Loading...
HomeMy WebLinkAbout2016-09-19-J08 Village at Shadow Creek Townhomes_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: September 19, 2016 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Village at Shadow Creek Townhomes FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Greenland Homes with property owner, Landing at Shadow Creek, LLC, requests approval of a preliminary plat in order to plat 74 individual lots for a townhome development that is to be located within The Landing at Shadow Creek Plat 4. Access to the property will be provided via a private drive off of NE Alice’s Road and from NE Dellwood Drive. All utilities within the plat will be privately owned and maintained. The interior street network will be privately owned and maintained as well. The applicant has provided elevations for proposed building on the site which meets the intent of the architectural guidelines within the Site Development and Building Standards Ordinance. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this request on September 13, 2016 and recommended approval subject to remaining staff comments. Approval of a Site Plan for Village at Shadow Creek Townhomes Senior planner Andy Kass introduced the motion submitted by applicant Greenland Homes to approve a site plan, preliminary plat, and final plat for Village at Shadow Creek Plat 1. Mr. Kass advised that the applicant is seeking to develop a townhome community consisting of 15 buildings ranging from 2 to 6 units each for a total of 74 units on the subject property. The interior units will be 1248 square feet in size and the end units will be 1352 square feet. Concrete patios will be provided on most of the units and the units are intended to be rentals. Two access points are indicated on the site plan. One at NE Alice’s Road for which a declaration/ turn lane will be required to be constructed, and one on the south side from NE Dellwood Drive. All streets interior to the site will be privately owned and maintained. A 5 foot sidewalk will be provided on one side of the private street network. Mr. Kass advised that the sanitary sewer will be provided from the stub that was installed as part of the Landing at Shadow Creek Plat 4 improvements in the northwest corner of the site. Sewage will flow to the Little Walnut Creek Lift Station. A water main will be looped through the site from NE Dellwood Drive and connect to the 12 inch water main located along NE Alice’s Road. Storm water detention will be provided in a dry bottom detention basin located in the center of the site. All utilities interior to the site will be privately owned and maintained. A 25 foot landscape buffer easement is being provided along the west plat boundary to provide screening from the adjacent single family district and the proposed site plan indicates the applicant is providing 43% open space. With the parkland dedication being satisfied with the parkland dedicated by the Landing at Shadow Creek Plat 4. At this time staff is comfortable with the preliminary plat, site plan, and final plat and would recommend approval subject to remaining staff comments and review of all legal documents by the City Attorney. Commissioner Nigro questioned if there was a grading plan provided in order to view the dente4ntion plans compared to home location. Mr. Kass advised that there was not one submitted, but the applicant did produce one for review. Commissioner Hoifeldt questioned if the elevation would be sporadic or more similar in appearance. Mr. Kass advised that the buildings would not all be allowed to be the same due to design ordinances no more than 3 buildings in the complex could have the same elevation or color scheme. The applicant representative from Schneider and Associates advised that they would be creating more of a sporadic elevation. Commissioner Nigro questioned if staff was comfortable with the lack of berms between the row home sections as this seemed to be opposite from what was required or done in the past. Mr. Kass advised that berms are encouraged if feasible but that they were addressing some drainage issues on the west side of the site by not placing the berms between the buildings. Commissioner Hoifeldt and Nigro asked for some more clarification on the effect the water main easement would have on the patios and landscaping. Mr. Kass advised that the applicant would be working closely with the Public Works department to maintain the appropriate distance away not to disturb the water main and still grant landscaping and equivalent sized patios. Commissioner Shanks questioned what would be used as screening between the units. Mr. Kass advised that it would most likely be some sort of PVC fencing. Commissioner Hoifeldt questioned how the exchange would occur if the developer decided down the road to sell the units instead of leasing them. Mr. Kass advised that regardless, an association would have to be created. He continued, stating that once the last unit had been sold, the developer would hand over the association to a board of residents who would then decide on fees and its upkeep. Commissioner Hoifeldt moved to approve the Site Plan for Village at Shadow Creek Plat 1, which was seconded by Commissioner Shanks, Subject to any remaining staff comments and completion of legal documents. Ayes: Nigro, Fontenot, Broderick, Hoifeldt, and Shanks. Nays: none. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval subject to remaining staff comments. RECOMMENDATION: Approve the resolution ATTACHMENTS: I. Proposed Resolution II. Staff Report (see preliminary plat information) III. Staff Comment Letter (see preliminary plat information) IV. Site Plan/Preliminary Plat & Elevations PREPARED BY: Andy Kass, Senior Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 16- APPROVING THE SITE PLAN FOR VILLAGE AT SHADOW CREEK TOWNHOMES IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Village at Shadow Creek Townhomes, subject to remaining staff comments on September 13, 2016; AND, WHEREAS, the Site Plan for Village at Shadow Creek Townhomes is in general conformance with §304 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Village at Shadow Creek Townhomes is in general conformance with §301.27(A) – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 19th day of September, 2016 that the Site Plan for Village at Shadow Creek Townhomes is approved subject to remaining staff comments. ____________________________ William F. Peard, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk ROLL CALL VOTE AYE NAY ABSENT ABSTAIN Anna Bergman Brian Harrison Shelly Hughes Larry R. Lyon Rick Peterson BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP01_1151084_TSH.dgn8/23/20163:27:31 