Loading...
HomeMy WebLinkAbout2016-09-19-J06 Village at Shadow Creek Plat 1_Prelim Plat AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: September 19, 2016 AGENDA ITEM: Consideration of approval of a resolution approving a preliminary plat for Village at Shadow Creek Plat 1 FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Greenland Homes with property owner, Landing at Shadow Creek, LLC, requests approval of a preliminary plat in order to plat 74 individual lots for a townhome development that is to be located within The Landing at Shadow Creek Plat 4. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this request on September 13, 2016 and recommended approval subject to remaining staff comments. Approval of a Preliminary Plat for Village at Shadow Creek Plat 1 STAFF REVIEW AND COMMENT: At this time a majority of staff comments have been addressed. Staff recommends approval subject to remaining staff comments. Senior planner Andy Kass introduced the motion submitted by applicant Greenland Homes to approve a site plan, preliminary plat, and final plat for Village at Shadow Creek Plat 1. Mr. Kass advised that the applicant is seeking to develop a townhome community consisting of 15 buildings ranging from 2 to 6 units each for a total of 74 units on the subject property. The interior units will be 1248 square feet in size and the end units will be 1352 square feet. Concrete patios will be provided on most of the units and the units are intended to be rentals. Two access points are indicated on the site plan. One at NE Alice’s Road for which a declaration/ turn lane will be required to be constructed, and one on the south side from NE Dellwood Drive. All streets interior to the site will be privately owned and maintained. A 5 foot sidewalk will be provided on one side of the private street network. Mr. Kass advised that the sanitary sewer will be provided from the stub that was installed as part of the Landing at Shadow Creek Plat 4 improvements in the northwest corner of the site. Sewage will flow to the Little Walnut Creek Lift Station. A water main will be looped through the site from NE Dellwood Drive and connect to the 12 inch water main located along NE Alice’s Road. Storm water detention will be provided in a dry bottom detention basin located in the center of the site. All utilities interior to the site will be privately owned and maintained. A 25 foot landscape buffer easement is being provided along the west plat boundary to provide screening from the adjacent single family district and the proposed site plan indicates the applicant is providing 43% open space. With the parkland dedication being satisfied with the parkland dedicated by the landing at shadow creek plat 4. At this time staff is comfortable with the preliminary plat, site plan, and final plat and would recommend approval subject to remaining staff comments and review of all legal documents by the City Attorney. Commissioner Nigro questioned if there was a grading plan provided in order to view the dente4ntion plans compared to home location. Mr. Kass advised that there was not one submitted, but the applicant did produce one for review. Commissioner Hoifeldt questioned if the elevation would be sporadic or more similar in appearance. Mr. Kass advised that the buildings would not all be allowed to be the same due to design ordinances no more than 3 buildings in the complex could have the same elevation or color scheme. The applicant representative from Schneider and Associates advised that they would be creating more of a sporadic elevation. Commissioner Nigro questioned if staff was comfortable with the lack of berms between the row home sections as this seemed to be opposite from what was required or done in the past. Mr. Kass advised that berms are encouraged if feasible but that they were addressing some drainage issues on the west side of the site by not placing the berms between the buildings. Commissioner Hoifeldt and Nigro asked for some more clarification on the effect the water main easement would have on the patios and landscaping. Mr. Kass advised that the applicant would be working closely with the Public Works department to maintain the appropriate distance away not to disturb the water main and still grant landscaping and equivalent sized patios. Commissioner Shanks questioned what would be used as screening between the units. Mr. Kass advised that it would most likely be some sort of PVC fencing. Commissioner Hoifeldt questioned how the exchange would occur if the developer decided down the road to sell the units instead of leasing them. Mr. Kass advised that regardless, an association would have to be created. He continued, stating that once the last unit had been sold, the developer would hand over the association to a board of residents who would then decide on fees and its upkeep. Commissioner Hoifeldt moved to approve the Preliminary Plat for Village at Shadow Creek plat 1, which was seconded by Commissioner Broderick, Subject to any remaining staff comments and completion of legal documents. Ayes: Nigro, Fontenot, Broderick, Hoifeldt, and Shanks. Nays: none. Motion carried. RECOMMENDATION: Approve the resolution ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Staff Comment Letter IV. Preliminary Plat/Site Plan (see Site Plan for Village at Shadow Creek Townhomes) PREPARED BY: Andy Kass, Senior Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 16- APPROVING THE VILLAGE AT SHADOW CREEK PLAT 1 PRELIMINARY PLAT IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission reviewed and recommended approval of a Preliminary Plat for Village at Shadow Creek Plat 1 on September 13, 2016, subject to remaining staff comments; AND, WHEREAS, the Preliminary Plat for Village at Shadow Creek Plat 1 is in general conformance with section §303 - Land Subdivision Ordinance of the Waukee Municipal Code. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this the 19th day of September, 2016, that the Preliminary Plat for Village at Shadow Creek Plat 1 be approved subject to remaining staff comments. ____________________________ William F. Peard, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk ROLL CALL VOTE AYE NAY ABSENT ABSTAIN Anna Bergman Brian Harrison Shelly Hughes Larry R. Lyon Rick Peterson STAFF REPORT TO: Planning and Zoning Commission PREPARED BY: Andy Kass RE: Village at Shadow Creek Plat 1 – Preliminary Plat, Final Plat, & Site Plan DATE: September 13, 2016 GENERAL INFORMATION: Applicant: Greenland Homes Requested Action Preliminary Plat, Final Plat, & Site Plan Approval Location and Size: Property is generally located west of Alice’s Road, south of the Alice’s Road/NE Douglas Parkway intersection containing approximately 6.30 acres. LAND USES AND ZONING: Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Neighborhood Residential R-4 North Undeveloped Neighborhood Residential C-1 South Alice Patricia Homes Neighborhood Residential R-3 East Single-Family Residential Neighborhood Residential City of Clive West Landing at Shadow Creek Plat 4 Neighborhood Residential R-2 BACKGROUND: The applicant is requesting approval of a preliminary plat, final plat, and site plan in order to develop a townhome community consisting of 74 total units. The subject property is located within the Landing at Shadow Creek Plat 4 development which was rezoned in 2015 from A-1 to R-4. September 9, 2016 2 of 3 ABOVE: Site Plan for the proposed townhomes development. PROJECT DESCRIPTION: The project involves the construction of 15 buildings with a total of 74 units for the entire site. The number of units in each building will vary between 2 and 6 units. Interior units will be 1,248 square feet and end units will be 1,352 square feet. Concrete patios will be provided on most of the units. The units are intended to be rentals. ACCESS AND PARKING: Two access points are indicated on the site plan. One access point will be off of NE Alice’s Road for which a deceleration/turn lane will be required to be constructed. An access on the south side from NE Dellwood Drive will also be constructed. All streets interior to the site will be privately owned and maintained. A 5 foot wide sidewalk will be provided on one side of the private street network. UTILITIES: Sanitary sewer will be provided from the stub that was installed as part of the Landing at Shadow Creek Plat 4 improvements in the northwest corner of the site. Sewage will flow to the Little Walnut Creek Lift Station. Watermain will be looped through the site from NE Dellwood Drive and connect to the 12-inch water main located along NE Alice’s Road. Storm water detention will be provided in a dry bottom detention basin located in the center on the site. This will discharge to an existing drainage channel north of the site. Once the property to the north develops the discharge will be accommodated in the detention for that site. All utilities interior to the site will be privately owned and maintained. September 9, 2016 3 of 3 LANDSCAPING: A 25 foot landscape buffer easement is being provided along the west plat boundary to provide screening from the adjacent single family. The proposed site plan provides for the required landscaping as well as required open space. The required open space is 20% and the applicant is providing 43% open space. ELEVATIONS: The exterior elevations of the townhomes will feature vinyl siding, stone and/or brick, and composite shingles. Each building will be a two story building and each unit will have a two car garage. Colored elevations and material samples will be available at the meeting. MISCELLANEOUS Parkland dedication will be satisfied with the parkland being dedicated by the Landing at Shadow Creek Plat 4. STAFF RECOMMENDATION At this time Staff is comfortable with the preliminary plat/site plan and final plat and would recommend approval of the preliminary plat/site plan and final plat subject to remaining staff comments and review of all legal documents by the City Attorney. CITY OF WAUKEE Andy Kass, AICP Senior Planner Development Services Department 230 W. Hickman Road Waukee, IA 50263 Phone: (515) 978-9533 Fax: (515) 987-1845 1st Review: May 3, 2016 2nd Review: June 1, 2016 3rd Review: June 21, 2016 4th Review: August 30, 2016 Snyder & Associates, Inc. Attn: Eric Cannon 2727 SW Snyder Blvd Ankeny, IA 50023 RE: Shadow Creek Villas Plat 1 Townhomes – Site Plan Dear Mr. Cannon: Per your request, staff has reviewed the proposed site plan for the Shadow Creek Villas Plat 1 Townhomes. The property is located on the west side of NE Alice’s Road and north of the Prairie Crossing development. Based upon our review, staff has the following comments related to the site plan: COVER SHEET & GENERAL COMMENTS 1. Provide the $250 site plan review fee with the next submittal. 