AGENDA ITEM: Consideration of approval of Partial Payment Estimate No. 3 to TK Concrete,
Inc. for the Centennial Park Creek Slope Stabilization Project in the amount of
$137,675.85
FORMAT: Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Partial Payment No. 3 is for all work completed from
January 1, 2016 to March 31, 2016.
FISCAL IMPACT INCLUDING COSTBENEFIT ANALYSIS: $I37,675.85
COMMISSIONBOARD/COMMITTEE COMMENT: TK Concrete, Inc. has requested
Payment Estimate No. 3 for the work completed on the Centennial Park Creek
Slope Stabilization project in the amount of $137,675.85. Foth Infrastructure
and Environment, LLC has reviewed the payment estimate and recommends
payment.
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve Partial Payment No, 3
ATTACHMENTS: I. Partial Payment No. 3
I1. Letter of Recommendation
PREPARED BY: Beth Richardson
1
REVIEWED BY: John Gibson
PUBLIC NOTICE INFORMATION —
NAME OF PUBLICATION:
DATE OF PUBLICATION:
*lsvoor
Fot h
April 13, 2016
John Gibson
Director of Public Works
805 University Avenue
Waukee, IA 50263
RE: Pay Request #3
Centennial Park Creek Slope Stabilization
Dear Mr. Gibson:
Attached please find a detailed Pay Request for City Council approval on April 18, 2016.
Submitted Quantity
• 0.50 LS of Item 1.1, Mobilization
• 0.10 LS of Item 2.1, Clearing & Grubbing
• 500 CY of Item 2.2, Topsoil, Stripping, Salvaging & Spreading
• 2,500 CY of Item 2.3, Excavation, Class 10, Channel
• 0.40 LS of Item 8.1, Traffic Control
• 0.40 LS of Item 9.8, S WPPP Management
• 640.03 TON of Item 9.12, Revetment, Class E
We have reviewed the submitted quantities and they appear to be in order with what has been constructed
in the field. If City Staff concurs with this payment, we recommend the City of Waukee pay TK Concrete
Inc., of Pella, Iowa in the amount of $137,675.85 for the work completed to date.
Please let me know if you have any questions or need additional information.
Sincerely,
Foth Infrastructure and Environment, LLC
Joshua C. DeBower, P.E.
Lead Civil Engineer
Encl: Pay Request #3 dated 4/13/16
8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254.1393 Fax: (515) 254-1642
Department of Public Works
805 University Avenue
Waukee, IA 50263
Waukee
(515) 978-7920 Ph.
(515) 987-3979 Fax
w.maw n+a
Contractor: TK Concrete, Inc.
1608 FlBeld Road
Pella, IA 50219
PAY REQUEST 3
Project Title
Centennial
peek Sb eS IsIrllon
Waukee
Protest
Project File No.
14WO.a,
Number
Purchase Order
Number
One. Contract
Amount 8 Date
f300,875.00 ]AI2ot5
Notice to Proceed
Data
7m2015
Estimated
Completion Date
y2>n01s
Pay Pared
ifluoi8 to 31314SIO
Pay Request
Number
3
Data
4n314m6
Contract IS
BID ITEMS
Item
No.
Item
Coda
Description
Unit
Eat.
Oty.
