Loading...
HomeMy WebLinkAbout2016-04-18-J08 Shops at Kettlestone North_Preliminary Plat AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: April 18, 2016 AGENDA ITEM: Consideration of approval of a resolution approving Preliminary Plat for The Shops at Kettlestone North FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The applicant, ARAC, LLC, requests approval of a preliminary plat for The Shops at Kettlestone North which is approximately 83 acres in area located and the east and west sides of Grand Prairie Parkway and north of Ashworth Road. A total of 16 lots are proposed for office and commercial/retail development. Lots 1-13 and Lot 16 are intended for commercial/retail development. Lots 14 and 15 are intended for office development. Two lots along the north plat boundary will be platted as outlots for future development. As part of the plat improvements the developer will be required to extend streets and utilities throughout the plat. SE Esker Ridge Drive, SE Parkview Crossing Drive, and SE Tallgrass Lane will all be extended throughout this plat over the course of the phases of development. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the preliminary plat at their meeting on April 12, 2016 and recommended approval subject to remaining staff comments: Motion to approve a preliminary plat for The Shops at Kettlestone North Senior City Planner Andy Kass introduced the applicant, Arac llc, who is requesting the approval of a preliminary plat for the 83 acres located to the East and West of Grand Prairie Parkway. Mr.Kass recollected the Recent Commission recommendation for the rezoning of the area from A-1 and PD/C-4 to K-RC (Kettlestone Retail Community District) and K-OF ( Kettlestone Office District). The City Council has approved the first and second reading of the request with the third and final reading slotted for the next regularly scheduled Council meeting. Mr. Kass explained that the preliminary plat includes 16 lots and 2 out lots. Lots 1-13 and 16 are intended for commercial/retail development and Lots 14 and 16 are intended for office development. All proposed lots are in conformance with the Kettlestone specific zoning districts. Mr. Kass described that a number of streets will be extended throughout the plat from adjacent subdivisions. SE Esker Ridge Drive will be extended from the west plat boundary to Grand Prairie Parkway and across to the east plat boundary. SE Parkview Crossing Drive will be extended from the north down to Ashworth Road. SE Tallgrass Lane will be extended from the west plat boundary to Grand Prairie Parkway. All streets are collector streets with pavement widths of 29 feet and 31 feet. Street trees will be provided along all streets. Five foot wide sidewalks will be constructed on both sides of all streets. An existing 10 foot wide trail is located on the east and west sides of Grand Prairie Parkway. Mr. Kass advised that several easements are proposed within the plat based upon the location of proposed utilities. In addition, to easements for utilities the preliminary plat identifies proposed ingress/egress easements to provide access to the proposed lots. A 25 foot landscape buffer easement will be required along the west plat boundary to provide screening from the adjacent residential development. Mr. Kass explained that utilities will be extended to all lots. All utilities within the plat are proposed to be public. Lots on the east side of Grand Prairie Parkway will utilize the existing 24- inch sanitary sewer. The remaining lots will provided with sanitary sewer that will be extended by the applicant. Storm water in this plat will be detained in the existing regional detention pond that was constructed by the City of Waukee located on the northeast side of the site. Additional detention will be constructed as part of the plat improvements in the southwest corner of the site. This pond will not be owned and maintained by the City, but rather by an association for the development. • Commissioner Schmidt asked for a description of improvements done to Ashworth provided with this project. Senior Planner Andy Kass advised that there would not be any significant improvements. A turn lane will be provided. Director of Development Services Brad Deets added that no one had identified when Ashworth Road will be seeing improvements, as there are some other street maintenance that is taking up the budget at the moment. The developers will be required to sign a waiver and petition to provide benefits and assessments and will have to pay their share when Ashworth Road is widened by the City. • In response to Commissioner Schmidt’s question regarding the size of the pond on lot 16, Developer Chris Thompson, a representative of the applicant, advised that the pond is no more than 3 acres in size and is viewed as a wet bottomed, full retention pond. • Commissioner Nigro voiced a concern about the traffic