PMSnyder1:500pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNERCITY OF WAUKEE, DALLAS COUNTY, IOWA MULTI - FAMILY RESIDENTIAL DEVELOPMENT FOR SITE PLAN OWNER/DEVELOPER INDEX OF SHEETS PROJECT CONSTRUCTION MANAGER Sheet 8 STATE OF IO WA PROFESSIO N ALLANDSCAPE AR CHITECTDate License Number Pages or sheets covered by this seal: 512 NO. ARCHITECT LANDSCAPE Clay R. Schneckloth, ASLA 512 SCHNECKLOTH CLAY R. under the laws of the State of Iowa. Professional Landscape Architect charge. I am a duly licensed direct supervision and responsible below was prepared by me or under my this technical submission described I hereby certify that the portion of June 30, 2017 License Expires: VICINITY MAP 1"=500' PROJECT LOCATION NE ALICE'S RDTITLE SHEET1 1500'Date IOWALICENSEDPROFESSIO N A LEN GI NEERLicense Number Pages or sheets covered by this seal: My License Renewal Date is December 31, 2017 18954 18954 CANNON ERIC D.Eric D. Cannon, P.E. under the laws of the State of Iowa. licensed Professional Engineer supervision and that I am a duly by me or under my direct personal engineering document was prepared I hereby certify that this Sheets 1-7, 9-12 PHONE: (515) 865-2546 CONTACT: COREY KAUTZ CLIVE, IA 50325 10888 HICKMAN ROAD, SUITE 3A GREENLAND HOMES PHONE: (515) 865-2546 CONTACT: COREY KAUTZ CLIVE, IA 50325 10888 HICKMAN ROAD, SUITE 3A GREENLAND HOMES DOUGLAS PARKWAY TURN LANE DETAILS SIDEWALK RAMP DETAILS CITY OF WAUKEE STANDARD DETAILS SITE DETAILS PLANTING PLAN EROSION AND SEDIMENT CONTROL PLAN GRADING PLAN STORM SEWER PLAN WATER AND SANITARY SEWER PLAN DIMENSION PLAN PROJECT INFORMATION TITLE SHEET 12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. DELLWOOD DR MAPLE ST BERKSHIRE PKWYNW 167TH STNE WESTGATE DRVISTA DR BUENAB O ST O N PK W Y AIRLINE DR PRAIRIE DR HORTON CIRBAXTERCIRBERKSHI RE PKWYVILLAGE AT SHADOW CREEK PLAT 1 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP02_1151084_NTS.dgn8/23/20163:28:07 PMSnyder1:1pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNERZONING GENERAL USE PARKING REQUIREMENTS: CONTROL POINTS TOWNHOMES 93 93.0 93 C OC FO E OE 4" G 4" HPG 8" W 8" S 12" ST12" ST G G AST UST Features Existing Proposed G EB W LEGEND 8" W(*) 8" S(*) 4" G(*) 4" HPG(*) C(*) OC(*) FO(*) E(*) OE(*) DUCT(*) 93.0 1 Soil Boring Mailbox Satellite Dish Sign Above Ground Storage Tank Underground Storage Tank Fence Post or Guard Post Gas Apparatus Gas Manhole Gas Valve Fiber Optic Handhole Fiber Optic Manhole Communication Handhole Communication Manhole Communication Pedestal Traffic Sign Electric Transformer Electric Box Yard Light Street Light Utility Pole with Transformer Utility Pole with Light Guy Anchor Utility Pole Well Water Service Valve Water Main Valve Fire Hydrant on Building Fire Hydrant Double Storm Sewer Intake Single Storm Sewer Intake Storm Manhole Storm Sewer with Size Sanitary Manhole (*) Denotes the survey quality service level for utilities Test Hole Location for SUE w/ID Duct Bank Sanitary Sewer with Size Water Main with Size High Pressure Gas Main with Size Gas Main with Size Overhead Electric Underground Electric Fiber Optic Overhead Communication Communication Coniferous Tree or Shrub Deciduous Tree or Shrub Tree Stump Tree Line Fence (Silt) Fence (Wood) Fence (Chain Link) Fence (Barbed, Field, Hog) Contour Elevation Spot Elevation UTILITY CONTACT INFORMATION SYSTEM, TICKET NUMBER 551501715. RECEIVED FROM THE IOWA ONE CALL DESIGN REQUEST UTILITY CONTACT FOR MAPPING INFORMATION SHOWN AS UTILITY WARNING UTILITY QUALITY SERVICE LEVELS THE TYPE, SIZE, CONDITION, MATERIAL, AND OTHER CHARACTERISTICS. BY ACTUAL EXPOSURE OR VERIFICATION OF PREVIOUSLY EXPOSED SUBSURFACE UTILITIES, AS WELL AS IS HORIZONTAL AND VERTICAL POSITION OF UNDERGROUND UTILITIES OBTAINEDQUALITY LEVEL (A) SUBSURFACE UTILITIES. GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF INFORMATION IS OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE QUALITY LEVEL (B) QUALITY D INFORMATION. UTILITY FEATURES AND USING PROFESSIONAL JUDGMENT IN CORRELATING THIS INFORMATION WITH INFORMATION IS OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND QUALITY LEVEL (C) INFORMATION IS DERIVED FROM EXISTING UTILITY RECORDS OR ORAL RECOLLECTIONS.QUALITY LEVEL (D) APPLICABLE, SIZE. THE QUALITY LEVELS ARE BASED ON THE CI / ASCE 38-02 STANDARD. QUALITY LEVELS OF UTILITIES ARE SHOWN IN THE PARENTHESES WITH THE UTILITY TYPE AND WHEN EXCEPT WHERE NOTED AS QUALITY LEVEL A. UTILITIES OR SUBSURFACE FEATURES SHOWN ARE IN THE EXACT LOCATION INDICATED SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE SUBSURFACE FEATURES SHOWN COMPRISE ALL SUCH ITEMS IN THE AREA, EITHER IN RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES OR THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR GENERAL NOTES Contact Email : troyer@waukee.org 515-978-7920 Tim Royer WAUKEE, CITY OF Gary@nexgencom.com 515-369-9000 Gary Reimers NEXGEN INTEGRATED COMMUNICATIONS Contact Email : troyer@waukee.org 515-978-7920 Tim Royer WAUKEE, CITY OF Thomas.sturmer@centurylink.com 303-664-8090 Tom Sturmer CENTURYLINK pmay@mediacomcc.com 515-246-2252 Paul May MEDIACOM COMMUNICATIONS CORP Joel.Schroeder@windstream.com 800-289-1901 JOEL SCHROEDER WINSTREAM MCLEOD MECDSMDesignLocates@midamerican.com 515-252-6632 Craig Ranfeld MIDAMER-ELEC jeff@netins.com 515-830-0445 Jeff Klocko IOWA NETWORK SERVICES Joni.McCabe@HickoryTech.com 507-387-1770 Joni McCabe HICKORY TECH GAS NO RESPONSE W-2 C-1 CLEAR C-2 OE/E C-2 FO1 BULK REGULATIONS IMPERVIOUS AREA PERVIOUS AREA LEGAL DESCRIPTION PROJECT INFORMATION2 21'154,346 SF 120,194 SF CP3 CP1 CP7 BEING AND OFFICIAL PLAT DALLAS COUNTY, IOWA. LOT 33, LANDING AT SHADOW CREEK PLAT 4, IARTN DERIVED - US SURVEY FEET ZONE 8 IOWA AMES-DESMOINES COORDINATE SYSTEM FND CUT "X" SE CORNER NW1/4, NE1/4 N=7,501,294.3930 E=18,461,442.2600 FND CUT "X" NE CORNER NE1/4, NE1/4 N=7,502,616.3450 E=18,462,765.9100 FND CUT "X" NE CORNER SE1/4, NE1/4 N=7,501,299.0230 E=18,462,762.1900 R-4 ROW DWELLING AND TOWNHOME DISTRICT 163 SPACES TOTAL PROVIDED 163 SPACES TOTAL REQUIRED 74 UNITS / 5 = 15 SPACES 2 SPACES X 74 UNITS = 148 SPACES(1 IN GARAGE, 1 IN DRIVEWAY) 1 SPACE PER 5 UNITS 2 SPACES PER UNIT MINIMUM OPEN SPACE = 20% NUMBER OF CONNECTED UNITS = MINIMUM 2, MAXIMUM 6. NUMBER OF STORIES = MINIMUM 2, MAXIMUM 3 REAR YARD = 30 FEET SIDE YARD = 15 FEET BETWEEN PRINCIPLE BUILDINGS LOT WIDTH = 24 FEET MINIMUM MINIMUM FLOOR AREA = 800 SQUARE FEET PER UNIT DENSITY = 12 DWELLING UNITS/ACRE MAXIMUM POLLUTION PREVENTION NOTES PRIOR TO FILING OF THE "NOTICE OF DISCONTINUATION". REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND SITE WASTE k. MUST BE CONTAINED ONSITE. BASIN OR OTHER CONTROL DEVICE WHERE