Unit
Price
Extended
Pdce
Quantity
Completed
Value
Completed
DIVISION 1 -GENERAL
11 1090'A-MOO MOBILRATION LS 1 $60,00000 $6000000 100 1 $611,00000
DIVISION 2 - EARTHWORK, SUBGRADE AND SUBBASE
2A
2010-A-1000
CLEARING&GRUBBING
I LS
1 1
1 $20.000,00
E20.000.00
t00
$20.00000
22
TREE REMOVAL
I EA
1 17
1 S750.00
$12750.00
3200
$24,000'
23
TOPSOIL STRIPPING. SALVAGING& SPREADING
CY
SW
$2250
$11,25000
50000
$11,250DO
2.4
2010E-1040
EXCAVATION. CLASS IO. CHANNEL
CY
2,500
$2250
$5.5000
26M 00
$56,SAO 00
DIVISION 3 -TRENCH AND TRENCHLESS CONSTRUCTION
3A NOTUSED
DIVISION 4 - SEWERS AND DRAINS
41 1 FIELD TILE, PVC, UNSPECIFIED DIA LF 1 100 1 $3000 $300000SO GO
DIVISION 5 - WATER MAIN AND APPURTENANCES
5.1 1 NOT USED
DIVISION 6 - STRUCTURES FOR SANITARY AND STORM SEWER
6.1 1 NOT USED
DIVISION 7 - STREETS 5 RELATED WORK
7.1 1 NOT USED
DIVISION 8 -TRAFFIC SIGNALS AND TRAFFIC CONTROL
—CONTROL
81 6 C1 G, 0 TRAFFIC LS 1 S3.75000S3.75D.00 -0 $3.375,00
DIVISION 9 - SITEWORK AND LANDSCAPING
91
HYDRAULIC SEED., FERT., MULCH., CHANNEL BUFFER MIX
AC
2
$],]50.00
$1a72500
000
$0.00
92
HYDRAULIC SEED., PERT. MULCH., TYPE 2(PERM COOL SEASON MIX, SLOPES 9 ORCHES)
AC
1
$4.950.00
$4,950.00
000
$000
9.3
HYDRAULIC SEED- FERT.. MULCH., TYPE 4(URBAN TEMPI
AO
3
$2.25000
$6.75000
000
$000
94
PLANT,TREE, SHELLBARK HICKORY(CARYA LACINIOSA)
EA
8
$1.500.00
$12.00000
0.0
$000
95
PLANT, TREE, AMERICANSYCAMORE (PLATANUS OCCIDENTAHS)
EA
8
$1.500.BE
$12,00000
ON
MOO
96
PLANT.TREE, SWAMP WHITE OAK(OUERCUS BICOLOR)
EA
8
$75000
$6,OOO 00
O.DO
$000
97
PLANT, TREE, COMMON HACKBERRY(CELTIS OCCIDENTALIS)
EA
6
$1.100 GO
$6.600.00
BOB
$000
9.8
9040-1,2000
STORMWATER POLLUTION PREVENTION PtAN(SWPPP), MANAGEMENT
LS
1
$5.800 SO
Madcap
090
$5,220W
99
Fru"Ft000
SILT FENCE, INSTALLATION
LF
Tow
$350
$3,5W 00
000
$000
910
SILT FENCE, REMOVAL
LF
1.000
S200
$200000
000
sox)
B11
9040-D-TOX
ERASION COMROL MULCHING, CONVENTIONAL MULCHING
AC
3
f185000
E5,55000
000
E000
an?
REVETMENT. CLASS E RIPRAP
TON
750
$65W
$48,75000
640.03
$41,60195
913
REOP TYPE 3B
SY
500
$4.00
8200000
BOB
EOW
9,14
CONSERVATKIN EASEMENT SIGN
EA
13
$250 SO
$3,25000
Ono
$Q.
TOTAL
$300.875.00
$221,696.95
Pen,W16-011.1 Lenpnnlal Pa6,Sbaam Mltlevtlon.ffim
�n..mnt�.,aw�rr,�rvnam�ea�ac.m..va.na.. um.a.x. Page 1 of 2
MATERIALS STORED SUMMARY
Description
10 U.I.
Unit Pride
Extended! Coat
Item 9.14- Conaemllon Easement Sign
13
E50.00
$650.00
TOTAL
se50.00
PAY REQUEST SUMMARY
Total Approved
Total Complatetl
Craved Pram
$300,87500
E221696.as
APMowo Ohange Order 1
$0.0
AppmveE Change Order
$0.00
Approvetl Change ONer 3
$000
Rachel Can'ad Pone
$300,876 00
$221696.95
Materfal55toeed
$65000
Retarms, 50%
511.117,35
Total Earned Lear Raping¢
$21122960
Total PreNoualy Appmvetl(far each)
Pay Request
E46,046.50
Pay Reduced
$27.507.25
Pay Requed3
Pay Requeat4
Pay Requests
Pay Reque518
Pay RequestT
Pay Requen6
Pay Rsmash 9
Pay Reduced 10
Total Prenoudy AppmvM
E73,55315
Amount Dm This attempt
$IV,6I5.85
Percent Complete
737%
Percent of Contract Peace Wagner (in Calendar Data Based on Notes to Proceed Dale B Contend Completion Date)
856%
The amount $137675,11 "recommended for app real for payment in accordance
xM Me teems of the Contract
CenmoaeT.
TRCeneane lne.10011 FMMld ReadPo1a P 6021
Room mdndad as,
FedF befrol.sausev.
cha obd By:
WouMeo
Screarldes,:
9c-laaename,
s' nWun.
lr e'.
Name.
lishers.
Mid:
Trailer'
This
Dam- -
Dilo:
Dal.,
PRm3p1am13C.Mmnitl Para aMm mia9.nm.nvm
=bsom+w—anewmmeanacn.on-roa accearwn Page 2of2