2. Staff questions if these units are being platted as separate lots. If so, a final plat is required. Please provide this with the next submittal. 3. Please label more streets within the vicinity map. 4. Verify spelling of Project Construction Manager and Owner/Developer contact name. 5. Please submit full color elevations with the next submittal. Please include materials, colors, dimensions, etc. Please provide elevation drawings for all sides of the buildings. Per the Waukee Site Plan Ordinance, sites where four or more buildings are proposed shall provide slight differentiation in design amongst buildings of the same size or number of units to provide for a higher level of architectural design for the site as a whole. We will need these prior to forwarding to Planning and Zoning Commission. Engineers Response: 6. Please submit a materials board with the next submittal. We need this prior to forwarding to Planning and Zoning Commission. Engineers Response: 7. Please provide a photometric plan with the next submittal including cut sheets. Please provide a current photometric plan. Engineers Response: 8. Provide a storm water management plan with the next submittal. Project Name Project Engineer/Manager Project Type City Contact Village at Shadow Creek Plat 1 Eric Cannon Site Plan Melissa DeBoer 9. Staff questions if this project will be built in phases; if so, provide a phasing plan. 10. Provide a note stating that street signs and stop signs shall be installed prior to issuing any building permits. Engineers Response: SHEET 2 | PROJECT INFORMATION 11. Please provide open space calculations. 12. Please add a note that all fire hydrants shall have Storz fittings. 13. General Note E should be the Development Services Department rather than the Engineering Department. Please revise. 14. General Note T, please include “Department” after “City of Waukee Development Services”. 15. General Note U, please include “Department” after “City of Waukee Development Services”. 16. Please note retaining walls greater than 4 feet in height will need to be designed by a structural engineer. 17. Verify that State Plane South coordinates are being utilized. This plan will be accepted using the Zone 8 coordinates as submitted, but in the future all plans submitted to the City of Waukee shall be submitted using the State Plane South coordinate system, or they will not be accepted. In addition, please provide a conversion chart showing what the Zone 8 coordinates convert to in the State Plane South system. 18. Revise GENERAL NOTES K. to meet SUDAS Specifications Section 2010 for topsoil. 19. Revise POLLUTION PREVENTION NOTES C.4.h. to meet SUDAS Specification Section 2010 for topsoil. 20. Provide total area of disturbance. SHEET 3 | DIMENSION PLAN 21. PCC needs to be 8” and C-4 mix in the ROW of Dellwood and Alice’s (Note 2.I.)PCC needs to be 9” in the ROW on Alice’s Road. Change the text in plan on Alice approach to 9” as well. 22. Note 2.G. utilize SUDAS Type A driveway for Dellwood driveway with radii and expansion on Dellwood. Please correct spelling of “shared” drive. 23. Note 2.L. “NE Dellwood Ave” should be “NE Dellwood Dr”. Please revise. 24. Staff questions what the plans are for trash service to this site. Please address. 25. Staff questions if any monument signage is proposed for this site. If so, please provide details including location, size, material, etc. Please include details prior to forwarding to Planning and Zoning Commission. 26. Staff questions if any ADA parking stalls are proposed or needed for this site. Please address. 27. Please provide proposed street names for the private streets and label them on the plans. Staff will provide addresses once street names have been assigned. Please label the address numbers for each unit. Staff has attached these. Label the private streets as being private on the plans. 28. Staff questions if these units are planned to be rentals or if they will be owner-occupied. Please address. 29. Show future 10’ trail along Alice’s Road and extend sidewalks to connect with the future trail. 30. Provide a traffic control plan and provide a note that one week notice shall be given prior to closing any lane/road closure. Provide a note stating that any lane/road closures are to be coordinated with the City of Waukee. 31. Staff questions if basements are proposed. 32. Provide a decel lane off of Alice’s Road to the north entrance of the townhome site. 33. Please show the current design for NE Dellwood Drive on the plans. 34. On the Typical Unit Detail shown, provide dimensions for side and rear property line to dwelling; and for rear property line to building setback line. Staff would like to see these dimensions labeled for the front of the building as well. 35. Staff questions if any patios or decks are proposed that will go beyond the building setback line. Please address. Staff is okay with the proposed concrete patios, but please note that no deck will be allowed outside the building setback at any point in the future. Also, note that no fence or wall will be allowed to be constructed between the patios for privacy at any point in the future, as these would encroach into the building setback. 