of Ashworth Road, questioning what would be the limit before hitting capacity for the roads current size. Mr. Deets advised that it is in the capital improvements and will eventually be placed at the top of the list, however, budget and other major projects, such as Alice’s Road, are taking precedence at the current moment. He advised that West Des Moines is starting to widen their part of Ashworth and that the city is going to pick up the project for their own part, but that right now there is not a time frame for that particular project. • Commissioner Shanks verified that everything west to the Preliminary plan was zoned for a Single Family Residence. Mr. Kass advised that, for the most part, the area west of the proposal was all single family residence. Commissioner Shanks continued to question as to what would be the most likely access point used to enter Lot 16. Mr. Kass advised that Willowbrook Drive would be extended down through the Kettlestone Ridge Phase, a return would be placed for access. With it being visible from Ashworth, the visibility and access is something that has been acknowledged as a small hindrance. • Commissioner Streit questioned what was planned to be built on the rest of Lot 16. Mr. Kass advised that it would be some type of medium density but that at the moment it was resident occupied. • Commissioner Schmidt questioned if Grand Prairie Parkway would cross Ashworth and Mr. Kass advised that eventually the two would connect. With no other questions Commissioner Schmidt moved to approve the Preliminary Plat for The Shops at Kettlestone North subject to remaining staff comments and review of all legal documents by the City Attorney. Commissioner Streit seconded the motion. Ayes: Nigro, Streit, Broderick, Hoifeldt, Shanks, and Schmidt. Nays: none. Motion carried. STAFF REVIEW AND COMMENT: A majority of staff comments have been addressed and staff is confident that the remaining comments will be addressed prior to the Council meeting. Staff would recommend approval of the preliminary plat for The Shops at Kettlestone North subject to remaining staff comments. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Staff Comment Letter IV. Preliminary Plat PREPARED BY: Andy Kass, Senior Planner REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 16- APPROVING THE PRELIMINARY PLAT FOR THE SHOPS AT KETTLESTONE NORTH IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission reviewed and recommended approval, subject to remaining staff comments, of a Preliminary Plat for The Shops at Kettlestone North on April 12, 2016; AND, WHEREAS, the Preliminary Plat for The Shops at Kettlestone North is in general conformance with section §303 - Land Subdivision Ordinance of the Waukee Municipal Code. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this the 18th day of April, 2016, that the Preliminary Plat for The Shops at Kettlestone North be approved subject to remaining staff comments. ____________________________ William F. Peard, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk ROLL CALL VOTE AYE NAY ABSENT ABSTAIN Shane Blanchard Brian Harrison Shelly Hughes Larry R. Lyon Rick Peterson STAFF REPORT TO: Planning and Zoning Commission PREPARED BY: Andy Kass RE: The Shops at Kettlestone North – Preliminary Plat DATE: April 12, 2016 GENERAL INFORMATION: Applicant: ARAC, LLC Requested Action Preliminary Plat Approval Location and Size: Property is generally located north of Ashworth Road and on either side of Grand Prairie Parkway and contains approximately 83 acres. LAND USES AND ZONING: Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant - Undeveloped Community Retail/Office A-1/C-4(PD-1) North Vacant Med. Density Multi-Family Office A-1 South Vacant Regional Retail A-1 East Vacant Community Retail Office A-1 West Vacant Single Family Residential R-2 BACKGROUND: The subject property is located within the Kettlestone Corridor and includes approximately 75 acres located on the west side of Grand Prairie Parkway and approximately 8 acres located on the east side of Grand Prairie Parkway. All property is located north of Ashworth Road. The subject property is currently under consideration for rezoning by the City Council from A-1 and PD/C-4 to K-RC (Kettlestone Retail Community District) and K-OF (Kettlestone Office District). The Council has approved the first and second readings of the request. The third and final reading will be at the next regularly scheduled Council meeting. April 8, 2016 2 of 3 \ ABOVE: Aerial photo of proposed plat outlined in OORRAANNGGEE in relation to the surrounding properties Project Description: Lots: The preliminary plat includes 16 lots and 2 outlots. Lots 1-13 and 16 are intended for commercial/retail development and Lots 14 and 16 are intended for office development. The commercial/retail lots range in size from 1.92 acres to 14.63 acres. The lots intended for commercial development are 