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%3.3%2.5%2.0 %2 . 0%1.1%2.1%2.4%0.83%2.1%1.5%0.80%0.90%1.0%1.87%2.1%1.0%3.0%1.0%1.22% 0.83%4.0%3.25%3.25%0.80%3.13%2.38%1.0%2.34%4.4%3.20%1.0%2.38%1.0%1.0%1.83%1.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0% 2.0% 1.0%0.83%4.0%3.8%4.0%4.0%3.5%2.0% 0.88%4.0%4.0%2.0%1.0%4.0%3.88%4.0%3.0%4.13%0.94%0.80%1.25%1.0%1.0%3.80%1.0%1.6%1. 0 %1.2 %3.0% 1.0%0.83%2.0%1.1%4.0%2.0% 2.0% 2.0% 2.0% 2.0% 2.0 %2.0%2.0%4.0%3.0%2.0 %3.80%1.57%1.3% 0.80%2.0%100 YEAR=1058.70 2.0% Min.2.0% 100 YEAR=1047.13 1058.75 1058.751058.75OVERFLOW TOTAL DISTURBED AREA AREA = 411,038 SF 8"W 8"S 8"S 15"ST15"ST 15"ST 15"ST15"ST8"S24"ST24"ST1 8 "S T 8"WSE WACO PLACE / 98TH STREET24"ST8"SSE SAPPHIRE LANE8"W8"W10412681042 10421042 1043 1043 1043 10431043 1044 1044 1044 104410441044 1045 1045 1045 10 4 5 1045 1046 1046 1046 1046 10461046 1046 104610461046 1047 1047 1047 10471047 10471047 10471048 1048 1048 1048 10481048 1049 1049 1049 10491049 10491049 10491049 1050 1050 1050 1050 1050 10501050 1051 1051 1051 1051 1051 1051 1052 1052 1052 1052 1052 10521052 1052 1053 1053 1053 10 5 3 1053105310531053 1053 1053 105410541054 10 5 4 1054 1054 1054 10 5 4 1054 105410541054 1054 10541055 1055 1055 1055 1055 105510551055 10551056 1056 1056105610 5 6 1056 1056 1057 1057 105710571057 1057 1057 1057 1058 1058 1058105810581058 1058 1058 1059 1059 10591059 10591059 1059 1059 1059 1059 1059 1059 1059 1059 106010601060 10601060 10 6 0 1060 1060 1060 1 0 6 0 106110611061 1061 1061 106110621062 1062 1062 10621062 1063 1063 1063 1063 1064 ?EB V EB Buried24?" CMP SE F.L.=277.97 24" CMP N F.L.=278.86 24" CMP S F.L.=279.25 Broken15" CMP NW F.L.=278.40 Buried24" CMP N F.L.=269.80 12" CMP S F.L.=277.37 12" CMP S F.L.=278.08 CP2 CP3 CP4 Quest CP11CP12 F.L.=265.85 6" VCP SW /NE Intake=266.95 WEST PARK PLAT 1 PARCEL A LOT 3 GERLICH, KAREN A ETAL 50% KAREN A & MARGARET L TRUST 50% 3069 WACO PL, WAUKEE HAKEMAN, DALLAS D & LINDA M JTRS 3101 WACO PL, WAUKEE GILES, RICHARD W & CAROLYN A GILES TRUSTEES GILES, RICHARD W REVOCABLE TRUST LOT6 9.20 AC. 400,855 SF 9 14 2226161422 99 98 9 8 1314 12 8 18 GARAGE 13 GARAGECLUBHOUSEOFFICE M AINT 10887 16161610 13999 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS H36" ST30" ST 36" ST15" ST24" ST 24" ST 24" ST24" ST15" ST 12" ST12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 15" ST 15" ST 12" ST 18" ST 18" ST 18" ST 18" ST 18" ST24" ST15" ST18" ST18" ST 18" ST 12" ST 48" ST48" ST48" ST 18" ST 8"S8"S 8"S8" S8" W8" W8"W8"W8"W 8"W 8"WH15" ST 12" ST SE WACO PLACE / 98TH STREETFFE=1056.00 FFE=1056.50 FFE=1056.00 FFE=1055.50 FFE=1053.60 FFE=1053.10 FFE=1053.4 FFE=1053.4FFE=1054.20FFE=1054.00 FFE=1053.60 6"S6"S6"S6"S 6"W6"W6"W1"W SE BISHOP DRIVE POOL 24" ST 12" ST 1041 1042 1043 1043 10 4 4 104410451045 1045 1046 1046 10461047 1047 10 4 71047 1047 1047 10 4 7 104 7 104810 4 8 1048 10481048 1049 1049 1049 1049 10491050 1050 10501050 1051 1051 1051 1051 10511051105210521052 1052 10 5 210521052 1052 10521052105210521052 1052 10521052105310531053 1053 1053105310531053 1053 1053 1053 1053 1053 10531053 1053 1053 10 5 3 1053 1053 1053 105310541054 1054 1054 10541054 105410541054 1054 10541054 1054 10541054 1054 1054 1054 105410541054 1054 10 5 4 1054 1054 1054 10541054 1054 1054 1054 105410 5 4 10541055 105510551055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 10551055 1055 10551055 1055 10551055 1055 1055 1055 1055 1055 10551055 1055 1055 1055 10 5 5 1056 1056 1056 1056 1056 1056 10561056 1056 1056 1056 10561056 10561056 1056 10561056 1057 105710571057 1057 1057 10571057 1057 10571058 1058 1058 1058 1059 1059 10591059 1060 1060 106110621062 1063 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.0886\Cadd\SP07_1150886_ERO.dgn1/28/20164:14:07 PMSnyder1:49.9999pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.0886 115.088610 10EDCEDCJWM11-18-15COVE AT KETTLESTONE APARTMENTS1REVISED AS PER CITY COMMENTS12/23/15JWM2REVISED AS PER CITY COMMENTS01/28/16JWMGRADING PLAN GENERAL NOTES POLLUTION PREVENTION NOTES 3" Barrel 2 3 1 2 2 1 Overflow Elevation contract documents) only when specified in the Anti-seep collars (required SEDIMENT BASIN WITH EMERGENCY SPILLWAY "Wet" Storage 1,800 CF/Acre "Dry" Storage 1,800 CF/Acre Principal Spillway depth varies. Dry storage Dewatering Orifice depth varies. Wet storage Bottom of Basin as specified. 