POSSIBLE. CONCRETE WASHOUT DIVERSION BERMS AND/OR SILT BARRIERS AND DIRECT TO A SEDIMENT WASHOUT FACILITY. CONTROL RUNOFF FROM STAGING AREAS WITH AREA, TEMPORARY SANITARY FACILITIES, MATERIALS STORAGE, AND CONCRETE CONTAIN THE FOLLOWING: JOB TRAILERS, FUELING / VEHICLE MAINTENANCE IN THE SWPPP. UNLESS NOTED OTHERWISE, STAGING AREAS SHOULD COORDINATE LOCATIONS OF STAGING AREAS WITH THE OWNER AND RECORD j. CALENDAR DAYS. ACTIVITY HAS FINISHED OR IS PLANNED TO BE DELAYED MORE THAN 21 MEASURES NO LATER THAN 14 CALENDAR DAYS AFTER CONSTRUCTION COMPLETION OR DELAY OF GRADING OPERATIONS. INITIATE STABILIZATION MIX, PERMANENT SEED MIX, OR SOD AS SOON AS PRACTICAL UPON STABILIZE UNDEVELOPED, DISTURBED AREAS WITH MULCH, TEMPORARY SEED i. LOCATED TO MEET SUDAS SPECIFICATIONS SECTION 2010 FOR TOPSOIL. AREAS, EXCEPT WHERE PAVEMENT, BUILDINGS OR OTHER IMPROVEMENTS ARE RESPREAD TOPSOIL (INCLUDING TOPSOIL FOUND IN SOD) ON ALL DISTURBED h. CONTROL MEASURES AS SOON AS STORM SEWERS ARE INSTALLED. TO ENSURE CONTINUOUS RUNOFF CONTROL. PROVIDE INLET AND OUTLET REACH THEIR FINAL GRADES AND AS CONSTRUCTION OPERATIONS PROGRESS CONTROL MATS, MULCH, DITCH CHECKS OR RIPRAP AS SOON AS AREAS INSTALL NECESSARY CONTROL MEASURES SUCH AS SILT BARRIERS, EROSION g. REMEDIAL ACTIONS FOR FUTURE PREVENTION. REMOVE ANY ACCUMULATION OF EARTH OR DEBRIS IMMEDIATELY AND TAKE STREETS, DRIVEWAYS, SIDEWALKS, DRAINAGEWAYS, OR UNDERGROUND SEWERS. ACTIVITIES ON ADJOINING PUBLIC OR PRIVATE PROPERTIES, INCLUDING PREVENT ACCUMULATION OF EARTH AND DEBRIS FROM CONSTRUCTION f. ANY RECOMMENDED MEASURES WITHIN 7 DAYS. OR ENGINEER DURING CONSTRUCTION. REVISE THE SWPPP AND IMPLEMENT ACTIONS IN THE SWPPP WITH A COPY SUBMITTED WEEKLY TO THE OWNER DAYS. RECORD THE FINDINGS OF THESE INSPECTIONS AND ANY RESULTING PERSONNEL ASSIGNED BY THE CONTRACTOR) EVERY SEVEN CALENDAR INSPECT THE PROJECT AREA AND CONTROL DEVICES (BY QUALIFIED e. ORIGINAL CAPACITY. SILT CONTROL DEVICES WHEN THE MEASURES HAVE LOST 50% OF THEIR SEDIMENT REMOVAL THROUGHOUT THE PERMIT PERIOD. CLEAN OR REPLACE WORKING ORDER, INCLUDING CLEANING, REPAIRING, REPLACEMENT, AND MAINTAIN ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES IN d. OPERATIONS AT ANY TIME. AND LIMIT TO A MINIMUM THE TOTAL AREA DISTURBED BY CONSTRUCTION PRESERVE EXISTING VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION c. GRADING OPERATIONS. DOWNSTREAM OF SOIL DISTURBING ACTIVITIES PRIOR TO SITE CLEARING AND BARRIERS, DITCH CHECKS, DIVERSION BERMS, OR SEDIMENTATION BASINS INSTALL PERIMETER AND FINAL SEDIMENT CONTROL MEASURES SUCH AS SILT b. AND MINIMIZE SOIL COMPACTION. INCREASE SEDIMENT REMOVAL AND MAXIMIZE STORM WATER INFILTRATION, AROUND SURFACE WATERS, DIRECT STORM WATER TO VEGETATED AREAS TO WHEN DISCHARGING FROM BASINS, PROVIDE AND MAINTAIN NATURAL BUFFERS UTILIZE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE a. FOLLOWING BMP'S UNLESS INFEASIBLE OR NOT APPLICABLE: THE GENERAL PERMIT AND SWPPP, INCLUDING, BUT NOT LIMITED TO, THE THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL REQUIREMENTS OF 4. CONSTRUCTION PROGRESS AND CHANGES AT THE PROJECT SITE. THE SWPPP AND SITE MAP SHOULD BE EXPEDITIOUSLY REVISED TO REFLECT 3. PLAN MAY BE REQUIRED. IDENTIFY, NOTE AND IMPLEMENT. ADDITIONAL BMP'S FROM THOSE SHOWN ON THE CONSTRUCTION ACTIVITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR TO BMP'S AND EROSION CONTROL MEASURES REQUIRED AS A RESULT OF (BMP) FOR COMPLIANCE WITH THE PROJECT'S NPDES PERMIT COVERAGE. ALL THE SWPPP ILLUSTRATES GENERAL MEASURES AND BEST MANAGEMENT PRACTICES 2. THE POLLUTION PREVENTION PLAN MADE DURING CONSTRUCTION. REFER TO THE SWPPP FOR ADDITIONAL REQUIREMENTS AND MODIFICATIONS TO DOCUMENT IN ADDITION TO THESE PLAN DRAWINGS. THE CONTRACTOR SHOULD THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS A SEPARATE 1. POLLUTION PREVENTION PLAN:C. AND/OR SUBMITTAL OF THE NOTICE OF DISCONTINUATION. PROVIDE THE ORIGINAL DOCUMENTS TO THE OWNER UPON PROJECT ACCEPTANCE PROJECT COMPLETION. THE CONTRACTOR SHALL RETAIN A RECORD COPY AND DOCUMENTS MUST BE RETAINED FOR A PERIOD OF THREE YEARS AFTER EROSION CONTROL MEASURES. ALL PLANS, INSPECTION REPORTS, AND OTHER STABILIZATION OF THE DISTURBED SITE AND REMOVAL OF ALL TEMPORARY A "NOTICE OF DISCONTINUATION" MUST BE FILED WITH THE IDNR UPON FINAL 3. AND THE CODE OF IOWA. THE NPDES PERMIT REQUIREMENTS IS A VIOLATION OF THE CLEAN WATER ACT TO ANY JURISDICTIONAL AGENCIES UPON REQUEST. FAILURE TO COMPLY WITH OTHER ITEMS, SHALL BE KEPT ON SITE AT ALL TIMES AND MUST BE PRESENTED DISCHARGE AUTHORIZATION LETTER, CURRENT SWPPP, SITE INSPECTION LOG, AND BUT NOT LIMITED TO, THE NOTICE OF INTENT, PROOF OF PUBLICATIONS, ALL DOCUMENTS RELATED TO THE STORM WATER DISCHARGE PERMIT, INCLUDING, 2. PERMIT COVERAGE FROM THE IDNR. POLLUTION PREVENTION PLAN (SWPPP) AND POSSIBLY OBTAINING THE GENERAL GENERAL PERMIT NO. 2 INCLUDING CREATING OR MAINTAINING THE STORM WATER FOR COMPLIANCE WITH AND FULFILLMENT OF ALL REQUIREMENTS OF THE NPDES (EPA). THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FROM THE IDNR, AS REQUIRED BY THE ENVIRONMENTAL PROTECTION AGENCY FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES THIS PROJECT REQUIRES COVERAGE UNDER THE NPDES GENERAL PERMIT NO. 2 1. STORM WATER DISCHARGE PERMITB. THE COST THEREOF FROM AMOUNTS DUE TO THE CONTRACTOR. PROPERTY, THE OWNER MAY, BUT NEED NOT, REMOVE SUCH ITEMS AND DEDUCT SEDIMENTATION OR DEBRIS WHICH COMES ONTO ADJOINING PUBLIC OR PRIVATE CONTRACTOR FAILS TO TAKE NECESSARY STEPS TO PROMPTLY REMOVE EARTH INCLUDING REASONABLE ATTORNEY FEES INCURRED TO OWNER. FURTHER, IF THE RESULTING FROM DAMAGES TO ADJOINING PUBLIC OR PRIVATE PROPERTY, ENGINEER HARMLESS FROM ANY AND ALL CLAIMS OF ANY TYPE WHATSOEVER DAMAGE CLAIMS: THE CONTRACTOR WILL HOLD THE OWNER AND ARCHITECT / 2. DURING PERFORMANCE OR AS A RESULT OF PERFORMANCE. FROM THIS PROJECT SITE AND ALL OFF-SITE BORROW OR DEPOSIT AREAS TAKE ALL NECESSARY STEPS TO PROTECT AGAINST EROSION AND POLLUTION U.S. CLEAN WATER ACT AND ANY LOCAL ORDINANCES. THE CONTRACTOR SHALL CODE, THE IOWA DEPARTMENT OF NATURAL RESOURCES (IDNR) NPDES PERMIT, THE POTENTIAL POLLUTION AND SOIL EROSION CONTROL REQUIREMENTS OF THE IOWA CODE COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL 1. POLLUTION PREVENTION AND EROSION PROTECTIONA. TOTAL AREA OF DISTURBANCE 6.05 AC. II. CONTRACTOR TO INSTALL STREET NAME SIGNS PRIOR TO ISSUING BUILDING PERMITS. HH. CONTRACTOR IS TO COORDINATE ANY LANE/ROAD CLOSURES WITH THE CITY OF WAUKEE. GG. CONTRACTOR IS TO PROVIDE SHOP DRAWING SUBMITTALS OF CONSTRUCTION MATERIALS PRIOR TO CONSTRUCTION. IMPROVEMENTS. FF. SEE LANDING AT SHADOW CREEK PLAT 4 PUBLIC IMPROVEMENT CONSTRUCTION DRAWINGS FOR COORDINATION OF ADJACENT EE. RETAINING WALLS