10.92 acres and 14.55 acres in area. All proposed lots are in conformance with the Kettlestone specific zoning districts. Streets: A number of streets will be extended throughout the plat from adjacent subdivisions. SE Esker Ridge Drive will be extended from the west plat boundary to Grand Prairie Parkway and across to the east plat boundary. SE Parkview Crossing Drive will be extended from the north down to Ashworth Road. SE Tallgrass Lane will be extended from the west plat boundary to Gran Prairie Parkway. All streets are collector streets with pavement widths of 29 feet and 31 feet. Street trees will be provided along all streets. Five foot wide sidewalks will be constructed on both sides of all streets. An existing 10 foot wide trail is located on the east and west sides of Grand Prairie Parkway. April 8, 2016 3 of 3 Easements: Several easements are proposed within the plat based upon the location of proposed utilities. In addition, to easements for utilities the preliminary plat identifies proposed ingress/egress easements to provide access to the proposed lots. A 25 foot landscape buffer easement will be required along the west plat boundary to provide screening from the adjacent residential development. Utilities: Utilities will be extended to all lots. All utilities within the plat are proposed to be public. Lots on the east side of Grand Prairie Parkway will utilize the existing 24-inch sanitary sewer. The remaining lots will provided with sanitary sewer that will be extended by the applicant. Storm water in this plat will be detained in the existing regional detention pond that was constructed by the City of Waukee located on the northeast side of the site. Additional detention will be constructed as part of the plat improvements in the southwest corner of the site. This pond will not be owned and maintained by the City, but rather by an association for the development. STAFF RECOMMENDATION At this time Staff feels comfortable with the proposal and would recommend approval of the Preliminary Plat for The Shops at Kettlestone North subject to remaining staff comments. CITY OF WAUKEE Andy Kass, AICP Senior Planner Development Services Department 230 W. Hickman Road Waukee, IA 50263 Phone: (515) 978-9533 Fax: (515) 987-1845 1st Review: March 1, 2016 2nd Review: March 31, 2016 3rd Review: April 12, 2016 4th Review: Cooper Crawford & Associates, LLC Attn: Brad Cooper 475 S. 50th street, Suite 800 West Des Moines, Iowa 50265 RE: The Shops at Kettlestone North – Preliminary Plat Dear Mr. Cooper: Per your request, staff has reviewed the proposed preliminary plat for The Shops at Kettlestone North. The property in question is located mostly west of Grand Prairie Parkway, with a portion located to the east of Grand Prairie Parkway, just north of Ashworth Road. Based upon our review, staff has the following comments related to the preliminary plat: COVER SHEET AND GENERAL COMMENTS 1. Provide IDNR Sanitary and Water Permit. Engineers Response: 2. Provide a note stating that a preconstruction meeting will be required with the City of Waukee Engineering Department prior to construction. Engineers Response: 3. Provide a geotechnical exploration report. Engineers Response: 4. Provide a hydrant coverage plan. Hydrant spacing is greater than 300 feet on SE Esker Ridge Drive and SE Parkview Crossing Drive on Sheets 3 and 4. Hydrant spacing is still greater than 300 feet in one location along SE Parkview Crossing Drive. Engineers Response: 5. Provide proposed road/ROW widths and pavement thickness. Engineers Response: 6. Provide pipe sizing for proposed utilities. Engineers Response: Project Name Project Engineer/Manager Project Type City Contact The Shops at Kettlestone North Brad Cooper Preliminary Plat Andy Kass 7. Verify valve spacing for water main meets 800’ 400’ requirement. Additional valves should be added at the west end of Ashworth Road and the south end of SE Parkview Crossing Drive to meet the 400 foot spacing. Engineers Response: 8. Provide locations of proposed pedestrian ramps and facilities. No curb ramps are shown. Sidewalk is shown through the trail at intersection of SE Tallgrass Lane and Grand Prairie Parkway. Curb ramps at intersection of SE Parkview Crossing Drive and Ashworth Road should cross SE Parkview Crossing Drive as well. Engineers Response: 9. Provide maintenance responsibility information for the detention basin. Add a note indicating who is responsible for the maintenance of the detention basin. Staff would suggest setting up an owners association to maintain the pond rather than putting the burden of pond maintenance on one property owner. Engineers Response: 10. Provide a deceleration lane on Ashworth for SE Parkview Crossing Drive. Extend 24-inch culvert accordingly with deceleration land grading. Engineers Response: 11. Staff questions if the Ashworth/SE Parkview Crossing Drive intersection will be a right in and right