18" min., or Concrete Base as specified Diameter, D Embed riser 12" 1'-0" Min.'D' Varies 1'-0" Min. specified in the contract documents. Elevations and dimensions not given are as Corrugated Metal Riser Leave top of riser open. 4 1 2% 1 3 2 1 9040.16. Anti-vortex device: See Figure device: See Figure 9040.15. Riser pipe and base/dewatering specified in the contract documents. Barrel length and diameter as 4 1 2% STORMWATER MANAGEMENT QUANTITIES OF THE "NOTICE OF DISCONTINUATION". REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND SITE WASTE PRIOR TO FILING k. ONSITE. OR OTHER CONTROL DEVICE WHERE POSSIBLE. CONCRETE WASHOUT MUST BE CONTAINED AREAS WITH DIVERSION BERMS AND/OR SILT BARRIERS AND DIRECT TO A SEDIMENT BASIN MATERIALS STORAGE, AND CONCRETE WASHOUT FACILITY. CONTROL RUNOFF FROM STAGING TRAILERS, FUELING / VEHICLE MAINTENANCE AREA, TEMPORARY SANITARY FACILITIES, UNLESS NOTED OTHERWISE, STAGING AREAS SHOULD CONTAIN THE FOLLOWING: JOB COORDINATE LOCATIONS OF STAGING AREAS WITH THE OWNER AND RECORD IN THE SWPPP. j. CALENDAR DAYS. CONSTRUCTION ACTIVITY HAS FINISHED OR IS PLANNED TO BE DELAYED MORE THAN 21 OPERATIONS. INITIATE STABILIZATION MEASURES NO LATER THAN 14 CALENDAR DAYS AFTER SEED MIX, OR SOD AS SOON AS PRACTICAL UPON COMPLETION OR DELAY OF GRADING STABILIZE UNDEVELOPED, DISTURBED AREAS WITH MULCH, TEMPORARY SEED MIX, PERMANENT i. LOCATED. ALL DISTURBED AREAS, EXCEPT WHERE PAVEMENT, BUILDINGS OR OTHER IMPROVEMENTS ARE RESPREAD A MINIMUM OF 6 INCHES OF TOPSOIL (INCLUDING TOPSOIL FOUND IN SOD) ON h. INSTALLED. PROVIDE INLET AND OUTLET CONTROL MEASURES AS SOON AS STORM SEWERS ARE AND AS CONSTRUCTION OPERATIONS PROGRESS TO ENSURE CONTINUOUS RUNOFF CONTROL. MATS, MULCH, DITCH CHECKS OR RIPRAP AS SOON AS AREAS REACH THEIR FINAL GRADES INSTALL NECESSARY CONTROL MEASURES SUCH AS SILT BARRIERS, EROSION CONTROL g. DEBRIS IMMEDIATELY AND TAKE REMEDIAL ACTIONS FOR FUTURE PREVENTION. DRAINAGEWAYS, OR UNDERGROUND SEWERS. REMOVE ANY ACCUMULATION OF EARTH OR ADJOINING PUBLIC OR PRIVATE PROPERTIES, INCLUDING STREETS, DRIVEWAYS, SIDEWALKS, PREVENT ACCUMULATION OF EARTH AND DEBRIS FROM CONSTRUCTION ACTIVITIES ON f. IMPLEMENT ANY RECOMMENDED MEASURES WITHIN 3 DAYS. WEEKLY TO THE OWNER OR ENGINEER DURING CONSTRUCTION. REVISE THE SWPPP AND INSPECTIONS AND ANY RESULTING ACTIONS IN THE SWPPP WITH A COPY SUBMITTED BY THE CONTRACTOR) EVERY SEVEN CALENDAR DAYS. RECORD THE FINDINGS OF THESE INSPECT THE PROJECT AREA AND CONTROL DEVICES (BY QUALIFIED PERSONNEL ASSIGNED e. HAVE LOST 50% OF THEIR ORIGINAL CAPACITY. THE PERMIT PERIOD. CLEAN OR REPLACE SILT CONTROL DEVICES WHEN THE MEASURES ORDER, INCLUDING CLEANING, REPAIRING, REPLACEMENT, AND SEDIMENT REMOVAL THROUGHOUT MAINTAIN ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES IN WORKING d. A MINIMUM THE TOTAL AREA DISTURBED BY CONSTRUCTION OPERATIONS AT ANY TIME. PRESERVE EXISTING VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION AND LIMIT TO c. DISTURBING ACTIVITIES PRIOR TO SITE CLEARING AND GRADING OPERATIONS. DITCH CHECKS, DIVERSION BERMS, OR SEDIMENTATION BASINS DOWNSTREAM OF SOIL INSTALL PERIMETER AND FINAL SEDIMENT CONTROL MEASURES SUCH AS SILT BARRIERS, b. AND MAXIMIZE STORM WATER INFILTRATION, AND MINIMIZE SOIL COMPACTION. WATERS, DIRECT STORM WATER TO VEGETATED AREAS TO INCREASE SEDIMENT REMOVAL DISCHARGING FROM BASINS, PROVIDE AND MAINTAIN NATURAL BUFFERS AROUND SURFACE UTILIZE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE WHEN a. UNLESS INFEASIBLE OR NOT APPLICABLE: GENERAL PERMIT AND SWPPP, INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING BMP'S THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL REQUIREMENTS OF THE 4. CONSTRUCTION PROGRESS AND CHANGES AT THE PROJECT SITE. THE SWPPP AND SITE MAP SHOULD BE EXPEDITIOUSLY REVISED TO REFLECT 3. BMP'S FROM THOSE SHOWN ON THE PLAN MAY BE REQUIRED. RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY, NOTE AND IMPLEMENT. ADDITIONAL CONTROL MEASURES REQUIRED AS A RESULT OF CONSTRUCTION ACTIVITIES ARE THE FOR COMPLIANCE WITH THE PROJECT'S NPDES PERMIT COVERAGE. ALL BMP'S AND EROSION THE SWPPP ILLUSTRATES GENERAL MEASURES AND BEST MANAGEMENT PRACTICES (BMP) 2. MADE DURING CONSTRUCTION. FOR ADDITIONAL REQUIREMENTS AND MODIFICATIONS TO THE POLLUTION PREVENTION PLAN ADDITION TO THESE PLAN DRAWINGS. THE CONTRACTOR SHOULD REFER TO THE SWPPP THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS A SEPARATE DOCUMENT IN 1. POLLUTION PREVENTION PLAN:C. ACCEPTANCE AND/OR SUBMITTAL OF THE NOTICE OF DISCONTINUATION. RECORD