Loading...
HomeMy WebLinkAbout2016-05-02-J01zAA I80 Interchange Contract Mod 201 O Waukee • f ■V1 THE KEY TO GOOD LIVING AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 2, 2016 AGENDA ITEM: Consideration of approval of a Contract Modification No. 20 to the Iowa Department of Transportation for the 1051h Street/Alice's Road I-80 Interchange Project with a decrease in the contract of $168,411.70. FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Short Description Decrease Items, Increase Items Description of Changes NON SUBSTANTIAL Decrease: 0120 Subgrade Stabilization Material, Crushed Stone Decrease: 0170 Paved Shoulder, NMA, 8" Decrease. 01810 Shoulder Finishing, Earth Decrease: 0210 STDIS-F PCC Pavement, CL. C CL 3, 10" Decrease: 0390 Apron, Concrete 15" Decrease: 1010 Special Compaction of SubgradelRec Trail Increase: 0020 Special Backfill Increase_ 0100 Subgrade Stabilization Material, Polymer Grid Increase: 0150 Paved Shoulder, PCC 7° Increase: 0160 Paved Shoulder, PCC 11.5" Increase: 0220 STD/S-F PCC Pavement, CI_ C CL 3, 11.5" Increase: 0410 Apron, Concrete 24" Increase. 1140 removal of Fence, Chain Link FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: Decrease contract amount by $168,411.70 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Contract Modification No. 20 to the Iowa Department of Transportation for the 105Lh Street/Alice's Road I-80 Interchange Project with a net decrease in the contract of $168,411.70. ATTACHMENTS: I. Contract Modification 20 PREPARED BY: Beth Richardson REVIEWED BY: John Gibson PUBLIC NOTICE INFORMATION — NAME OF PUBLICATION: DATE OF PUBLICATION: C4 Iowa Department of Transportation Contract Modification 3/16/2016 1:37 PM FieldManager 5.0a Contract: 25-0803-175, PCC PAVEMENT - GRADE AND NEW Cont. Mod. Number 20 Revision ber Cont. Mod. Date 3/16/2016 Net Change $-168,411.70 Awarded Contract Amount $13,423,922.46 Route Entered By HWY 1-80 (C31912) Jennifer Strunk Contract Location DALLAS IMN-080-3(175)119--0E-25 Short Description Decrease Items, Increase Items Description of Changes NON SUBSTANTIAL Decrease: 0120 Subgrade Stabilization Material, Crushed Stone Decrease: 0170 Paved Shoulder, HMA, 8" Decrease: 0180 Shoulder Finishing, Earth Decrease: 0210 STD/S-F PCC Pavement, CL C CL 3, 10" Decrease:0390 Apron, Concrete 15" Decrease: 1010 Special Compaction of Subgrade/Rec Trail Increase: 0020 Special Backfill Increase: 0130 Subgrade Stabilization Material, Polymer Grid Increase: 0150 Paved Shoulder, PCC 7" Increase: 0160 Paved Shoulder, PCC 11.5" Increase: 0220 STD/S-F PCC Pavement, CL C CL 3, 11.5" Increase: 0410 Apron, Concrete 24" Increase: 1140 Removal of Fence, Chain Link Increases / Decreases Project: 25-0803-175, 140819 009 NTF WAIT Category: 0001, N:ROADWAY ITEMS Item Description Item Code Prop.Ln. Item Type Unit Quantity Chg. Unit Price Dollar Value SPECIAL BACKFILL 2102-0425071 0020 ORIGINAL CY 1,114.916 36.80000 $412028.91 Reason: Contract Items are Plan Quantity by Specification and are increased to reflect actual measurements in the field. SUBGRADE STABIL MAT'L, 2113-0001000 0120 ORIGINAL SY-1,677,407 31.30000 $-52,502.84 CRUSHED STONE Reason: Items are decreased due to the elimination of work located on the south end of Grand Prairie Parkway. SUBGRADE STABIL MAT'L, POLYMER GRID 2113-0001100 0130 ORIGINAL SY 6,182.966 1.85000 $11,438.49 Reason: Contract Items are Plan Quantity by Specification and are increased to reflect actual measurements in the field. Contract: 25-0803-175 Cont. Mod.: 20 Page 1 of 3 �� Contract Modification 3/16/2016 1:37 PM Iowa Department of Transportation Field Manager 5oa Increases / Decreases Project: 25-0803-175, 140819 009 NTF WAIT Category: 0001, N:ROADWAY ITEMS Item Description Item Code Prop.Ln. Item Type Unit Quantity Chg. Unit Price Dollar Value PAVED SHLD, PCC, 7" 2122-5190007 0150 ORIGINAL SY 170.473 33.50000 $5,710.85 Reason: Contract Items are Plan Quantity by Specification and are increased to reflect actual measurements in the field. PAVED SHLD, PCC, 11.5" 2122-5190115 0160 ORIGINAL SY 325.469 57.00000 $18,551.73 Reason: Contract Items are Plan Quantity by Specification and are increased to reflect actual measurements in the field. PAVED SHLD, HMA, 8" 2122-5500080 0170 ORIGINAL SY-350.444 59.00000 $-20,676.20 Reason: Items are decreased due to the elimination of work located on the south end of Grand Prairie Parkway. SHLD FINISH, EARTH 2123-7450020 0180 ORIGINAL STA-12.480 155.00000 $-1,934.40 Reason: Items are decreased due to the elimination of work located on the south end of Grand Prairie Parkway. STD/S-F PCC PAVT, CL C CL 3, 10" 2301-1033100 0210 ORIGINAL SY-3,506.682 49.75000 $-174,457.43 Reason: Items are decreased due to the elimination of work located on the south end of Grand Prairie Parkway. STD/S-F PCC PAV'T, CL C CL 3, 11,5" 2301-1033115 0220 ORIGINAL SY 38.889 52.75000 $2,051.39 Reason: Contract Items are Plan Quantity by Specification and are increased to reflect actual measurements in the field. APRON, CONC, 15" 2416-0100015 0390 ORIGINAL EACH -1.000 450.00000 $-450.00 Reason: Items are decreased due to the elimination of work located on the south end of Grand Prairie Parkway. APRON, CONC, 24" 2416-0100024 0410 ORIGINAL EACH 3.000 625.00000 $1,875.00 Reason: Contract Items are Plan Quantity by Specification and are increased to reflect actual measurements in the field. SPECIAL COMPACTION OF 2511-0310100 1010 ORIGINAL STA -2.240 280.00000 $-627.20 SUBGRADE/REC TRAIL Reason: Items are decreased due to the elimination of work located on the south end of Grand Prairie Parkway. Contract: 25-0803-175 Cont. Mod.: 20 Page 2 of 3 GJContract Modification 3/16/2016 1:37 PM Iowa Department of Transportation Field Manager S.Oa Increases / Decreases Project: 25-0803-175, 140819 009 NTF WAIT Category: 0001, N:ROADWAY ITEMS Item Description Item Code Prop.Ln. Item Type Unit Quantity Chg. Unit Price Dollar Value RMVL OF FENCE, CHAIN LINK 2519-4200120 1140 ORIGINAL LF 316.000 5.00000 $1,580.00 Reason: Contract Items are Plan Quantity by Specification and are increased to reflect actual measurements in the field. Subtotal for Category 0001: $-168,411.70 Subtotal for Project 25-0803-175: $-168,411.70 When authorized, the contractor agrees to perform the work outlined above in accordance with provisions of the contract documents. Contract: 25-0803-175 Cont. Mod.: 20 Page 3 of 3