GREATER THAN 4 FEET IN HEIGHT WILL BE REQUIRED TO BE DESIGNED BY A STRUCTURAL ENGINEER. DD. ALL FIRE HYDRANTS WILL BE REQUIRED TO HAVE STORZ FITTINGS. CC. THE TOWNHOME ASSOCIATION SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF THE DETENTION BASINS. OF WAUKEE PUBLIC WORKS SHALL WITNESS ALL TIE-INS. BB. CONTRACTOR SHALL COORDINATE ALL TIE-IN TO UTILITIES WITH THE CITY OF WAUKEE PUBLIC WORKS DEPARTMENT AND CITY CONCRETE OPERATIONS TO DISCHARGE OFFSITE. AA. CONSTRUCTION OPERATIONS SHALL PROTECT STORM SEWERS AND DRAINAGE WAYS FROM ALLOWING CONCRETE SLURRY FROM PUBLIC IMPROVEMENTS AND ALL UTILITIES SHALL BE TESTED TO CITY STANDARDS. THE CITY SHALL WITNESS ALL TESTING. Z. ALL UTILITIES INCLUDING PRIVATE UTILITIES SHALL BE CONSTRUCTED TO THE CITY OF WAUKEE STANDARD SPECIFICATIONS FOR TO THE DESIGN ENGINEER FOR INCLUSION ON THE RECORD AS-BUILT DRAWINGS. DRAINAGE SWALES, OVERFLOWS, ACCESSIBLE RAMPS AND DETENTION FACILITIES. THE CONTRACTOR SHALL PROVIDE INFORMATION Y. AS-BUILTS SHALL BE PROVIDED TO THE WAUKEE ENGINEERING DEPARTMENT INCLUDING ALL UTILITIES AND AS-BUILT GRADES FOR SEALED. SIDEWALKS AND PCC PAVEMENT. THE PCC RAMP JOINT LOCATED AT THE BACK OF CURB AND ALL EXPANSION JOINTS SHALL BE X. PLACE 3/4" EXPANSION JOINT BETWEEN ALL PCC PAVEMENT/SIDEWALKS AND BUILDINGS. PLACE 1/2" EXPANSION JOINT BETWEEN W. ALL CONSTRUCTION TO EXISTING SANITARY MANHOLES SHALL BE CORE DRILL WITH A LINK SEAL. ALL SANITARY SEWER MANHOLES SHALL BE VACUUM TESTED. WITNESS ALL CLEANING AND TELEVISING. COPIES OF THE REPORT AND VIDEO SHALL BE PROVIDED TO THE CITY OF WAUKEE. V. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND TELEVISED PRIOR TO PAVING. THE CITY OF WAUKEE SHALL IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT. U. THE CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES MADE DURING CONSTRUCTION THAT HAVE NOT BEEN GRANTED APPROVAL DEVELOPMENT SERVICES DEPARTMENT PRIOR TO CONSTRUCTION. T. ANY CHANGES PROPOSED TO THE DRAWINGS DURING CONSTRUCTION SHALL BE APPROVED IN WRITING BY THE CITY OF WAUKEE FACILITIES. S. ALL STAKING SHALL BE DONE UNDER THE DIRECTION OF A LICENSED ENGINEER OR LAND SURVEYOR INCLUDING PEDESTRIAN CONSTRUCTION ACTIVITIES BEGINNING. R. A PRE-CONSTRUCTION MEETING WITH THE CITY OF WAUKEE WILL BE REQUIRED A MINIMUM OF ONE WEEK PRIOR TO TO THE STORM SEWER IS AT LEAST TEN FEET. GASKET JOINTS SHALL BE INSTALLED ON EACH SIDE OF THE CROSSING UNTIL THE NORMAL DISTANCE FROM THE WATER MAIN SHALL BE CONSTRUCTED OF REINFORCED CONCRETE WITH A FLEXIBLE O-RING GASKET RATED AT 13 PSI OR GREATER. O-RING Q. IF STORM SEWER CROSSES ABOVE WATER MAIN OR CROSSES LESS THAN 18" BELOW A WATER MAIN THEN STORM SEWER UTILITY SERVICE PROVIDER, CITY OF WAUKEE, AND THE OWNER PRIOR TO CONSTRUCTION. P. CONTRACTOR TO COORDINATE NATURAL GAS, ELECTRICAL, TELEPHONE AND ANY OTHER FRANCHISE UTILITY SERVICES WITH PERMIT IS REQUIRED FOR THIS PROJECT. OF CONSTRUCTION. GRADING AND SOIL EROSION CONTROL CODE REQUIREMENTS SHALL BE MET BY CONTRACTOR. A COSESCO CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR MAINTAINING ANY EXISTING EROSION CONTROL MEASURES ON SITE AT THE TIME O. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING EROSION AND SEDIMENT CONTROL MEASURES AS NECESSARY. N. THE ADJUSTMENT OF ANY EXISTING UTILITY APPURTENANCES TO FINAL GRADE IS CONSIDERED INCIDENTAL TO THE SITE WORK. CAUSED BY CONSTRUCTION ACTIVITIES AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT. M. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS, AND SIDEWALKS UNLESS OTHERWISE NOTED. L. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF PAVING SLAB (GUTTER), MEET SUDAS SPECIFICATIONS SECTION 2010 FOR TOPSOIL. K. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO FINISH GRADES TO PROJECT TO AN APPROVED OFF-SITE WASTE SITE. J. CONTRACTOR TO LOAD AND TRANSPORT ALL MATERIALS CONSIDERED TO BE UNDESIRABLE TO BE INCORPORATED INTO THE ORDER TO MEET THE CITY OF WAUKEE STANDARDS. FOR APPROVAL OF ANY CHANGES AND THAT ANY CHANGES COMPLETED WITHOUT APPROVAL ARE SUBJECT TO REMOVAL IN BE RESPONSIBLE FOR LAYOUT VERIFICATION OF ALL SITE IMPROVEMENTS PRIOR TO CONSTRUCTION. CONTACT CITY OF WAUKEE CONDITIONS ARE TO BE REPORTED TO THE ARCHITECT/ENGINEER PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL DESIGN. DEVIATIONS MAY BE NECESSARY IN THE FIELD. ANY SUCH CHANGES OR CONFLICTS BETWEEN THIS PLAN AND FIELD I. DIMENSIONS, BUILDING LOCATION, UTILITIES AND GRADING OF THIS SITE ARE BASED ON AVAILABLE INFORMATION AT THE TIME OF THE AS-BUILT DOCUMENTS. H. ALL FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE RECONNECTED OR REPAIRED AND NOTED ACCORDINGLY ON GOVERN. G. IN THE EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED PLANS SHALL MAXIMUM DENSITY. F. CONSTRUCT MANHOLES AND APPURTENANCES AS WORK PROGRESSES. BACKFILL WITH SUITABLE MATERIAL AND COMPACT TO 95% HOLIDAY WORK. THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT AT LEAST 48 HOURS PRIOR TO ANY PLANNED WEEKEND OR E. NOTIFY OWNER, ENGINEER, CITY OF WAUKEE AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. CONTRACTOR SHALL ALSO NOTIFY NOTIFY THE CITY OF WAUKEE AT LEAST ONE WEEK PRIOR TO ANY ANTICIPATED LANE CLOSURE. BE PROVIDED. FLAGGERS SHALL CONFORM TO THE MUTCD IN APPEARANCE, EQUIPMENT AND ACTIONS. THE CONTRACTOR SHALL TRAFFIC CONTROL DEVICES (MUTCD). WHEN CONSTRUCTION ACTIVITIES OBSTRUCT PORTIONS OF THE ROADWAY, FLAGGERS SHALL D. ALL TRAFFIC CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM C. LENGTH OF UTILITIES SHOWN ON PLANS ARE DIMENSIONED FROM CENTERLINE OF STRUCTURE TO CENTERLINE OF STRUCTURE. PUBLIC IMPROVEMENTS, STATEWIDE URBAN DESIGN AND SPECIFICATIONS AND THE SOILS REPORTS PREPARED BY OTHERS. B. CONSTRUCTION OF ALL STREET AND UTILITY IMPROVEMENTS SHALL CONFORM TO THE WAUKEE STANDARD SPECIFICATIONS FOR AT THE CONTRACTOR'S EXPENSE. TO UTILITY ITEMS NOT SHOWN FOR REMOVAL OR MODIFICATION SHALL BE REPAIRED TO THE UTILITY OWNER'S SPECIFICATIONS OF ALL UTILITIES. PROTECT ALL UTILITY LINES AND STRUCTURES NOT SHOWN FOR REMOVAL OR MODIFICATION. ANY DAMAGES NECESSARY DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT LOCATION, AND DEPTH A. NOTIFY UTILITY PROVIDERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES AND COORDINATE WITH UTILITY PROVIDERS AS CONTROL POINTS CP3 CP1 CP7 IARTN DERIVED - US SURVEY FEET IOWA STATE PLANE SOUTH COORDINATE SYSTEM FND CUT "X" SE CORNER NW1/4, NE1/4 N=592,523.500 E=1,542,624.778 FND CUT "X" NE CORNER NE1/4, NE1/4 N=593,842.092 E=1,543,951.621 FND CUT "X" NE CORNER SE1/4, NE1/4 N=592,524.860 E=1,543,944.6378 26 28 29 20 21 22 23 24 25 27 30 NE ADDISON DR.ST SS 4 6 3 NE DELLWOOD DRIVE NE ALICE'S ROADCREEK PLAT 4LANDING AT SHADOW NE OLIVIA LANE (Private)(Private)NE MACEY WAY(Private) NE LANDON