COPY AND PROVIDE THE ORIGINAL DOCUMENTS TO THE OWNER UPON PROJECT PERIOD OF THREE YEARS AFTER PROJECT COMPLETION. THE CONTRACTOR SHALL RETAIN A ALL PLANS, INSPECTION REPORTS, AND OTHER DOCUMENTS MUST BE RETAINED FOR A OF THE DISTURBED SITE AND REMOVAL OF ALL TEMPORARY EROSION CONTROL MEASURES. A "NOTICE OF DISCONTINUATION" MUST BE FILED WITH THE IDNR UPON FINAL STABILIZATION 3. THE CODE OF IOWA. WITH THE NPDES PERMIT REQUIREMENTS IS A VIOLATION OF THE CLEAN WATER ACT AND JURISDICTIONAL AGENCIES WITHIN 3 HOURS OF BEING REQUESTED. FAILURE TO COMPLY SITE OR OFFSITE. IF KEPT OFFSITE, THESE DOCUMENTS MUST BE PRESENTED TO ANY LETTER, CURRENT SWPPP, SITE INSPECTION LOG, AND OTHER ITEMS, SHALL BE KEPT ON LIMITED TO, THE NOTICE OF INTENT, PROOF OF PUBLICATIONS, DISCHARGE AUTHORIZATION ALL DOCUMENTS RELATED TO THE STORM WATER DISCHARGE PERMIT, INCLUDING, BUT NOT 2. OBTAINING THE GENERAL PERMIT COVERAGE FROM THE IDNR. MAINTAINING THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND POSSIBLY ALL REQUIREMENTS OF THE NPDES GENERAL PERMIT NO. 2 INCLUDING CREATING OR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FOR COMPLIANCE WITH AND FULFILLMENT OF REQUIRED BY THE ENVIRONMENTAL PROTECTION AGENCY (EPA). THE GENERAL CONTRACTOR WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES FROM THE IDNR, AS THIS PROJECT REQUIRES COVERAGE UNDER THE NPDES GENERAL PERMIT NO. 2 FOR STORM 1. STORM WATER DISCHARGE PERMITB. ITEMS AND DEDUCT THE COST THEREOF FROM AMOUNTS DUE TO THE CONTRACTOR. ADJOINING PUBLIC OR PRIVATE PROPERTY, THE OWNER MAY, BUT NEED NOT, REMOVE SUCH STEPS TO PROMPTLY REMOVE EARTH SEDIMENTATION OR DEBRIS WHICH COMES ONTO FEES INCURRED TO OWNER. FURTHER, IF THE CONTRACTOR FAILS TO TAKE NECESSARY DAMAGES TO ADJOINING PUBLIC OR PRIVATE PROPERTY, INCLUDING REASONABLE ATTORNEY HARMLESS FROM ANY AND ALL CLAIMS OF ANY TYPE WHATSOEVER RESULTING FROM DAMAGE CLAIMS: THE CONTRACTOR WILL HOLD THE OWNER AND ARCHITECT / ENGINEER 2. PERFORMANCE. OFF-SITE BORROW OR DEPOSIT AREAS DURING PERFORMANCE OR AS A RESULT OF TO PROTECT AGAINST EROSION AND POLLUTION FROM THIS PROJECT SITE AND ALL ACT AND ANY LOCAL ORDINANCES. THE CONTRACTOR SHALL TAKE ALL NECESSARY STEPS IOWA DEPARTMENT OF NATURAL RESOURCES (IDNR) NPDES PERMIT, THE U.S. CLEAN WATER POTENTIAL POLLUTION AND SOIL EROSION CONTROL REQUIREMENTS OF THE IOWA CODE, THE CODE COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL 1. POLLUTION PREVENTION AND EROSION PROTECTIONA. diameter as specified. Discharge pipe barrel, 24" RCP 3-Rows/18-Columns(54 holes)1"Dia. specified. Provide perforation configuration as Length of bars = D+16 inches configuration. and insert two, #4 bars in an "X" 3 inches from bottom of riser pipe Drill four, 5/8 inch diameter holes, 30" Riser 1' Min. 10' Min. EMERGENCY SPILLWAY SECTION MANAGEMENT FACILITY LOCATIONS POTENTIAL STORM WATER OVERFLOW ROUTES 7 740'EROSION AND SEDIMENT CONTROL PLAN0 SCALE (FEET) 50 700 SF OF RECP OVERFLOW =1047.50 TYP. SILT FENCE TYP. SILT FENCE TYP. SILT FENCE REGRADE BASIN TO FINISH DESIGN GRADES PRIOR TO SEEDING. G. CONTRACTOR TO REMOVE ANY SEDIMENT FROM BASIN ACCUMULATED DURING CONSTRUCTION AND DRIVEWAYS, AND SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES. F. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, RESPREAD TO MINIMUM 6" DEPTH TO FINISH GRADES. E. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. SODDING ARE COMPLETE. SEDIMENT BASKETS SHALL BE PROVIDED ONCE PAVING IS COMPLETE THE PLAN. SILT FENCE AROUND STORM INTAKES SHALL BE MAINTAINED UNTIL PAVING AND SEEDING/ D. CONTRACTOR SHALL PROVIDE SILT FENCE AROUND ALL STORM INTAKES AND WHERE SHOWN ON NOTED. C. GRADES SHOWN ARE FINISHED GRADE AND/OR TOP OF PAVING SLAB (GUTTER), UNLESS OTHERWISE COMPENSATION. REPAIRED BY THE CONTRACTOR TO THE OWNERS SPECIFICATIONS WITHOUT ADDITIONAL B. PROTECT EXISTING UTILITIES FROM CONSTRUCTION DAMAGE. ANY DAMAGE THAT OCCURS SHALL BE FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY AND/ OR RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN A. UTILITY WARNING: THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION Design High Water=1044.90 Principal Spillway=1043.90 Top of Embankment=1048.00 Emergency Spillway=1047.50 Bottom of Basin=1040.75 Dewatering Orifice=1043.04 min.1.0'1043.90 1043.45 1043.25 1043.04 DEVICE (PERFORATED RISER) EXISTING SEDIMENT BASIN DEWATERING 100 YEAR=1047.13 SOD 3.50 AC TYPE 1 PERMANENT LAWN MIXTURE 0.72 AC SOD,SEEDING, FERTILIZING & MULCHING 4.22 AC SEDIMENT BASKETS 13 EA EXISTING TEMPORARY SEDIMENT RISER 1 EA SILT FENCE 1340 LF 100 YEAR=1058.70 BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT SEDIMENT STAND PIPE 30" PVC TEMPORARY WATERSHED TO WALNUT CREEK DISCHARGE LOCATION PROPERTY OWNER) (COORDINATE WITH STAGING AREA PROPERTY OWNER) AND FINAL LOCATION WITH LOCATION (COORDINATE SIZE APPROX. TOPSOIL STOCKPILE ENTRANCE CONSTRUCTION STABILIZED (FIELD VERIFY WITH ENGINEER) APPROX. CONCRETE WASHOUT LOCATION 1041 1042 1043 1043 10 4 4 104410451045 1045 1046 1046 10461047 1047 10 4 71047 1047 1047 10 4 7 10 4 7 104810 4 8 1048 10481048 1049 1049 1049 1049 10491050 1050 10501050 1051 1051 1051 1051 105 11051105210521052 1052 10 5 210521052 1052 10521052105210521052 1052 10521052105310531053 1053 1053105310531053 1053 1053 1053 1053 1053 10531053 1053 1053 10 5 3 1053 10 5 3 1053 105310541054 1054 1054 10541054 105410541054 1054 10541054 1054 10541054 1054 1054 1054 105410541054 1054 10 5 4 1054 1054 1054 10541054 1054 1054 1054 105410 5 4 10541055 105510551055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 10551055 1055 10551055 1055 10551055 1055 1055 1055 1055 1055 10551055 1055 1055 1055 10 5 5 1056 1056 1056 1056 1056 1056 10561056 1056 1056 1056 10561056 10561056 1056 10561056 1057 105710571057 1057 1057 10571057 1057 10571058 1058 1058 1058 1059 1059 10591059 1060 1060 106110621062 1063 10412681042 10421042 1043 1043 1043 10431043 1044 1044 1044 10441044 1045 1045 1045 1045 1046 1046 1046 1046 10461046 104610461046 1047 1047 1047 1047 104710471048 1048 1048 1048 10481048 1049 1049 1049 10491049 104910491049 1050 1050 1050 1050 1050 10501051 1051 1051 1051 1051 1052 1052 1052 1052 10 5 2 10521052 1053 1053 1053 10 5 3 1053105310531053 1053 1053 105410541054 10 5 4 1054 1054 1054 10 5 4 1054 105410541054 1054 10541055 1055 1055 1055 1055 105510551055 10551056 1056 1056105610 5 6 1056 1056 1057 1057 105710571057 1057 1057 1057 1058 1058 1058105810581058 1058 1059 1059 105910591059 1059 1059 1059 1059 1059 1059 1059 1059 10601060 10601060 1 0 6 0 1060 1060 1060 1 0 6 0 1061 1061 1061 1061 1062 1062 1062 1063 1063 Steel Hatches Buried24?" CMP SE F.L.=277.97Broken15" CMP NW F.L.=278.40 12" CMP S F.L.=277.37 12" CMP S F.L.=278.08 CP2 CP3 Asphalt AsphaltGravel98TH STREETEl=287.71 North Rail El=283.55 North Rail CP11 F.L.=265.85 6" VCP SW /NE Intake=266.95 WEST PARK PLAT 1 PARCEL A LOT 3 GERLICH, KAREN A ETAL 50% KAREN A & MARGARET L TRUST 50% 3069 WACO PL, WAUKEE HAKEMAN, DALLAS D & LINDA M JTRS 3101 WACO PL, WAUKEE GILES, RICHARD W & CAROLYN A GILES TRUSTEES GILES, RICHARD W REVOCABLE TRUST LOT6 9.20 AC. 400,855 SF 8"W 8"S 15"ST15"ST 15"ST 15"ST15"ST8"S24"ST24"ST1 8 "S T 8"WSE WACO PLACE / 98TH STREET24"ST8"S150' HYDRANT COVERAGE8"W8"W BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.0886\Cadd\SP08_1150886_LND.dgn1/28/20164:14:10 PMSnyder1:40pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.0886 115.088610 10EDCEDCJWM11-18-15COVE AT KETTLESTONE APARTMENTS1REVISED AS PER CITY COMMENTS12/23/15JWM2REVISED AS PER CITY COMMENTS01/28/16JWM9 14 2226161422 99 98 9 8 1314 12 8 18 GARAGE 13 GARAGECLUBHOUSEOFFICE M AINT 10887 16161610 13999 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS H36" ST30" ST 36" ST15" ST24" ST 24" ST 24" ST24" ST15" ST 12" ST12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 15" ST 15" ST 12" ST 18" ST 18" ST 18" ST 18" ST 18" ST24" ST15" ST18" ST18" ST 18" ST 12" ST 48" ST48" ST48" ST 18" ST 8"S8"S 8"S8" S8" W8" W8"W8"W8"W 8"W 8"WH15" ST 12 " ST FFE=1056.00 FFE=1056.50 FFE=1056.00 FFE=1055.50 FFE=1053.60 FFE=1053.10 FFE=1053.4 FFE=1053.4FFE=1054.20FFE=1054.00 FFE=1053.60 6"S6"S6"S6"S 6"W6"W6"W1"W POOL 24" ST 12" ST 0 SCALE (FEET) 40 40'PLANTING PLANPLANTING PLAN GENERAL NOTES LANDSCAPE REQUIREMENTS AND CALCULATIONS BOTANICAL NAMEKEY SHRUBSSIZE COMMENTS 2" B&B AG AUTUMN BRILLANCE SERVICEBERRYAmelanchier x grandiflora 'Autumn Brilliance'B&B, MULTI-STEM 2" 2" B&B 2" B&B 2" B&B 2" B&B B&B GT CO Celtis occidentalis 'Prairie Pride' CONT. (6' O.C.) HP CONT. (6' O.C.)JC PLANT SCHEDULE QB Quercus bicolor SWAMP WHITE OAK B&B B&B PRAIRIE PRIDE HACKBERRY 24" HT. 24" Ht. CONT. (4' O.C.) CONT. (4' O.C.) Viburnum dentatum 'Christom'BLUE MUFFIN VIBURNUM CONT. (6' O.C.)36" Ht. 6' HT. COMMON NAME Gleditisia triacanthos var. inermis 'Skyline'SKYLINE HONEYLOCUST Malus 'Spring Snow'SPRING SNOW CRABAPPLETREESMS 8 8B&B 5-MS 3-OV2-QB 6-VD 1-CO 2-QB 2-QB 