Loading...
HomeMy WebLinkAbout2016-04-18-J01J GPP Gas Main Extension - Accept Improvements RESOLUTION 16- RESOLUTION ACCEPTING THE 2015 GRAND PRAIRIE PARKWAY GAS MAIN EXTENSION WHEREAS, on the 10th day of August, 2015, the Mayor and Clerk of the City of Waukee, Iowa, entered into a construction contract with Profile Contracting of LeClaire, IA, for the construction of certain public improvements generally described as the 2015 Grand Prairie Parkway Gas Main Extension; and WHEREAS, the contractor has fully completed the construction of the public improvements in accordance with the terms and conditions of the contract and plans and specifications, as shown by the certificate of the Engineer filed with the Clerk on ____________________, 2015: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, IOWA: Section 1. That the report of the Engineer be and the same is hereby approved and adopted, and the public improvements are hereby approved and accepted as having been fully completed in accordance with the plans, specifications and form of contract and the total final construction cost thereof is hereby determined to be $__________, as shown in the report of the Engineer. PASSED AND APPROVED this 18th day of April, 2016. Mayor ATTEST: City Clerk Utility Safety & Design, Inc. 28847 US Highway 136 Unionville, MO 63565 P (660) 947-3316 F (660) 947-3146 SHELBYVILLE, KENTUCKY PO Box 727 Shelbyville, KY 40066 Office/Fax (502) 513-5127 BELLEVILLE, ILLINOIS 9 Executive Woods Court, Suite 1 Belleville, IL 62226-2016 P (618) 277-1520 F (618) 277-1586 OLNEY, ILLINOIS 1927 Miller Drive Olney, IL 62450 P (618) 392-5502 F (618) 392-2261 April 15, 2016    Mr. Tim Royer, Assistant Dir. of Public Works  City of Waukee  805 University Avenue  Waukee, IA 50263  troyer@waukee.org    RE:  2015 Grand Prairie Parkway Gas Main Extension Project – Acceptance of Public Improvement    Dear Mr. Royer,    USDI with this letter hereby recommends that the City of Waukee accept the above referenced project.   This improvement included the installation of approximately 21,855 lineal feet of new 4” gas main and  6,995 lineal feet of 6” gas main along the new Grand Prairie Parkway corridor.  The contractor  performing the work was Profile Contracting, LLC.        Respectfully Submitted,    Anthony Everette, P.E.  Vice‐President Engineering  USDI      Attach: none