LANE (Private)NE CONNER COURT2 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP03_1151084_DIM.dgn8/23/20163:28:11 PMSnyder1:40pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNER1 2 3 4 5 6 7 9 8 11 12 10 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 13 14 15 16 17 18 19 20 45 46 47 48 49 50 51 52 53 54 55565758 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 LOT 33 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1352SF 1352SF 1352SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 2267SF 1248SF 1248SF 1352SF 1352SF 30' Building Setback Line30' Building Setback Line30' Building Setback Line30' Building Setback Line 33' Ingress/egress Easement 10' Public Utility Easement 10' Public Utility Easement10' Public Utility Easement33' Ingress/egress Easement33' Ingress/egress Easement10' Public Utility Easement10' Public Utility Easement10' Public Utility Easement 15' Water Main Easement25' Landscape Buffer EasementLOT 34and Private Sanitary Sewer Easement 43' Ingress/Egress, Private Water Main, (Private) 20' Storm Sewer Easement Existing 16.50' Telephone EasementExisting 20' Underground Electric Line EasementExisting 93' Over Head Electric Line Easement0 SCALE (FEET) 40 1"R 2"R 3"4.5" NOT TO SCALE 6" STANDARD CURB NOT TO SCALE3 1 3 2 3" ROLL CURB 2.0% MAX 5' DELINEATE SIDEWALK BACK OF BURB TO CUT JOINT 5' OFF 2"R 3" DROP CURB 10.5" 1"R 7"PCC4" MIN. 7.5" NOTES 2' Min (95% Compaction) (Proof. roll as per soils report) 25' 3" Rolled Curb NOT TO SCALE 7" P.C.C. 2% TYPICAL PRIVATE STREET CROSS SECTION 3 3 1.5% 5' PCC Sidewalk 4" MIN. (0% to +4% of Optimum Moisture Content) 12" Prepared Subgrade Compacted DIMENSION PLAN CONSTRUCTION NOTES LOT ADDRESS5.0'25.0'18.0'25.0' 2 5 .0 'R25.0'R 5.5'R 5.5'R 2 5. 0'R25.0'R25.0'R2 5.0'R25.0'R25.0'R25.0'R 18.0 '9.5'9.0'9.5'30.0'18.0'5.0'25.0'5' PCC Sidewalk 4" MIN. 1.5% 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 74 73 72 71 70 69 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 3" ROLL CURBSCALE 1"=20' TYPICAL UNIT DETAIL 9.5'9.0'5.0'24.0'52.0'52.0'24.0' 52 .0 '24.0'52.0'24.0' 52.0'24.0' 52.0 '24.0'52 .0 '24.0'52 .0 '24.0'52.0'24.0'52.0'24.0'TYP15.0'TYP15.0'23 .7 '27.1'TYP15.0'TYP15.0'TYP15.0'TYP15.0'TYP15.0'TYP15.0'TYP15.0'187.5'R 212.5'R 212.5'R 187.5'R 36.3' TYP36.3' TYP36.3' TYP36.3' TYP36.3' TYP 36.3' TYP36.3' TYP24.0'52.0'PRIVATE DRIVE3" ROLL CURB5' SIDEWALK5. REBAR SHALL BE NON-EPOXY COATED STEEL AS PER THE STANDARD SPECIFICATIONS. 4. CURING AS SPECIFIED FOR CONCRETE PAVEMENT IN THE STANDARD SPECIFICATIONS. 3. FINISH SHALL CONFORM TO STANDARD SPECIFICATIONS FOR SIDEWALKS AND PROVIDE FINAL BROOM FINISH. TOPSOIL OVER ALL AREAS DISTURBED. 2. CONCRETE WILL HAVE THE MIX DESIGN AS SHOWN FOR STREET PAVEMENT IN THE CONSTRUCTION. PLACE 1. SUBGRADE SHALL CONSIST OF A FIRM UNYIELDING CLAY (CL OR CH) OR CLASS "A" ROADSTONE BASE.DIMENSION PLAN3 340'9.5'9.0'8.0'842 NE LANDON LANE 832 NE LANDON LANE 822 NE LANDON LANE 812 NE LANDON LANE 802 NE LANDON LANE 703 NE MACEY WAY 707 NE MACEY WAY 713 NE MACEY WAY 717 NE MACEY WAY 723 NE MACEY WAY 727 NE MACEY WAY 733 NE MACEY WAY 737 NE MACEY WAY 743 NE MACEY WAY 747 NE MACEY WAY 753 NE MACEY WAY 757 NE MACEY WAY 763 NE MACEY WAY 767 NE MACEY WAY 773 NE MACEY WAY 777 NE MACEY WAY 783 NE MACEY WAY 787 NE MACEY WAY 793 NE MACEY WAY 797 NE MACEY WAY 763 NE CONNER COURT 767 NE CONNER COURT 773 NE CONNER COURT 777 NE CONNER COURT 798 NE CONNER COURT 794 NE CONNER COURT 788 NE CONNER COURT 784 NE CONNER COURT 778 NE CONNER COURT 774 NE CONNER COURT 768 NE CONNER COURT 764 NE CONNER COURT 758 NE CONNER COURT 754 NE CONNER COURT 748 NE CONNER COURT 744 NE CONNER COURT 738 NE CONNER COURT 734 NE CONNER COURT 728 NE CONNER COURT 724 NE CONNER COURT 718 NE CONNER COURT 714 NE CONNER COURT 708 NE CONNER COURT 704 NE CONNER COURT 852 NE LANDON LANE 798 NE MACEY WAY 794 NE MACEY WAY 788 NE MACEY WAY 784 NE MACEY WAY 778 NE MACEY WAY 774 NE MACEY WAY 768 NE MACEY WAY 764 NE MACEY WAY 758 NE MACEY WAY 754 NE MACEY WAY 748 NE MACEY WAY 744 NE MACEY WAY 738 NE MACEY WAY 734 NE MACEY WAY 728 NE MACEY WAY 724 NE MACEY WAY 817 NE LANDON LANE 827 NE LANDON LANE 837 NE LANDON LANE 847 NE LANDON LANE 743 NE CONNER COURT 747 NE CONNER COURT 753 NE CONNER COURT 757 NE CONNER COURT 2A 2A 2A 2A 2A 2A 2A 2A 2D 2D 2D 2D 2D 2C 2E 2C 2I 2I 2C 2C 2I 2I 2C 2D 3A 3A 3A 3A 2F 2F 2F2F 2F 2F 2B 2B 2J 2J 2B 2B2B 2B2B 2B 2B 2D 2H 2H 2H 2H 2H 2H 2H 2H 2F 2H 2H TYP TYP TYP TYP TYP TYP TYP TYP TYP 2H TYP TYP 4 4 4 2J 2M 2G 7"PCC 7"PCC 7"PCC 7"PCC 7"PCC7"PCC7"PCC7"PCC7"PCC7"PCC6"PCC 6"PCC6"PCC6"PCC2L 2L 2F FUTURE TRAILFUTURE TRAILFUTURE TRAIL2K 2K9" PCC9" PCC9" PCC 1/2 ROW35' 5' SIDEWALK5' SIDEWALK 5' SIDEWALK 2N 2N 5B 5B B. STOP SIGN AS PER THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND APPLICABLE CITY SPECIFICATIONS. FOOTING. STANDARDS. SECURE SIGN TO 2" SQUARE STEEL CHANNEL POST WITH ENAMEL FINISH IN A 12" DIAMETER CONCRETE A. BLUE, SIGN WITH DISABLED SYMBOL READING "PARKING ONLY" AND "$200 FINE FOR IMPROPER USE" AS PER ADAAG 5. SIGNAGE, PROVIDE THE FOLLOWING: 4. MODULAR BLOCK RETAINING WALL. SEE DETAIL SHEET 9 OF 12. C. PAINTED STATE OF IOWA APPROVED DISABLED SYMBOL. B. 45° STRIPING AT 3' ON CENTER SPACING WHERE SHOWN. A. PAINTED PARKING STALL LINE, 4" WIDE, PAINTED YELLOW. 3. PAVEMENT MARKINGS, PROVIDE THE FOLLOWING: MAINLINE PAVING PROVIDE SUDAS TYPE "A" SECTION 7030.101 DRIVE APPROACH. MAINLINE PAVING OF DELLWOOD DRIVE. IN THE EVENT THE DRIVE APPROACH CAN NOT BE CONSTRUCTED WITH THE M. COORDINATE CONSTRUCTION OF THE SHARED DRIVE APPROACH ON DELLWOOD DRIVE WITH THE CONSTRUCTION FOR THE DENSITY. REQUIRED IN DELLWOOD DRIVE AND NE ALICES ROAD ROW. L. 9" DEPTH C-4 MIX PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR K. TURN LANE SEE SHEET 12 FOR DETAILS. J. 8" PCC, 5'X10' CLUSTER MAIL BOX PAD. SEE DETAIL SHEET 9 OF 10. I. 6" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY. H. 5" PCC DRIVEWAY DETAILS. G. PROVIDE FULL DEPTH SAW-CUT AND REMOVE 6" OF PAVEMENT ALONG ALICE'S RD FOR PAVING TIE-IN. SEE SHEET 12 FOR F. PEDESTRIAN RAMP WITH MAXIMUM SLOPE OF 8.33%. PROVIDE DETECTABLE WARNING PANELS WHERE SHOWN. E. TAPER FROM FULL 6" CURB TO 3" ROLL CURB WHERE NOTED.. D. 3" PCC ROLL CURB. C. 6" PCC STANDARD CURB. B. 4" MINIMUM DEPTH PCC SIDEWALK ON 6" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY. A. 7" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY. 2. PAVEMENTS, PROVIDE THE FOLLOWING: B. EXISTING PAVEMENT. COVER REQUIREMENTS PRIOR TO CONSTRUCTION. A. EXISTING UTILITY. ADJUST AS NECESSARY TO ALLOW FOR CONSTRUCTION. VERIFY LOCATION, ELEVATION AND MINIMUM 1. PROTECT THE FOLLOWING SITE FEATURES: 20.0' 20.0'20.0'36.3' TYP9.5'9.5'15.8'2F 2F 36.3' TYP20.0'20.0'36.3' TYP 20.0'5.0'R 5. 