1-CO 1-MR 2-MR 3-AF 1-AF 2-SB 5-SB 1-AF 1-AF1-MR 1-AF 1-PO3-TM 3-JC 3-SB 4-JC 1-PO 2-JC 1-UM 1-UM 1-AF 1-CO 1-AF 2-AF 11-SB 4-SB 7-SB 6-SB 7-JC 2-MS 1-AF 2-AF 1-GT 1-AF 1-GT 1-AF 1-AR 1-OV 1-OV 1-AF 9-VD 9-VD 6-SB 2-PO 5-HP 3-PO2-PO 5-VD 3-MS 4-VD 1-CO 1-QB 1-AG 2-CO 2-CO 2-UM 1-CO 2-UM 3-CO 2-CO 1-UM 3-MR 1-UM 1-CO 13-JC 8-SB 8-SB 3-MS 8-SB 9-SB 9-SB 1-GT 3-GT 5-AR 4-UM 3-CO 1-AF 1-AF 5-UM 1-AF 1-TM 8-VD 1-TM 1-1/2" UM 24" Ht. 24" Ht. 12" Ht. MR AF 1-1/2" AR TREESUNDERSTORYPhysocarpus opulifolius 'Donna May'LITTLE DEVIL NINEBARK VD PO SB TM Hydrangea paniculata 'Jane'LITTLE LIME HYDRANGEA CONT. (4' O.C.) ANTICIPATED MECHANICAL UNIT LOCATIONS. Acer x freemanii 'Marmo'MARMO MAPLE Taxus x media 'Taunton'TAUNTON YEW Spiraea betulifolia 'Tor'TOR BIRCHLEAF SPIREA Juniperus chinensis 'Daub's Frosted'DAUB'S FROSTED JUNIPER Malus 'Royal Raindrops'ROYAL RAINDROPS CRABAPPLE ACCOLADE ELM OV 1-1/2"EASTERN HOP HORNBEAM Acer rubrum 'Karpick'KARPICK RED MAPLE 5-VD Ulmus Morton 'Accolade' Ostrya virginiana 5-JC SEED TO ELEVATION 1047.50 TYPE 1 PERMANENT LAWN SEED MIX LOW GROW GRASS MIXTURE APPROXIMATE LOCATION OF PROPOSED MECHANICAL UNITS 4-PO 4-SB4-SB 4-PO 4-PO 4-SB 4-SB 4-SB 4-SB 4-PO 4-PO 4-SB 4-SB 4-PO 4-SB4-SB 4-HP 4-SB 1-VD 1-VD 7-SB4-PO6-SB7-SB 1-CO 3-HP 2-PO 4-SB 4-HP 4-SB 3-HP 7-HP7-HP 4-PO 4-PO 6-HP 1-OV 2-UM 2-UM 1-CO 2-MR 1-TM 8-VD 3-HP 7-HP 4-SB 4-SB 4-HP 4-SB 2-PO 4-PO 4-SB 4-PO6-HP 4-SB 4-HP 1-TM 4-SB 3-HP 5-VD 7-HP4-SB 4-PO 1-OV 1-AF 4-PO 1-AF 7-PO INSTALL AS PER MANUFACTURER'S RECOMMENDATIONS. INSTALL IN LOCATIONS INDICATED ON PLAN. G. PROVIDE LOW GROW GRASS MIXTURE AS SUPPLIED BY UNITED SEEDS INC., DES MOINES, IA. 515-282-1750. F. SOD ALL DISTURBED AREAS UNLESS NOTED OTHERWISE. PERIMETER, AND IN ALL AREAS INDICATED ON PLAN. E. PROVIDE 3-INCH DEPTH SHREDDED HARDWOOD MULCH AROUND ALL PLANTINGS TO A MIN. 3-FOOT DATE OF INSTALLATION. D. CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM STANDARDS FOR NURSERY STOCK" (ANSI Z60.1-LATEST EDITION). C. ALL PLANT MATERIAL SHALL AT LEAST MEET MINIMUM REQUIREMENTS SHOWN IN THE "AMERICAN WITH UTILITY COMPANIES DURING CONSTRUCTION. CARELESSNESS SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. COORDINATE AND COOPERATE TO UTILITIES AND SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO THE CONTRACTOR'S FOR DETERMINING EXISTENCE, EXACT LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE B. NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT WARRANT THAT THE THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS OBTAINED. A. UTILITY WARNING: (24 OVERSTORY TREES PROVIDED) 1 OVERSTORY TREE PER 40 LF OF FRONTAGE STREET TREE REQUIREMENT: THERE ARE NO BUFFER REQUIREMENTS BUFFER REQUIREMENT: FOUNDATION PLANTINGS ARE REQUIRED AT THE BASE OF ALL BUILDINGS FOUNDATION PLANTINGS: 120.24 (121 SHRUBS PROVIDED)2.0 x 60.128 = 30.06 (31 UNDERSTORY TREES PROVIDED) 0.5 x 60.128 = 60.124 (61 OVERSTORY TREES PROVIDED)1.0 x 60.128 = 60,128/1,000 = 60.124 REQUIRED OPEN SPACE. 1.0 OVERSTORY TREES, 0.5 UNDERSTORY TREES, AND 2.0 SHRUBS PER 1,000 SF OF 400,855 SF (TOTAL LOT) x 15% = 60,128.25 SF REQUIRED (164,127 SF PROVIDED - 40.9%) 15% OPEN SPACE REQUIRED AND THE KETTLESTONE DESIGN GUIDELINES PUD) (LANDSCAPE CALCULATIONS BASED UPON CITY OF WAUKEE ZONING CODE REQUIREMENTS (if required) Parallel Ra mpSi d e wal kSta n d ar d (t yp.) 1'-0" 5 TYPICAL SECTION - CURB RAMP 2.0% (max) 1.5% (target)Slope Varies 43 6" min. 4" min. 6" min.5'-0" m i n.seiraV Grade Break Special Shaping 5'-0" m in. ATTACHMENT TO POST Fabric Post cable ties Wire or 5 TYPICAL SILT FENCE DITCH CHECK F oresl o p eVariable (20' for a normal 10' wide ditch.) (5'-0" max.) Post spacing (5'-0" max.) Post spacing 4 5 1 3 Backslope 902 904 906 908 910 TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES individual section of silt fence Install "J-hook" at each end of an ground contour Install parallel to (Plan View) (600' if slope is flatter than 5%) 200' max. length per section documents or as directed by the Jurisdictional Engineer. Section 9040, 3.07 and at locations shown in the contract Install silt fence according to the requirements of GENERAL NOTES: 1 2 3 4 5 Insert 12 in. of fabric a minimum of 6 in. deep (fabric may be folded below the ground line) Compact ground by driving along each side of the silt fence as required to sufficiently secure the fabric in the trench to prevent pullout and flow under the fence. In ditches, extend silt fence up side