Loading...
HomeMy WebLinkAbout2016-05-02-J01zCC I80 Interchange Contract Mod 22►f1 4 Waukee .1W11 THE KEY TO GOOD LIVING AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 2, 2016 AGENDA ITEM: Consideration of approval of a Contract Modification No. 22 to the Iowa Department of Transportation for the 105th Street/Alice's Road I-80 Interchange Project with a increase in the contract of $7,908.40. FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Camera Circuit Reason: The lighting contractor was inadvertently told to use a conduit in the East bridge rail that was to be used for the city street light circuit. The item is to pay for the removal of the DOT light circuit and the DOT camera circuit and re -install together in one conduit. The available conduit has no access points and pulling all wires will be difficult and will require additional equipment. The cost is reasonable for the amount of work involved and the equipment required. Utility Access Reason: The plans required the contractor to install the fiber optic signal interconnect with the city street light circuits. This is not acceptable to the City of West Des Moines. The price includes furnishing and installation of a type II polymer concrete handhold and additional conduit to re-route the circuits. The price is reasonable when compared to similar items on the contract. Mobilization Reason: The added items require additional equipment to perform the work. The mobilization cost is reasonable for the amount of equipment required. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: Increase the contract by $7,908.40 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Contract Modification No. 22 to the Iowa Department of Transportation for the 105th Street/Alice's Road 1-80 Interchange Project with a net decrease in the contract of $7,908.40. ATTACHMENTS: I. Contract Modification 22 PREPARED BY: Beth Richardson REVIEWED BY: John Gibson PUBLIC NOTICE INFORMATION — NAME OF PUBLICATION: DATE OF PUBLICATION: C44 Contract Modification 4/6/2016 7:06 AM Iowa Department of Transportation FieldManager S.Oa Contract: 25.0803-175, PCC PAVEMENT - GRADE AND NEW Cont. Mod. Number 22 Revision Number Cont. Mod. Date 4/6/2016 Net Change $7,908.40 Awarded Contract Amount $13,423,922.46 Route Entered By HWY 1-80 (C31912) Jennifer Strunk Contract Location DALLAS IMN-080-3(175)119--0E-25 Short Description Add Items Description of Changes NON SUBSTANTIAL Add Item: 'Linear Feet' Item (Camera Circuit) Add Item: 'Each' Item (Utility Access) Add Item: Mobilization New Items Project: 25.0803.175, 140819 009 NTF Category: 0001, N:ROADWAY ITEMS Item Description Item Code Prop.Ln. ItemType Unit Proposed oty. Unit Price Dollar Value ('LINEAR FEET' ITEM) Camera Circuit 2599-9999009 1851 SUPPLEMENT LF 465.000 6.66000 $3,096.90 Reason: The lighting contractor was inadvertently told to use a conduit in the East bridge rail that was to be used for the city street light circuit. The item is to pay for the removal of the DOT light circuit, and the DOT camera circuit and re -install together in one conduit. The available conduit has no access points and pulling all wires will be difficult and will require additional equipment. The cost is reasonable for the amount of work involved and the equipment required. ('EACH' ITEM) Utility Access 2599-9999005 1856 SUPPLEMENT EACH 2.000 1,525,75000 $3,051.50 Reason: The plans required the contractor to install the fiber optic signal interconnect with the city street light circuits. This is not acceptable to the City of West Des Moines. The price includes furnishing and installation of a type II polymer concrete handhold, and additional conduit to re-route the circuits. The price is reasonable when compared to similar items on the contract. ('LUMP SUM' ITEM) Mobilization 2599-9999010 1861 SUPPLEMENT LS 1,000 1,760.00000 $1,760.00 Reason: The added items require additional equipment to perform the work. The Mobilization cost is reasonable for the amount of equipment required. Subtotal for Category 0001: $7,908.40 Subtotal for Project 25.0803-175: $7,908.40 When authorized, the contractor agrees to perform the work outlined above in accordance with provisions of the contract documents. Contract: 25-0803-175 Cont. Mod.: 22 Page 1 of 1