36. Provide a note stating that street name signs are to be installed prior to issuing building permits. 37. Provide stop signs at the intersections of the private drives at both NE Dellwood Dr and NE Alice’s Road. 38. Please note that as-builts may be required for buildings that are close to the building setback lines. 39. On Dimension Plan Construction Note 4, update the sheet numbers. 40. Staff questions what the plans are for the mailbox pads, because as shown now the typical sized mailbox pads from the post office will not be enough mailboxes for the number of units shown for this project. The proposed mailbox pad locations should be moved to the side of the street with the sidewalk. Dimension Plan Construction Note 2J should reference Sheet 9 of 12 instead of 10. Engineers Response: 41. Staff questions if what is proposed on the plan are decks or concrete patios and whether any of these will extend over the building setback line. Also, these cannot be built over the water main easement and the easement cannot be shortened. Provide a note stating that no patios are to be built over the water main easement and no privacy fences or walls can be constructed within the easement at any point in the future. Engineers Response: SHEET 4 | WATER MAIN AND SANITARY SEWER PLAN 42. Label all critical crossings with top and bottom of pipe elevations. 43. Please arrange services to the units the same for all units with sanitary on the left and water on the right. 44. Please provide a scale and north arrow on this sheet. 45. Show existing hydrants on Dellwood Dr/Alice’s Road. 46. Reposition hydrants so they are at every intersection and spaced 300 feet apart. 47. Identify material types for pipes. 48. Per the Fire Department, the fire hydrant at the end of the street at the southeast corner of the site can be moved north to the southwest corner of the intersection. The watermain extension beyond the hydrant is not needed. 49. Staff questions if natural gas will be provided to these units. Please address. 50. Correct overlapping text at critical crossing at the southeast corner of the site. 51. Verify that the sanitary stub (southeast out of the manhole) listed to be removed in the northwest corner of the site was installed. (See plan sheet attached from Landing at Shadow Creek Plat 4) 52. Verify watermain on NE Alice’s Road is in the correct location. Verify 5 ½’ cover will be provided. Engineers Response: 53. Staff questions if the appropriate easements have been obtained from the property owner to the north. Engineers Response: 54. Show gas meter locations on the buildings. Engineers Response: SHEET 5 | STORM SEWER PLAN 55. Verify minimum horizontal distance of 10’ from ST-6 and the water main. 56. Provide an easement for the storm sewer outlet to the north of this property. Staff questions how water will drain away from this outlet. Please address. 57. Staff questions if the pond is proposed to be wet or dry bottom. Please address. 58. Are sump services required or are these slab on grade. 59. Provide leaders pointing to the 100 year flood elevations. 60. Staff questions how much cover will be over the watermain along Alice’s Road after the proposed grading to the FES at lot 44/45 and if this will conflict with the power poles along Alice’s Road. Please show the power poles located along Alice’s Road on this plan. 61. Staff questions if there will be separate electric services for each unit. If not, please provide a master covenant easement for electric services and feeders. Engineers Response: 62. Add an intake in the turn lane on NE Alice’s Road, along the taper, before the curb ends. Engineers Response: SHEET 6 | GRADING PLAN 63. Capture water from lots 1-8 prior to its leaving site. Staff questions if Erin Ollendike’s calculations from the single family residential portion accommodates for this townhome portion. Please address. 64. Please provide a 3 foot berm along the west side of the property in order to provide screening between the townhomes and single family residential to the west (adjust fixtures as needed). Staff suggests providing a berm with intermittent breaks throughout in order to accommodate for water drainage as has been done in other developments throughout the city. 65. Provide building corner elevations on the plan. 66. Please show 2% minimum drainage has been met. 67. Indicate and illustrate 100 year flood elevations at all detention and sump areas. Please illustrate the 100 year elevations as well. Staff questions if there are any 100 year elevations along Alice’s Road. Please address. 68. Illustrate overflow routes and elevations. Please illustrate where the water goes. 69. Specify the percent grade for the swale along Alice’s Road and other swales where “2% min” is shown. 70. Staff questions if a swale will be graded to the north of this property where the storm water outlets on the property to the north. 71. Adjust Grading Plan Notes 7 to meet SUDAS Specifications Section 2010 for topsoil. 