slope so the bottom elevation at the end of the fence is a minimum of 2 in. higher than the top of the fence in the low point of the ditch. Steel posts to be embedded 20 in. unless otherwise allowed by the Jurisdictional Engineer. Secure top of engineering fabric to steel posts using wire or plastic ties (50 lb. min.). See details of "Attachment to Posts." TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES Ground line Fabric Flow 4'-0" minimum 'T' steel fence post (Profile View) 4 1 1 2 See plans for spacing NO SCALE SILT FENCE DETAIL Ground line Fabric 1 5 4 or as required to adequately support fence Reduce post spacing to 5'-0" at water concentration areas, 8'-0"spacing 24"DETAILS OF SILT FENCE ON LONGITUDINAL SLOPES36"6'' (Trees larger than 2 1/2 inch diameter) STAKING PLAN 1 1 (4'-0" MIN.) TREE HEIGHT 1/2 TO 2/3 (2'-0" MIN.) TREE HEIGHT 1/4 TO 1/3 6" 1 1 NO SCALE DECIDUOUS TREE STAKING DETAIL NO SCALE PLANTING PIT DETAILS NO SCALE TREE DRAINAGE WELL DETAIL Diameter 8" to 12" 6' DEPTH SLOPE PLANTING PIT DETAIL SCARIFY SIDES OF PIT LOCATED AT TOP OF ROOTBALL 2" OF TRUNK. ROOT COLLAR IS NOT ALWAYS FINISH GRADE. DO NOT PLACE MULCH WITHIN SET ROOT COLLAR AND ROOT FLARE 2" ABOVE MINIMUM FOR SHRUBS 2X ROOTBALL MINIMUM FOR TREES 3X ROOTBALL ROOT SYSTEM OR CONTAINER DEPTH OF ROOT BALL EXISTING SLOPE FINISH GRADE PLACE ROOT BALL ON UNDISTURBED SOIL TREE OR SHRUB ROOT BALL BEGIN TRANSITION AT EDGE OF 2:1 MAXIMUM TRANSITION SLOPE. MINIMUM 6' DIAMETER, 3" DEPTH MULCH RING BEYOND EDGE OF ROOT BALL 3" HEIGHT WATER RETENTION BERM BASKET MINIMUM. MINIMUM TOP 1/2 OF BURLAP AND WIRE BALLED AND BURLAP (B&B) PLANTS REMOVE MATERIAL. REMOVE ALL TWINE. FOR IMPEDE THE GROWTH OF THE PLANT CONTAINERS OR OTHER MATERIAL THAT WILL REMOVE ALL NON-BIODEGRADABLE MATERIAL, TO SOUTHWEST PLACE ON STAKE TO SOUTHWEST PLACE ON STAKE inch diameter or smaller}2 1{Trees 2 STAKING PLAN MATERIAL FLAGGING GARDEN HOSE DETAILS SEE PLANTING PIT SEE PLANTING PIT DETAIL FINISH GRADE IMPERVIOUS SOIL SEPTIC GRAVEL {IF PRESENT} PERVIOUS SOIL BY ENGINEER. INSTALLATION; AS APPROVED IMPERVIOUS SOILS ARE FOUND DURING TREE DRAINAGE WELL ONLY REQUIRED IF NOTE: into the pervious soil layer. extends a minimum of 12 inches well may be termineated when the well depth less the 6 feet, the drainage If pervious soil is encountered at a ENGINEERING FABRICRoot Ball Dia mete r 1 1/2 to 2 Tim es SCARIFY SIDES OF PIT TYPICAL PLANTING PIT DETAIL LOCATED AT TOP OF ROOTBALL 2" OF TRUNK. ROOT COLLAR IS NOT ALWAYS FINISH GRADE. DO NOT PLACE MULCH WITHIN SET ROOT COLLAR AND ROOT FLARE 2" ABOVE MINIMUM FOR SHRUBS 2X ROOTBALL MINIMUM FOR TREES 3X ROOTBALL ROOT SYSTEM OR CONTAINER DEPTH OF ROOT BALL FINISH GRADE PLACE ROOT BALL ON UNDISTURBED SOIL BEYOND EDGE OF ROOT BALL 3" HEIGHT WATER RETENTION BERM BASKET MINIMUM. MINIMUM TOP 1/2 OF BURLAP AND WIRE BALLED AND BURLAP (B&B) PLANTS REMOVE MATERIAL. REMOVE ALL TWINE. FOR IMPEDE THE GROWTH OF THE PLANT CONTAINERS OR OTHER MATERIAL THAT WILL REMOVE ALL NON-BIODEGRADABLE MATERIAL, MINIMUM 6' DIAMETER, 3" DEPTH MULCH RING branch. Wrap trunk from ground line to first 1'(TRANSITION MATS) OUTLET AND CHANNEL SCOUR PROTECTION SECTION VIEW SOIL COVER CULVERT OUTLET PROTECTION - PLAN VIEW (TYPICAL TRANSITION MAT APRON AT CULVERT OUTLET INTO CHANNEL) APPROPRIATE SOIL COVER EROSION WITH DOWNSTREAM SOILS FROM PROTECT BARE/DISTURBED SOIL COVER PROTECTION FOR DOWNSTREAM CALCULATOR TO COMPUTE USE NORMAL-DEPTH DIAMETER. HALF THE CULVERT UP TO A DEPTH AT LEAST AND BOTH SIDE SLOPES WIDTH OF CHANNEL (W) PROTECTION: BOTTOM RECOMMENDED WIDTH OF TRANSITION MATS TRANSITION MAT APRON LENGTH ANCHOR PATTERN OF FLOW DIRECTION EXTRA ANCHORS AS NEEDED FOR UNEVEN SOIL SURFACE. EXTRA ANCHORS AS NEEDED FOR LOOSE OR WET SOILS. USE A MINIMUM OF 8 ANCHORS PER MAT. ADJACENT MATS ABUT TOGETHER LATERALLY AND LONGITUDINALLY. TOP OF SCOURSTOP MATS SHOULD BE FLUSH WITH OR BELOW CULVERT. ABUT TRANSITION MATS TO END OF CULVERT OR CULVERT APRON. TRANSITION MAT WASHER LOCK RECESSED BULLET ANCHOR 36" ANCHOR STRAP ANCHOR ILLUSTRATION EXTRA ANCHORS AS NEEDED TO SECURE MAT TIGHTLY OVER SOIL COVER. MINIMUM DEPTH 24" IN LOOSE, SANDY OR WET SOIL. MINIMUM DEPTH 12" IN COMPACTED, COHESIVE SOIL. DRIVE ANCHOR INTO FIRM SOIL, PULL UP ON STRAP TO SET BULLET. NO SCALE FTM/TRM DETAIL LENGTH OF PROTECTION WIDTH OF PROTECTIONNO SCALE FIRE HYDRANT ASSEMBLY NOTES MINIMUM SIZE FOR PIPING. VALVES AND FITTINGS FROM WATER MAIN TO HYDRANT INLET: 6". 