0'R20 .0 '20 .0 '5.0'25.0' 25.0'5.0' 5.0' 5.0' 25.0' 5 .0 '25 .0 '20 .0 '20.9' 2E2E 2E 2E 5.0'20.0'36.3'25.0'2.0'20.0'36.3'2.0' 52.0'24.0'26.0'6.0'6.0'6.0'6.0'52.0'24.0'5.5'R5.5'R 1/2 ROW 60' 17.3'32.3'5.0'13.0'32.9'34.3'15.5'36.3'32.5 '31.2'34 .6 '36 .1 '34.3'5.0' 1 2 3 4 5 6 7 9 8 11 12 10 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 13 14 15 16 17 18 19 20 45 46 47 48 49 50 51 52 53 54 55565758 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 30' Building Setback Line30' Building Setback Line30' Building Setback Line30' Building Setback Line 15' Water Main Easement25' Landscape Buffer Easement(Private) 20' Storm Sewer Easement Existing 16.50' Telephone EasementExisting 20' Underground Electric Line EasementExisting 93' Over Head Electric Line Easement26 28 29 20 21 22 23 24 25 27 30 NE ADDISON DR.ST SS 4 6 3 STST ST ST STST8"W8"W 8"W8"W EXISTING 12" W8"W ST ST S TST STST ST ST STSTSTSTSTSTSTSTSTSTSTST EXISTING 8" W NE DELLWOOD DRIVE NE ALICE'S ROAD8"W8"W150' HYDRANT COVERAGE150' HYDRANT COVERAGE 150' HYDRANT COVERAGE150' HYDRANT COVERAGE 150' HYDRANT COVERAGE 150' H Y D R A N T C O V E R A G E8"WCREEK PLAT 4LANDING AT SHADOW EXISTING 150' HYDRANT COVERAGE 150' HYDRANT COVERAGE150' H Y D R A NT C O V E R A G E 150' HYDRANT COVERAGE STNE OLIVIA LANE (Private)(Private)NE MACEY WAY(Private) NE LANDON LANE (Private)NE CONNER COURTST EXISTING 12" W2 150' HYDRANT COVERAGE BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP04_1151084_SAN.dgn8/23/20163:28:15 PMSnyder1:40pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNERUTILITY PLAN CONSTRUCTION NOTES GENERAL CONSTRUCTION NOTES TESTED AND DECHLORINATED. E. ALL WATERMAIN SHALL BE PRESSURE AND BACTERIA D. ALL SANITARY MANHOLES TO BE VACUUM TESTED. MANHOLES SHALL BE VACUUM TESTED. SHALL BE PROVIDED TO THE CITY OF WAUKEE. ALL SANITARY SEWER ALL CLEANING AND TELEVISING. COPIES OF THE REPORT AND VIDEO TELEVISED PRIOR TO PAVING. THE CITY OF WAUKEE SHALL WITNESS C. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND DEPARTMENT. TIE-INS SHALL BE WITNESSED BY THE CITY OF WAUKEE ENGINEERING SPECIFICATION FOR PUBLIC IMPROVEMENTS AND ANY TESTING OR B. ALL UTILITIES SHALL BE TESTED TO THE CITY OF WAUKEE STANDARD CONNECTING TO ANY PUBLIC UTILITY. A. NOTIFY THE CITY OF WAUKEE AT LEAST 48 HRS PRIOR TO 1 2 SECTION A-A Adjustment Ring Pavement PCC 5'-0" 6"6" 'BT-2' Joint 'BT-1', or 'KT-1', 'KT-2', 'BT-2' Joint 'BT-1', or 'KT-1', 'KT-2', construct as detailed in Section A-A for three-piece floating casting. D or SW-602 Type F). If a boxout is provided for a three-piece casting, No boxout is required for three-piece floating castings (SW 601 Type B and 4 foot 8 inch (typ.) #4 bar. Place at mid-slab. (SW 601 Type A and C or SW-602 Type E) is used. Type B and D or SW-602 Type F) is used. 'E' joint if two-piece fixed casting 'KT-1', 'KT-2', 'BT-1', or 'BT-2' joint if three-piece floating casting (SW 601 3 2 2 3 (For three-piece floating casting) 2 2 2 1 2 1 JointLongitudinal5'-0" Joint 'C' or 'CD'AA4 4WATERMAIN AND SANITARY SEWER PLAN97 LF OF 8" SANITARY SEWER @ 2.0% INV=995.51 VERIFY PRIOR TO CONSTRUCTION CONNECT TO EXISTING SANITARY 186 LF OF 8" SANITARY SEWER @ 1.0%242 LF OF 8" SANITARY SEWER @ 1.0%236 LF OF 8" SANITARY SEWER @ 1.0%200 LF OF 8" SANITARY SEWER @ 1.0%140 LF OF 8" SANITARY SEWER @ 2.0%395 LF OF 8" SANITARY SEWER @ 1.0%INV=999.41(OUT-W) INV=999.51(IN-S) RIM=1010.02 MANHOLE NO. 2 SEWER @ 1.0%65 LF OF 8" SANITARY INV=997.45(OUT-W) INV=997.55(IN-SW) INV=997.55(IN-E) RIM=1010.34 MANHOLE NO. 1 INV=1001.50(OUT-NE) INV=1001.60(IN-SE) RIM=1013.20 MANHOLE NO. 7 INV=1004.40(OUT-NW) RIM=1016.55 MANHOLE NO. 8 INV=1001.93(OUT-N) INV=1002.03(IN-S) RIM=1010.53 MANHOLE NO. 3 INV=1004.39(OUT-N) INV=1004.49(IN-S) INV=1004.49(IN-W) RIM=1013.65 MANHOLE NO. 4 INV=1005.14(OUT-N) RIM=1014.52 MANHOLE NO. 5 INV=1006.49(OUT-W) RIM=1014.25 MANHOLE NO. 6 SCALE 1"=20' TYPICAL SERVICE DETAIL NOTE: SEE SPECIFIC UNITS FOR INDIVIDUAL SERVICE LOCATIONS Existing Sanitary Sewer Easement 0 SCALE (FEET) 40 TP=1002.15(WAT) BP=1003.67(ST) TP=999.68(SAN) BP=1003.75(ST) TP=1000.05(SAN) BP=1003.47(WAT) TP=1003.25(WAT) BP=1005.06(ST) TP=1001.23(SAN) BP=1005.24(ST) TP=997.86(SAN) BP=1003.75(WAT) TP=1006.25(WAT) BP=1007.84(ST) TP=1005.52(SAN) BP=1007.13(WAT) TP=1005.42(SAN) BP=1007.85(ST) TP=1004.01(SAN) BP=1008.50(WAT) TP=1007.13(SAN) BP=1008.82(ST) TP=1008.39(WAT) BP=1009.89(ST) TP=1006.68(WAT) BP=1008.18(ST) TP=1000.97(SAN) BP=1008.08(ST) 2B 3C TYP 3C 2B 2B 3C TYP 3C 2B TYP 2B 3C TYP 3C 2B TYP TYP 3C 2B 2B 3C TYP 3C 2B TYP 2B 3C TYP TYP 3C 2B TYP 3A 3A3B 3D 3D 3D 3B 3B 3B 3D 3D 3B 3B 3D 3F 3F 3F3F 2A 3E 3E 3E 3E 6 6 6 6 6 6 6 6 6 6 6 6 6 6 8" SANITARY SEWERPRIVATE DRIVE3" ROLL CURB3" ROLL CURB8" WATER MAIN12.0' 15.0'1.5'1.5'1.5'12.0' 15.0'1.5'1.5'1.5'1.5'1.5'1.5'12.0' 15.0'1.5'1.5'12.0' 7.0' 15.0'1.5'1.5'1.5'1.5'15.0' 12.0'1.5'1.5'1.5'15.0' 12.0'8" WATER MAIN6. CRITICAL CROSSING. CONTRACTOR TO VERIFY ALL CROSSINGS AND PROVIDE 18" MINIMUM SEPARATION. SHEET 5. 5. PROVIDE STORM SEWER IMPROVEMENTS AS SHOWN ON THE PLANS AS PER CITY OF WAUKEE STANDARDS. SEE DESIGN INFORMATION AND COORDINATE UTILITY CONNECTIONS ACCORDINGLY. PRIOR TO CONSTRUCTION. SEE ARCHITECTURAL AND MECHANICAL PLANS FOR INTERIOR UTILITY ROUTING,METERS, 4. COORDINATE NATURAL GAS AND ELECTRICAL SERVICES AND METER LOCATION WITH UTILITY SERVICE PROVIDER SERVICE SHALL BE TYPE "K" SEAMLESS, SOFT ANNEALED COPPER WATER TUBE. G. INSTALL WATER SERVICE AS PER CITY OF WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS. F. 8" TEE. E. 8" VALVE. D. HYDRANT ASSEMBLY WITH STORZ FITTINGS. C. 1" WATER SERVICE WITH CURB STOP. B. 8" PVC-C900 WATER MAIN WITH FITTINGS AND BENDS AS NECESSARY. MINIMUM 5.5' DEEP. TO VERIFY PRIOR TO CONSTRUCTION. A. CONNECTION TO EXISTING WATER MAIN STUB PROVIDED BY LANDING AT SHADOW CREEK PLAT 4. CONTRACTOR 3. PRIVATE WATER SERVICE. PROVIDE THE FOLLOWING AS PER CITY OF WAUKEE STANDARDS. IMPROVEMENTS. SERVICE SHALL BE PVC, SDR 23.5. D. INSTALL SANITARY SEWER SERVICE PER CITY OF WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC NECESSARY. C.SANITARY SEWER SERVICE TO BE -6.0' FROM FINISHED GRADE. CONTRACTOR TO PROVIDE RISER AT MAIN AS B. 4" SANITARY SEWER SERVICE LINE (PVC SDR 23.50) AT MINIMUM 2.0%. CONTRACTOR TO VERIFY PRIOR TO CONSTRUCTION. A. CONNECT TO EXISTING SANITARY SEWER STUB PROVIDED BY LANDING AT SHADOW CREEK PLAT 4. 