out only in the future. Engineers Response: 12. Staff questions if the Willowbrook/Esker Ridge intersection will be constructed southeast. Engineers Response: 13. Petition contract and waiver will be required for future improvements to Ashworth Road. Engineers Response: 14. Show bike trail on Grand Prairie Parkway. Please label the bike trail. Engineers Response: 15. Show services to all proposed lots. Show services on Lot 8. Show sanitary services on Lots 6, 7, and 8. Engineers Response: 16. Staff questions if there will be a turn lane on Parkview Crossing Drive. Staff suggests providing a left turn lane on SE Parkview Crossing drive at the intersection with Ashworth Road. This will prevent traffic from backing up on SE Parkview Crossing Drive at peak times. Please indicate the turn lane. Engineers Response: 17. Provide a note on the cover sheet stating which lots are to be zoned K-RC and which lots are to be zoned K-OF. Engineers Response: 18. Please revise setbacks to match the proposed zoning and indicate which set of setbacks belongs to which zoning district proposed. Engineers Response: 19. Please provide a note stating that construction shall be in accordance with City of Waukee Standard Specifications and 2016 SUDAS. Engineers Response: 20. Provide street trees along Grand Prairie Parkway and include a note for this on the cover sheet. Street trees along Grand Prairie Parkway can be removed as these will be part of a City project. Staff apologizes for the error. Note #9 on the cover sheet can be removed as well. Engineers Response: 21. Staff questions if the extension of Willowbrook Drive to the south is necessary. Engineers Response: 22. Provide property owner information for the properties located adjacent to the southeast portion of the proposed plat. Engineers Response: 23. Show the portion of the proposed plat to the east of Grand Prairie Parkway within the vicinity sketch. Engineers Response: 24. Staff questions what the offset property line on the east side of lots 2-4 are. Will this be access to lots 1-4? Also, staff questions how lots 5-8 will be accessed. Please address. Engineers Response: 25. Note #8 should reference CD baskets as well. Engineers Response: 26. Staff questions if the two property owners have coordinated the construction of the intersection of SE Esker Ridge Drive and SE Willowbrook Drive. Engineers Response: 27. A 25 foot wide landscape buffer should be provided along the west side of Lot 16. Buffer plantings should be provided as follows: 1.5 overstory, 2.5 evergreen, 2.5 ornamental, and 15 shrubs per 50 feet of lineal buffer. Please indicate the buffer area and the plantings. Engineers Response: SHEET 2 28. Staff questions if the property lines can be shaded darker to more easily distinguish. Engineers Response: 29. Please label lot 16 on sheet 2. Label was not added. Engineers Response: 30. Please label Grand Prairie Parkway on sheet 2. Engineers Response: 31. Provide easements (sanitary on east side of SE Parkview Crossing Drive, detention basin and storm sewer at northwest corner of Ashworth Road and SE Parkview Crossing Drive). Engineers Response: 32. Indicate and illustrate pond elevation information – normal and 100 year elevations. Please illustrate the normal pool elevation. Please illustrate the normal pool. The half tone line is the 100 year elevation. Engineers Response: 33. Show 100 year overflow path location. Provide additional arrows illustrating overflow path. Engineers Response: 34. It appears that a storm sewer outlet to the basin is very close to the basin outlet, consideration should be given to lengthen flow path to avoid short circuiting the system. Engineers Response: 35. Please verify that the information provided for Grand Prairie Parkway is correct, including utilities and contours. Engineers Response: 36. Verify sanitary stub along Ashworth, lot 2 with Foth for connection point. Engineers Response: 37. Provide water main along Ashworth (verify connection location with Foth). Extend watermain on Ashworth to both plat boundaries. Engineers Response: 38. Extend sanitary to the plat line on the east side of Grand Prairie Parkway. Engineers Response: 39. Show 24” storm sewer stub out of first intake on Grand Prairie Parkway north of Ashworth (verify with Foth plans). Engineers Response: 40. Provide a note stating that the existing septic system within lot 9 is to be completely removed. Engineers Response: 41. Identify proposed access points and ingress/egress easements. Staff would note that only 1 right- in right-out access point off of Grand Prairie Parkway will be allowed for Lots 1-4. Engineers Response: 42. Staff questions if the double 21” outlet pipes along Ashworth can be built as one. Please address. Engineers Response: 43. Label all streets shown on the sheet. Engineers Response: 44. Show services to all lots. Engineers Response: 45. Extend 16” water main along Ashworth