1. PROVIDE TRACER WIRE AND TRACER WIRE STATION.2. WRAP HYDRANT, PIPE AND FITTINGS WITH POLYETHYLENE ENCASEMENT. 3. VALVE BOX ANCHORING TEE OR STANDARD UNDISTURBED EARTH TEE AND ANCHORING COUPLING2'-0"DEPTH VARIES1'-0" X 1'-0" X 4" CONCRETE PAD BACKFILL WITH 3/4" WASHED GRAVEL MAIN TRENCH WALL VARIES WATER MAIN THRUST BLOCKANCHORING PIPE GATE VALVEMIN. 6'-0"18" MIN. OR TRACER WIRE. NOT COVER DRAIN HOLES UNDISTURBED EARTH. DO THRUST BLOCK AGAINST POURED CONCRETE HYDRANT SITE DETAILS99 9 1 9 2 9 3 9 4 9 5 9 6 NO SCALE9 7 NO SCALE9 8 3 3 1 2 4 4 1 2 3 4 5 slope or flatter. Match pedestrian street crossing cross maximum cross slope of 2.0%. Target cross slope of 1.5% with a running slope of 8.3%. running slope of 6.25% with maximum Perpendicular Curb Ramp: Target feet by 5 feet. travel directions of 2.0%. Minimum 5 with maximum slope perpendicular to the Turning Space: Target slope of 1.5% than 15 feet. 8.3% slope for parallel ramps shorter of the resulting slope. Do not exceed required to exceed 15 feet, regardless The length of the parallel ramp is not landing and the standard sidewalk. elevation difference between the provide a parallel ramp to make up the and landing due to limited ramp length, perpendicular ramp between the street elevation cannot be achieved with the Parallel Curb Ramp: If normal sidewalk 1 2 3 4 Pavement (length varies)(if required) 8.3% (max.)6.25% (target) 1 2 Cross Slope 5% max. (4'-0"x4'-0" min.) Detectable warning Key Curb Ramp Detectable warning Key Turning Space Curb Ramp Grass CURB RAMP FOR SIDEWALK GENERAL SIDEWALK AND CURB RAMP DETAILS 1 2" Sealed expansion joint See Detail A Parallel Curb RampTurning SpacePerpendicular Curb Ramp Sidewalk Standard 12"18" Turning Space front or back of the turning space. " sealed expansion joint at •provide than 15 feet. 8.3% slope for parallel ramps shorter of the resulting slope. Do not exceed required to exceed 15 feet, regardless The length of the parallel ramp is not standard sidewalk. difference between the landing and the ramp to make up the elevation limited ramp length, provide a parallel between the street and landing due to achieved with the perpendicular ramp If normal sidewalk elevation cannot be of 2.0%. Minimum 4 feet by 4 feet. perpendicular to the travel directions Target slope of 1.5% with maximum slope panel. concrete below the detectable warning Provide a minimum of 6 inches of flares. turning space, exclusive of curbs or the full width of the curb ramp or direction of pedestrian travel across detectable warning surfaces in the Provide a minimum 2 foot width of INSTALL STORZ FITTINGS ON ALL HYDRANT ASSEMBLIES.4. BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.0886\Cadd\SP09_1150886_DTL.DGN1/28/20164:14:13 PMSnyder1:9.99998pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.0886 115.088610 10EDCEDCJWM11-18-15COVE AT KETTLESTONE APARTMENTS1REVISED AS PER CITY COMMENTS12/23/15JWM2REVISED AS PER CITY COMMENTS01/28/16JWM BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.0886\Cadd\SP10_1150886_DTL.DGN1/28/20164:14:19 PMSnyder1:9.99998pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.0886 115.088610 10EDCEDCJWM11-18-15COVE AT KETTLESTONE APARTMENTS1REVISED AS PER CITY COMMENTS12/23/15JWM2REVISED AS PER CITY COMMENTS01/28/16JWM9 14 2226161422 99 98 9 8 1314 12 8 18 GARAGE 13 GARAGECLUBHOUSEOFFICE M AINT 10887 16161610 13999 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS 23 TWO BEDROOM 49 ONE BEDROOM 72 UNITS FFE=1056.00 FFE=1056.50 FFE=1056.00 FFE=1055.50 FFE=1053.60 FFE=1053.10 FFE=1053.4 FFE=1053.4FFE=1054.20FFE=1054.00 FFE=1053.60 POOL 22 8 CLUBHOUSEFFE=1053.47 23 TWO BEDROOM49 ONE BEDROOM72 UNITS SIDEWALK RAMP AREA 1 DETAIL 1"=10'SIDEWALK RAMP AREA 2 DETAIL 1"=10'SIDEWALK RAMP AREA 3 DETAIL 1"=10' SIDEWALK RAMP AREA 4 DETAIL 1"=10' SIDEWALK RAMP AREA 5 DETAIL 1"=10' SIDEWALK RAMP AREA 6 DETAIL 1"=10'SIDEWALK RAMP AREA 7 DETAIL 1"=10' SIDEWALK RAMP AREA 8 DETAIL 1"=10' SIDEWALK RAMP AREA 9 DETAIL 1"=10' RAMP AREA 1RAMP AREA 2 RAMP AREA 3 RAMP AREA 4 RAMP AREA 5 RAMP AREA 6 RAMP AREA 7 RAMP AREA 8 RAMP AREA 9 X X X XX X X X X XX X X X X X X X X X X X X X X X X X X X X X X XXX X X X X X X X X X X X X XXXX XX X X XX X X X XX X X XX X X X X X X X X X X XX XX XX X X X X X X X X X X X X X X X X X X X X X X X X X X X XXX X X XX XX X X X X X X X X X X X X X X X 10 1010'1053.15 1052.65 1052.55 1052.55 1055.50 1055.00 1055.00 1055.50 1056.00 1055.50 1055.50 