2. PRIVATE SANITARY SEWER SERVICE. UTILITY OWNER'S SPECIFICATIONS. DEMOLITION SHALL BE REMEDIED AT THE CONTRACTOR'S EXPENSE WITH THE WORK BEING PERFORMED TO THE A. EXISTING UTILITIES. ANY DAMAGES TO EXISTING UTILITIES THAT ARE NOT SCHEDULED FOR MODIFICATION OR 1. EXISTING FEATURES, PROTECT THE FOLLOWING: 10051005 10051006 1006 1006 10061007 1007 100710071007 100710071008 1008 10081008100810081008100810081009 1009 100910091009100910091009100910091009 10091010 101010101010 1 0 1 0 101010101010 1010 10101010 10 10 1010101010111011 1 0 1 1 101110111011 1011 101110111 0 1 1 1011 1011 101110111011101110111011 1012 10 1210121 0 1 2 101210121012101210121012 1012 1013 1 0 1 3 1013101310131013 1013 1013 10141014 1014 1014 1014 101410141 0 1 41014 1014 1014 10141014 10141015 101510151 0 1 5 1015 10151016 101610161 0 1 6 10161016 1017 1018 1019 26 28 29 20 21 22 23 24 25 27NE ADDISON DR.SS BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP05_1151084_STM.dgn8/23/20163:28:20 PMSnyder1:40pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNER1 2 3 4 5 6 7 9 8 11 12 10 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 13 14 15 16 17 18 19 20 45 46 47 48 49 50 51 52 53 54 55565758 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 30' Building Setback Line30' Building Setback Line30' Building Setback Line30' Building Setback Line 15' Water Main Easement25' Landscape Buffer Easement(Private) 20' Storm Sewer Easement Existing 16.50' Telephone EasementExisting 20' Underground Electric Line EasementExisting 93' Over Head Electric Line Easement4 6 3 8"S8"S8"S 8"S8"S8"S8"S 8"S 8"W8"W 8"W8"W EXISTING 12" W8"W EXISTING 8" W NE DELLWOOD DRIVE NE ALICE'S ROAD8"W8"W8"WNE OLIVIA LANE (Private)(Private)NE MACEY WAY(Private) NE LANDON LANE (Private)NE CONNER COURT EXISTING 12" W2 UTILITY PLAN CONSTRUCTION NOTES 0 SCALE (FEET) 40 5 STORM SEWER PLAN5100 LF OF 24" RCP @ 0.83% 108 LF OF 15" RCP @ 0.57% 159 LF OF 15" RCP @ 0.50% 100 LF OF 12" PVC @ 0.50% RCP @ 0.5% 25 LF OF 30" 80 LF OF 15" RCP @ 0.50%80 LF OF 12" RCP @ 1.0%83 LF OF 15" RCP @ 0.5%77 LF OF 15" RCP @ 1.0%50 LF OF 12" PVC @ 1.0% 50 LF OF 12" PVC @ 1.0% 25 LF OF 12" PVC @ 1.0% 60 LF OF 12" RCP @ 1.0%85 LF OF 18" RCP @ 0.57%173 LF OF 18" RCP @ 0.85%INV=1008.15(OUT-NE) INV=1008.25(IN-S) INV=1008.25(IN-W) RIM=1011.58 TYP SW-401 ST-16A, MANHOLE INV=1008.38(OUT-N) INV=1008.48(IN-S) RIM=1011.40 W/ DOME GRATE NYLOPLAST BASIN ST-15, INTAKE, TYP 12" 105 LF OF 12" PVC @ 0.50%INV=1009.00(OUT-N) INV=1009.10(IN-S) RIM=1012.50 W/ DOME GRATE NYLOPLAST BASIN ST-14, INTAKE, TYP 12" INV=1009.60(OUT-N) INV=1009.70(IN-S) RIM=1013.95 TYP SW-401 ST-13A, MANHOLE INV=1010.20(OUT-N) RIM=1013.70 W/ DOME GRATE NYLOPLAST BASIN ST-13, INTAKE, TYP 15" 159 LF OF 24" RCP @ 0.75%138 LF OF 24" RCP @ 0.50%INV=1007.36(OUT-N) INV=1007.46(IN-S) T/C=1011.30 W/ TYPE Q GRATE ST-9, INTAKE, TYP SW-502 INV=1008.76(OUT-E) INV=1008.86(IN-SW) T/C=1013.55 W/ TYPE Q GRATE ST-3, INTAKE, TYP SW-501 104 LF OF 12" RCP @ 0.50%RCP @ 0.5% 29 LF OF 30" 75 LF OF 8" PVC @ 1.0% 75 LF OF 8" PVC @ 1.0%75 LF OF 8" PVC @ 1.0% 40 LF OF 8" PVC @ 1.0% 36 LF OF 8" PVC @ 1.0% INV=1010.36(OUT-NE) RIM=1015.75 W/ DOME GRATE NYLOPLAST BASIN ST-1, INTAKE, TYP 12" INV=1009.46(OUT-NE) INV=1009.56(IN-SW) RIM=1013.00 W/ DOME GRATE NYLOPLAST BASIN ST-2, INTAKE, TYP 12" INV=1010.18(OUT-E) RIM=1013.65 W/ DOME GRATE NYLOPLAST BASIN ST-4, INTAKE, TYP 12" INV=1009.33(OUT-E) INV=1009.43(IN-W) RIM=1013.35 W/ DOME GRATE NYLOPLAST BASIN ST-5, INTAKE, TYP 12" INV=1010.29(OUT-S) RIM=1013.35 W/ DOME GRATE NYLOPLAST BASIN ST-6, INTAKE, TYP 12" INV=1009.79(OUT-W) INV=1009.89(IN-N) RIM=1014.10 TYP SW-401 ST-6A, MANHOLE INV=1009.33(OUT-W) INV=1009.43(IN-E) RIM=1013.35 W/ DOME GRATE NYLOPLAST BASIN ST-7, INTAKE, TYP 12" INV=1008.48(OUT-N) INV=1008.58(IN-E) INV=1008.58(IN-W) RIM=1013.35 W/ DOME GRATE NYLOPLAST BASIN ST-8, INTAKE, TYP 15" INV=1007.86(OUT-N) INV=1007.96(IN-W) INV=1007.96(IN-S) RIM=1013.15 TYP SW-401 ST-8A, MANHOLE INV=1006.57(OUT-N) INV=1006.67(IN-S) T/C=1010.48 W/ TYPE Q GRATE ST-10, INTAKE, TYP SW-502 FL=1006.00 FOOTING & APRON GUARD ST-11, 15" F.E.S. W/ INV=1005.28(OUT-W) INV=1005.38(IN-E) INV=1005.38(IN-S) T/C=1009.60 W/ TYPE Q GRATE ST-12, INTAKE, TYP SW-503 INV=1008.67(OUT-N) T/C=1012.00 W/ TYPE Q GRATE ST-16, INTAKE, TYP SW-501 INV=1007.28(OUT-NE) INV=1007.38(IN-SW) T/C=1010.63 W/ TYPE Q GRATE ST-17, INTAKE, TYP SW-501 INV=1004.78(OUT-S) INV=1004.88(IN-W) T/C=1009.25 W/ TYPE Q GRATE ST-18, INTAKE, TYP SW-502 CONCRETE FILLET INSIDE INTAKES AS NECESSARY TO FLOW LINES. 5. ALL FOOTINGS FOR STORM SEWER STRUCTURES SHALL BE A MINIMUM 42 INCHES BELOW FINISHED GRADE. INCLUDE FLARED END SECTION. 4. ALL STORM SEWER PIPE LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE AND 3. CRITICAL CROSSING. CONTRACTOR TO VERIFY ALL CROSSINGS AND PROVIDE 18" MINIMUM SEPARATION. 2. PROVIDE STORM SEWER IMPROVEMENTS AS SHOWN AS PER CITY OF WAUKEE STANDARDS. UTILITY OWNER'S SPECIFICATIONS. DEMOLITION SHALL BE REMEDIED AT THE CONTRACTOR'S EXPENSE WITH THE WORK BEING PERFORMED TO THE A. EXISTING UTILITIES. ANY DAMAGES TO EXISTING UTILITIES THAT ARE NOT SCHEDULED FOR MODIFICATION OR 1. EXISTING FEATURES, PROTECT THE FOLLOWING: FL=1004.63 11'X12' TRM FOOTING, 4'X8' FTM & ST-18A, 30" F.E.S. W/ FL=1005.15 11'X12' TRM FOOTING, 4'X8' FTM & ST-12A, 30" F.E.S. W/ (MATCH EXISTING GRADES WITH POSITIVE DRAINAGE TO THE NORTH) FL=1003.67 11'X12' TRM FOOTING, 4'X8' FTM & ST-19A, 18" F.E.S. W/ INV=1008.75(OUT-E) INV=1008.85(IN-S) RIM=1011.60 W/ SOLID LID TYP 15" NYLOPLAST BASIN ST-15A, MANHOLE FL=1005.20 FOOTING & APRON GUARD ST-21, 18" F.E.S. W/ FL=1004.20 11'X12' TRM FOOTING, 4'X8' FTM ST-21A, 18" F.E.S. W/ 100 LF OF 18" RCP @ 1.0%100 YEAR=1009.34 INV=1005.71(OUT-E) INV=1005.81(IN-SW,W) RIM=1010.19 TYP SW-401 ST-17A, MANHOLE 112 LF OF 12" RCP @ 1.06% FL=1007.00 FOOTING & APRON GUARD ST-20, 12" F.E.S. W/ FL=1004.15 ORIFICE PLATE W/ 11-13/16" DIA FOOTING & APRON GUARD ST-19, 18" F.E.S. W/ 100 YEAR=1009.34 100 YEAR=1009.34 AND UNDERGROUND ELECTRIC DISTRIBUTION LINE PRIOR TO CONSTRUCTION INSTALLATION AND CRITICAL CROSSINGS OF EXISTING WATER MAIN CONTRACTOR TO VERIFY LOCATION AND ELEVATION AND COORDINATE AND UNDERGROUND ELECTRIC DISTRIBUTION LINE PRIOR TO CONSTRUCTION INSTALLATION AND CRITICAL CROSSINGS OF EXISTING WATER MAIN CONTRACTOR TO VERIFY LOCATION AND ELEVATION AND COORDINATE Q=7.51 CFS LITTLE WALNUT CREEK WATERSHED DISCHARGE LOCATION TO THE 26 28 29 20 21 22 23 24 25 27 30 NE ADDISON DR.1007 ST 1008 1008 10081008 10081008 S 1009 1009 1 0 0 9 10091009 1009S 1010 1010 10101 0 1 0 10101010 1010 1011 101110111 0 1 1 10111011 1011 1012 101210121 0 1 2 10121012 1012 1013 10131 0 1 3 10131013 1013 10141 0 1 4 10141014 1014 1014 101510151015 1015 1015 1016 1016 10161016 1016 1016 10171017 1017 1017 1017 1018 1 0 1 8 10181018 1018 1018 1 0 1 91019 1019 1019 1019 10201020 1020 1020 1020 1021 1021 1021 1021 1022 1022 1 2 3 4 5 6 7 9 8 11 12 10 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 13 14 15 16 17 18 19 20 45 46 47 48 49 50 51 52 53 54 55565758 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 F.F.E.=1014.10F.F.E.