Road. Engineers Response: 46. Show traffic signals and label on plan. Engineers Response: 47. Show street lighting and label on plan. Engineers Response: 48. Show trail on Grand Prairie Parkway and label on plan. Engineers Response: 49. Show PUE along Grand Prairie Parkway and label on plan. Engineers Response: 50. Staff questions how lots 1-8 will have access. Please address. Engineers Response: 51. Eliminate sanitary bore under Grand Prairie Parkway and utilize existing sanitary on east side of Grand Prairie Parkway. Engineers Response: 52. Staff suggests provided sanitary sewer for lots on the west side of Grand Prairie Parkway with a single sanitary line in an easement between the lot lines. Engineers Response: 53. The 20 foot sanitary sewer easement on the west side of Grand Prairie Parkway should not be located with the existing 15 foot PUE. Engineers Response: 54. Staff suggests running sanitary sewer on the backside of Lots 5-11. This will provide better access for maintenance and should eliminate the need for some pipe segments. Staff would note that installing the sanitary main at this location would affect buildable area on the site if the intent is to construct buildings close to the front property line. Staff also has concerns as to how access would be provided to the easement. Engineers Response: SHEET 3 55. Please label SE Parkview Crossing Drive on sheet 3. Engineers Response: 56. Staff questions if the storm sewer shown running through lot 16 follows the future extension of Willowbrook Drive. Staff questions if this can be rerouted. Please address. Engineers Response: 57. Label all streets shown on the sheet. Engineers Response: 58. ROW on SE Esker Ridge needs to be larger (70’) to accommodate 31’ and 37’ paving. SE Esker Ridge Drive is a 31’ b/b street typical section. The pavement should be widened at intersection with Grand Prairie Parkway to 37’ b/b pavement to accommodate left turn lanes. Please indicate the turn lane. Engineers Response: 59. SE Esker Ridge east of Grand Prairie Parkway needs to be installed as part of this plat. Engineers Response: 60. Staff questions if there will be an access road to serve lots 1-4. Engineers Response: 61. Provide easements (storm sewer through lot 3, sanitary along the east side of SE Parkview Crossing Drive, and storm sewer along the northern side of SE Esker Ridge Drive). Engineers Response: 62. Staff questions if the information provided for Grand Prairie Parkway is correct (utilities and contours). Staff also questions if the alignment for SE Esker Ridge Drive is correct as being installed. Engineers Response: 63. Provide a valve for the connection to existing water main at SE Esker Ridge Drive and Grand Prairie Parkway. Staff questions if a stub is in place. Use stub installed on north side of SE Esker Ridge Drive. Engineers Response: 64. Move storm to south side with sanitary. Engineers Response: 65. Intakes should be added at the SE Willowbrook Drive/SE Esker Ridge Drive intersection. Provide an outlet for these intakes and an easement if necessary. Engineers Response: 66. The water main on the backside of Lots 1-4 will need to be looped per Waukee Standard Specifications. Engineers Response: SHEET 4 67. Please note that the City of Waukee Standard Specifications requires a maximum of 400’ spacing between intakes. Please revise plans to comply with this requirement. Engineers Response: 68. Provide sanitary service for lots 1 & 4. Sanitary services should be provided off of manholes. Manholes were oversized to allow for inside drop connections. Please revise. The 24-inch sanitary sewer along Grand Prairie Parkway is over 20 feet deep in some areas. The manholes for the sewer were oversized to allow for internal drop connections. The intention is to have all sewer services connect to a shallower main that would ten drop into the oversized manholes to avoid excavating great depths near the road and connecting services to a 24-inch sanitary main. The City will require that services be provided off of the manholes. Engineers Response: 69. Please provide intakes for SE Parkview Crossing Drive near the SE Esker Ridge Drive intersection. Engineers Response: 70. Provide a storm sewer easement for storm sewer outlet near existing pond in lot 1. Engineers Response: SHEET 5 71. Staff questions if intakes are required to prevent erosion on north end of Parkview Crossing Drive. Engineers Response: 72. Provide the 100 year elevations and normal pool for the pond located at the southwest corner of Grand Prairie Parkway and SE Tallgrass Lane. Please illustrate these features. Please illustrate the normal pool. The half tone line is the 100 year elevation. Engineers Response: 73. Staff questions if the double 54” outlet pipes along SE Tallgrass Lane can be built as one. Please address. Engineers Response: 74. Provide easements for the storm sewer outlet on the north side of SE Tallgrass Lane. Engineers