1056.00 1055.40 1055.40 1055.60 1055.70 1055.49 1055.49 1055.40 1055.40 1055.40G1055.90TC 1055.40G1055.90TC 1054.90 1054.90G1055.40TC 1054.90 1054.90G1055.40TC 1054.90 1054.90 1055.50 1055.00 1055.00 1055.50 1055.00 1055.00 1054.90 1054.90 1054.78 1054.78 1054.69 1054.69 1054.50 1054.50 1055.00 1055.00 1054.40 1054.40 1055.50 1055.35 1055.35 1054.90G1055.40TC 1054.90G1055.40TC X XX X 1054.40G1054.90TC 1054.40G1054.90TC XX X 1054.95 1054.95 1054.85 1054.85 1054.00 1054.00 1054.10 1054.10 1053.61G 1053.49G 1054.81G 1054.49G XX X X 1054.40 1054.40 1054.11G 1053.98G 1054.30 1054.30 1053.90 1053.90 1053.80 1053.80 1053.35G 1053.52G XX XX X X 1052.91G 1052.65G 1053.00 1053.101053.18 1053.08 1053.60 1053.50 1053.50 1051.88G 1051.98 1052.55 1052.50 1051.94 1052.60 X XX 1052.45TC 1051.84G1052.34TC X XX X X X 1053.10 1052.95 1052.95 1052.55 1052.55 1052.55 1052.05 1052.05 1052.55 1051.951051.95 1052.55 1052.55 1053.05 1053.05 1053.05 1052.45 1052.45 1052.45TC 1051.95G1052.45TC 1051.95G1052.45TC 1052.95TC X X X X 1052.55 1052.45G1052.95TC 1052.45G1052.95TC X X1054.84 1049.00 1048.89 X X XX 1055.40TC 1055.90TC 1055.70 1055.80XX 1052.65 1053.15 1053.15 X 1053.40 1053.15 1.5%1.5%5.5%5.5%6.25%6.25%1.66%1.66%1.66%1.66%1.66%6.25%6.25%6.25%6.25%6.25%6.25%6.25%6.25% 1.5%7.4% 1052.45TC 7.12%1053.57G 1053.53G 1.67%1.67%1054.70G 1054.60G 4.70%4.60%6.90%1.67%1054.01G 1054.06G5.70%1.67%5.50%1053.47G 1053.41G 1.25%1052.75G 1052.81G1.33%4.15%X 1052.50TC 6.25%6.25%1.66%6.25%1.66%6.25%1054.94 1054.84 1054.72 1054.801054.92 1055.02 1054.80G 1054.90G 1054.81 1055.65G 1055.55G 1056.051056.17 1056.09 1055.971056.33 1056.41 X X 1049.25 1049.15 1049.00 1049.10 1049.02 1048.87X X 1048.61G 1048.76G X X 1049.15G 1049.00G 1049.75 1049.60 1049.75 1049.00 1049.99 1049.84 4.9 %1.5 0 %SIDEWALK RAMP DETAILS1054.36G1054.47G X X X1055.85 1055.85 1056.00 1054.90G 1055.00G XX X X X X 1054.70 1054.20 1055.40TC 1054.90TC 1055.201054.70 XX1052.25 1051.75 6.0' 6.0' 6.0' 6.0' 6.0' 6.0' 6.0'5.0' 5.0' 6.0'6.0'6.0'6.0'6.0'6.0'6.0'6.0'6.0'5.0'5.0'5.0'5.2 %6.0 %1.5% 4.2 %1.5% 1.0 %1.5%6 .5% 5 .9% 1.8% 2.2%1.5%10.0' 10.0' XX1053.00 1053.00 X XX1053.15 1052.55 1052.55 X X X1053.15 1053.15 X X 1053.40 1053.40 5.0'5 . 0' 1052.55G1053.05TC P.O. Box 159 HUXLEY, IA 50124p: 515.597.5457f: 515.597.5461WWW.JCORP.BIZCorp, incJ2016 / 01 / 25Kettlestone MultifamilyApartment ElevationsSCALE: 3/64" = 1'-0"4WEST ELEVATIONSCALE: 3/64" = 1'-0"3EAST ELEVATIONSCALE: 3/64" = 1'-0"2NORTH ELEVATIONSCALE: 3/64" = 1'-0"1SOUTH ELEVATION P.O. Box 159 HUXLEY, IA 50124p: 515.597.5457f: 515.597.5461WWW.JCORP.BIZCorp, incJ2016 / 01 / 27Kettlestone MultifamilyClubhouse ElevationsSCALE: 3/32" = 1'-0"3WEST ELEVATIONSCALE: 3/32" = 1'-0"4EAST ELEVATIONSCALE: 3/32" = 1'-0"1NORTH ELEVATIONSCALE: 3/32" = 1'-0"2SOUTH ELEVATION 612P.O. Box 159 HUXLEY, IA 50124p: 515.597.5457f: 515.597.5461WWW.JCORP.BIZCorp, incJ2016 / 01 / 25Kettlestone MultifamilyGarage & DumpsterSCALE: 3/32" = 1'-0"3NORTH ELEVATIONSCALE: 3/32" = 1'-0"4SOUTH ELEVATIONSCALE: 3/32" = 1'-0"1EAST ELEVATIONSCALE: 3/32" = 1'-0"2WEST ELEVATIONSCALE: 3/32" = 1'-0"5BACK ELEVATIONSCALE: 3/32" = 1'-0"7FRONT ELEVATIONSCALE: 3/32" = 1'-0"6SIDE ELEVATIONSCALE: 3/32" = 1'-0"8SIDE ELEVATION 412P.O. Box 159 HUXLEY, IA 50124p: 515.597.5457f: 515.597.5461WWW.JCORP.BIZCorp, incJ2016 / 01 / 25Kettlestone MultifamilyGarage ElevationsSCALE: 3/32" = 1'-0"3WEST ELEVATIONSCALE: 3/32" = 1'-0"4EAST ELEVATIONSCALE: 3/32" = 1'-0"1SOUTH ELEVATIONSCALE: 3/32" = 1'-0"2NORTH ELEVATION P.O. Box 159 HUXLEY, IA 50124p: 515.597.5457f: 515.597.5461WWW.JCORP.BIZCorp, incJ2016 / 01 / 25Kettlestone MultifamilyMonument ElevationsSCALE: 1/2" = 1'-0"1SIDE ELEVATIONSCALE: 1/2" = 1'-0"2FRONT/BACK ELEVATION P.O. Box 159 HUXLEY, IA 50124p: 515.597.5457f: 515.597.5461WWW.JCORP.BIZCorp, incJ2016 / 01 / 27Kettlestone MultifamilyClubhouse #3 3D P.O. Box 159 HUXLEY, IA 50124p: 515.597.5457f: 515.597.5461WWW.JCORP.BIZCorp, incJ2016 / 01 / 27Kettlestone MultifamilyClubhouse ElevationsSCALE: 3/32" = 1'-0"3WEST ELEVATIONSCALE: 3/32" = 1'-0"4EAST ELEVATIONSCALE: 3/32" = 1'-0"1NORTH ELEVATIONSCALE: 3/32" = 1'-0"2SOUTH ELEVATION 111 SFKITCHEN237 SFCONFERENCE945 SFLOBBY1203 SFOFFICE1736 SFSTORAGE800 SFPOOL20'-6 1/2"40'-0"15'-0"40'-5 1/2"100 SFPOOL EQUIP81 SFFAMILY RR120 SFOFFICE120 SFOFFICE130 SFWRR130 SFMRR35 SFMECHP.O. Box 159 HUXLEY, IA 50124p: 515.597.5457f: 515.597.5461WWW.JCORP.BIZCorp, incJ2016 / 01 / 27Kettlestone MultifamilyClubhouse #3 Plan