72. Provide details of the outlet shown going to the north. How will the water flow once it exits the site? Engineers Response: SHEET 7 | EROSION AND SEDIMENT CONTROL PLAN 73. Show the sediment controls that are shown on Sheet 6 on this sheet as well. 74. Provide proposed topsoil stockpile location. 75. Provide proposed staging area location. 76. Provide proposed concrete washout location. 77. Provide proposed construction exit location. 78. Revise Pollution Prevention Notes C.4.h. to meet SUDAS Specifications Section 2010 for topsoil. 79. Staff recommends providing sediment control around the basin while buildings are under construction. 80. Revise Grading Plan General Notes E to meet SUDAS Specifications Section 2010 for topsoil. 81. Revise Grading Plan General Notes H. Please revise Grading Plan General Note H (should not be 98th St). 82. Provide a detail for the standpipe proposed at the basin outlet. Show elevations of the standpipe. Please provide these elevations. Engineers Response: 83. Note H under “Grading Plan General Notes” should be hydromulch in ROW of Alice’s Road and sod remainder of site. SHEET 8 | PLANTING PLAN 84. Please show and label mechanical units on this plan as well as provide a detail of how these will be screened. SHEET 9 | DETAILS 85. Provide percent slopes for both sides of the pedestrian ramps, rather than just down the middle. 86. Indicate detectable warning panels for the sidewalk ramps. Verify that not providing detectable warning panels for the sidewalks interior to the site are in compliance with both ADA and the Fair Housing Act. 87. Please adjust labels for running ramp grades in order to make legible. 88. Please label cross slopes at the bottom of the pedestrian ramps. 89. Label cross slope of the sidewalk ramp detail. SHEET 10 | DETAILS 90. Label the cross slope of the crosswalk between the ramps. VEENSTRA AND KIMM COMMENTS: 91. Show address of property being developed. 92. Add a note stating that the contractor is to provide submittals of construction materials prior to construction. 93. Provide a project quantities tabulation. 94. Sheet 4: Modify Typical Service Detail and drawing to show sanitary service on left and water service on right when facing lot. 95. Sheet 4: Show top and bottom of pipe elevations at critical crossings. 96. Sheet 6: Show off-site surface drainage information. 97. Sheet 10: Show detectable warning panels on sidewalk ramp details. 98. Add City standard details for riser, driveway approach, flared end section footing, and service connection. 99. (46) End water main at new fire hydrant location. 100. Sheet 4: Correct text overlaps with street names. 101. Sheet 7: Change ^ to ° on pvc riser for sediment control note at outlet of drainage basin. MISCELLANEOUS COMMENTS: The applicant will be required to provide the following as a part of the completion of the public improvements prior to approval of a final plat: 102. Post Construction What practices considered for this site? 103. Provide a site plan specific to the storm water management facilities of the property indicating the permanent measures utilized by the designer and requirements for maintenance of said facilities. 104. A maintenance covenant will need to be created and provided for review (if different than the existing). 105. As-built plans of all storm water management facilities on site and a certification statement signed by SWPPP designer indicating that facilities were constructed as designed will be required. 106. Please address COSESCO comments sent on 5/5/16 by email from Jenny Corkrean. Provide remaining $135 fee for COSESCO inspection. Engineers Response: FINAL PLAT 1. Please submit the final plat review fee of $250.00 with the next submittal. 2. Please provide a new plat name for this plat. 3. Please label addresses for each townhome lot. Staff has included the addresses to be used. Please propose street names for the private streets. 4. Please verify that all existing easements are labeled with book and page numbers. 5. Please verify that all proposed easements are indicated on the final plat. 6. Please label the private streets as being private on the final plat. 7. Provide a note stating that the streets are to be privately owned and maintained. 8. Please update the vicinity map to include more surrounding streets. 9. Indicate and illustrate 100 year flood elevations for all detention and sump areas. 10. Verify that the building located on Lot 59 will not encroach into the PUE. 11. All legal documents should be submitted prior to forwarding to City Council. 12. Staff questions why Lot 59 is highlighted. Please address. 13. Please revise the name of the final plat to be consistent with the name used for the site plan. Engineers Response: Staff would request that the revised plans and comment response letter be provided in digital form (PDF) and hard copies with 5 full-sized hard copies delievered to Waukee City Hall. The PDF copy may be emailed. One additional hard copy set including any storm water management materials should be delivered directly to Veenstra and Kimm to Jordan Kappos’s attention. Should you have any questions or concerns regarding these comments, please feel free to contact Brad Deets (515-978-7899), Andy Kass (515-978-7897) or myself at (515) 978-7898. Sincerely, Melissa DeBoer, AICP Planner II