Response: 75. Staff questions what Outlot Y and Outlot Z are to be used for. Engineers Response: 76. Staff questions why the storm sewer in lot 1 is being outletted so far from the existing pond. Engineers Response: 77. Provide water main valve location for proposed main north of SE Esker Ridge Drive. Engineers Response: 78. Staff questions how water main will be looped north of SE Esker Ridge Drive. Is there a plan for the area to the north? Engineers Response: 79. Sanitary is already stubbed east, just short of proposed twin 54” culverts on the south side of Tallgrass. Move sanitary and storm to south side and water to north side. Engineers Response: 80. Run storm outlets into 54” RCP instead of separate outlets into pond. Engineers Response: 81. Street trees should be provided for on SE Tallgrass Lane. Engineers Response: 82. Staff questions why the sanitary is being stubbed to the adjacent property to the north off of SE Tallgrass Lane. Engineers Response: VEENSTRA AND KIMM COMMENTS 83. Sheet 1: Extend vicinity sketch to the east side of Grand Prairie Parkway. Engineers Response: 84. Sheet 1: Show owners of parcels east of Lots 1-3 and south of Lot 1. Engineers Response: 85. Sheet 1: Show adjacent property classifications. Engineers Response: 86. Sheet 2: Show 100-year flood limits of pond. Engineers Response: 87. Sheet 2: Show detention easement for pond. Engineers Response: 88. Sheet 2: Show existing water main size on Ashworth Road. Engineers Response: 89. Sheet 2: Show existing easements for sanitary sewer and storm sewer on lot 16. Engineers Response: 90. Sheets 2-5: Show locations of sidewalks and trails. Engineers Response: 91. Sheets 2-5: Show width of Grand Prairie Parkway and Ashworth Road. Engineers Response: 92. Sheets 2-5: Show existing storm sewer and water main size on Grand Prairie Parkway. Engineers Response: 93. Sheets 2-5: Show existing 24” sanitary sewer easement on Grand Prairie Parkway. Engineers Response: 94. Sheets 2-5: Show water main size. Engineers Response: 95. Sheets 3 and 4: Show storm sewer size on SE Esker Ridge Drive. Engineers Response: 96. Sheets 4 and 5: Show storm sewer size on SE Parkview Crossing Drive. Engineers Response: 97. Sheet 5: Show existing drainage easement on ARAC property. Engineers Response: 98. Sheet 5: Show easements for sanitary sewer and storm sewer on ARAC property. Show the sanitary sewer service stub size and easement if public. Engineers Response: 99. Sheet 5: Show sanitary sewer easement on Outlot Z. Engineers Response: 100. Submit soil analysis report. Engineers Response: 101. Show water main easement at northwest and northeast corners of intersection of SE Esker Ridge Drive and Grand Prairie Parkway. Correct overlapping text at these locations as well as duplicate 20 water main easement label on the east side of Lot 4. Engineers Response: MISCELLANEOUS 102. Provide a copy of the Construction Site SWPPP Review Checklist signed by the SWPP designer. Engineers Response: 103. Provide a copy of the SWPPP Prepared for obtaining General Permit #2 coverage. Engineers Response: 104. Provide a copy of the IDNR issued General Permit #2 authorization letter. Engineers Response: 105. Complete COSESCO application and submit with $65 fee for the first required quarterly COSESCO inspection. Engineers Response: 106. The applicant will be required to provide the following as a part of the completion of the public improvements prior to approval of a final plat: a. Post Construction What practices considered for this site? i. Provide a site plan specific to the storm water management facilities of the property indicating the permanent measures utilized by the designer and requirements for maintenance of said facilities. ii. A maintenance covenant will need to be created and provided for review. b. As-built plans of all storm water management facilities on site and a certification statement signed by SWPPP designer indicating that facilities were constructed as designed will be required. Engineers Response: 107. Provide finished grade spot elevations at all locations where an overland flowage easement crosses a property line, including locations where said easements run to the street. Engineers Response: 108. Staff would request that the revised plans and comment response letter be provided in digital form (PDF) and hard copies with 5 full-sized hard copies delievered to Waukee City Hall. The PDF copy should be emailed. One additional hard copy set should be delivered directly to Veenstra and Kimm to the attention of Jordan Kappos. Staff intends to forward this request to the April 18th City Council meeting. Please submit revisions in PDF format no later than 4 PM on Monday, April 18th. Should you have any questions or concerns regarding these comments, please feel free to contact Brad Deets (515-978-7899), Melissa DeBoer (515-978-7898) or myself at (515) 978-7897. Sincerely, Andy Kass, AICP Senior Planner