=1012.90F.F.E.=1012.00F.F.E.=1016.92F.F.E.=1015.10 F.F.E.=1014.70F.F.E.=1014.25F.F.E.=1012.80F.F.E.=1011.70F.F.E.=1011.50F.F.E.=1011.70F.F.E.=1013.10F.F.E.=1015.25F.F.E.=1012.15F.F.E.=1011.3030' Building Setback Line30' Building Setback Line30' Building Setback Line30' Building Setback Line 15' Water Main Easement25' Landscape Buffer Easement(Private) 20' Storm Sewer Easement Existing 16.50' Telephone EasementExisting 20' Underground Electric Line EasementExisting 93' Over Head Electric Line Easement4 6 3 STST ST ST STST8"S8"S8"S 8"S8"S8"S8"S 8"S 8"W8"W 8"W8"W EXISTING 12" W8"W ST ST S TST STST ST ST STSTSTSTSTSTSTSTSTSTSTST EXISTING 8" W NE DELLWOOD DRIVE NE ALICE'S ROAD8"W8"W8"WCREEK PLAT 4LANDING AT SHADOW STNE OLIVIA LANE (Private)(Private)NE MACEY WAY(Private) NE LANDON LANE (Private)NE CONNER COURTST EXISTING 12" W2 1004.15 10051005 10051006 1006 1006 1006.00 LP 10061007 1007 100710071007 100710071007.00 1008 1008 10081008100810081008100810081009 1009 1009100910091009100910091009.00 LP 100910091009 10091009.33 OVERFLOW HP 1009.35 LP 1009.50 1009.50 OVERFLOW 1009.50 OVERFLOW 1009.50 OVERFLOW HP 1009.65 1009.68 OVERFLOW 1009.85 1009.90 1009.91 1009.95 HP 1009.99 1010 101010101010 1 0 1 0 101010101010 1010 10101010 10 10 10101010.00 OVERFLOW 10101010.02 1010.14 1010.15G 1010.65TC 1010.19 1010.23 LP 1010.23 1010.30 1010.35G 1010.85TC 1010.36 1010.38 LP 1010.40 1010.44 1010.45 1010.49 1010.50 HP 1010.60 1010.64 1010.67 1010.69 1010.73 1010.73 OVERFLOW HP 1010.75 1010.87 1010.88 1010.90 1010.93 10111011 1 0 1 1 101110111011 1011 101110111 0 1 1 1011 1011 10111011101110111011.00 10111011 1011.04G 1011.54T/C 1011.06 1011.10 1011.14 OVERFLOW HP 1011.19 1011.20 H.P. 1011.28G 1011.78T/C 1011.30 LP 1011.30 1011.30 1011.30 1011.30 1011.37 1011.38 1011.40 LP 1010.44 1011.47 1011.47 1011.50 1011.50 1011.50 1011.50 1011.50 1011.53 1011.55 1011.55 H.P. 1011.59 1011.60 1011.60 H.P. 1011.60 OVERFLOW HP 1011.61G 1012.11T/C 1011.69 1011.70 1011.70 1011.70 1011.70 1011.70 1011.701011.70 1011.70 1011.70 OVERFLOW HP 1011.70G 1012.20TC 1011.73G 1012.23T/C 1011.75 LP 1011.80 H.P. 1011.81 1011.90 1011.90 1011.90 1011.90 1011.90 1012 10 1210121 0 1 2 101210121012101210121012 1012 1012.10 1012.15 1012.15 1012.15 1012.15 1012.18 1012.25 1012.25 OVERFLOW HP 1012.50 LP 1012.70 H.P. 1012.75 1012.75 1012.80 1012.80 1012.801012.80 1012.80 H.P. 1012.90 1012.90 1012.90 1012.90 1013 1 0 1 3 1013101310131013 1013 1013.00 LP 1013.00 OVERFLOW HP 1013 1013.05 H.P. 1013.10 1013.10 1013.10 1013.10 1013.15 1013.19G 1013.69T/C 1013.20 1013.35 LP 1013.35 LP 1013.35 LP 1013.45 1013.55 LP 1013.60 1013.63 1013.65 1013.65 1013.65 LP 1013.70 LP 1013.70 LP 1013.72 1013.85 1013.89 1013.991 0141014 1014 1014 1014 101410141 0 1 41014 1014 1014 10141014 10141014.00 H.P. 1014.05 1014.10 1014.10 1014.10 1014.10 1014.10 OVERFLOW HP 1014.10 OVERFLOW HP 1014.10 OVERFLOW HP 1014.10 OVERFLOW HP 1014.10 OVERFLOW HP 1014.10 1014.10 HP 1014.15 1014.15 OVERFLOW HP 1014.20 OVERFLOW HP 1014.20 1014.25 1014.25 1014.25 1014.25 1014.27G 1014.77T/C 1014.32 1014.40 1014.57 HP 1014.63G 1015.13T/C 1014.65 1014.701014.70 1014.701014.70 1014.78 1014.90 1014.99 1015 101510151 0 1 5 1015 10151015.101015.10 1015.101015.10 1015.25 1015.25 1015.25 1015.25 1015.50 1015.56 1015.75 LP 1016 101610161 0 1 6 10161016 BW=1014.00 TW=1016.00 1016.36 1016.92 1016.92 1016.92 1016.92 1017 BW=1016.00 TW=1017.00 1018 BW=1014.00 TW=1018.00 1018.73 1018.86 1019 1019.36 1019.36 BW=1017.50 TW=1019.50 BW=1017.50 TW=1020.00 BW=1017.50 TW=1020.00 BW=1016.75 TW=1020.75 BW=1017.00 TW=1021.00 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP06_1151084_GRA.dgn8/23/20163:28:27 PMSnyder1:40pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNER0 SCALE (FEET) 40 6 640'GRADING PLANGRADING PLAN NOTES DRIVEWAYS, AND SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES. 8. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, TO MEET SUDAS SPECIFICATIONS SECTION 2010 FOR TOPSOIL. 7. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD ROUTING, CRITICAL DIMENSIONS, CONNECTIONS, AND INVERT ELEVATIONS. IMPROVEMENTS WITH THE ARCHITECTURAL MECHANICAL/ ELECTRICAL/ PLUMBING SYSTEMS INCLUDING 6. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND COORDINATION OF ALL SITE UTILITIES AND SODDING ARE COMPLETE. PLAN. SILT FENCE AROUND STORM INTAKES SHALL BE MAINTAINED UNTIL PAVING AND SEEDING/ 5. CONTRACTOR SHALL PROVIDE SILT FENCE AROUND ALL STORM INTAKES AND WHERE SHOWN ON THE NOTED. 4. GRADES SHOWN ARE FINISHED GRADE AND/OR TOP OF PAVING SLAB (GUTTER), UNLESS OTHERWISE 3. PRIOR TO GRADING, THE OWNER/ CONTRACTOR SHALL OBTAIN A COSESCO PERMIT. COMPENSATION. REPAIRED BY THE CONTRACTOR TO THE OWNERS SPECIFICATIONS WITHOUT ADDITIONAL 2. PROTECT EXISTING UTILITIES FROM CONSTRUCTION DAMAGE. ANY DAMAGE THAT OCCURS SHALL BE NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES OR RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE 1. UTILITY WARNING: THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/ at outlet. riser for sediment control Provide temporary 90° PVC 1.0% 1.0%1.0% 1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0% 1.0% 1.0% 1.0%1.0%1.0%1.52% 1.52%7.0%6.0%1.67%1.67%1.0%1.0%1.67%1.67%1.67%1.67%1.5%1.5%1.0% 1.0%1.5%2.75%2.0%2.0% 2.0% 2.0%2.0%2.0% 2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%1.0%1.0%4.11%4.11%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%2.0%1.50%1.50%2.0% 2 .0% 2.0% 2.0% 2.0% 2.0% 2 .0% 2 .0% 2 .0% 100 YEAR=1009.34 100 YEAR=1009.28 100 YEAR=1009.34 26 28 29 20 21 22 23 24 25 27 30 NE ADDISON DR.1007 ST 1008 1008 100 81008 10081008 S 1009 1009 1 0 0 9 10091009 1009S 1010 1010 10101 0 1 0 10101010 1010 1011 101110111 0 1 1 10111011 1011 1012 101210121 0 1 2 10121012 1012 1013 10131013 1 0 1 3 10131013 1013 10141014 1 0 1 4 10141014 1014 1014 10151015 10151015 1015 1015 1016 1016 10161016 1016 1016 10171017 1017 1017 1017 1018 1 0 1 8 10181018 1018 1018 1 0 1 91019 1019 1019 1019 10201020 1020 1020 1020 1021 1021 1021 1021 1022 1022 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP07_1151084_ERO.dgn8/23/20163:28:35 PMSnyder1:40pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNER1 2 3 4 5 6 7 9 8 11 12 10 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 13 14 15 16 17 18 19 20 45 46 47 48 49 50 51 52 53 54 55565758 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 LOT 33 F.F.E.=1014.10F.F.E.=1012.90F.F.E.=1012.00F.F.E.=1016.92F.F.E.=1015.10 F.F.E.=1014.70F.F.E.=1014.25F.F.E.=1012.80F.F.E.=1011.70F.F.E.=1011.50F.F.E.=1011.70F.F.E.=1013.10F.F.E.=1015.25F.F.E.=1012.15F.F.E.=1011.301352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1352SF 1352SF 1352SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 1248SF 1248SF 1248SF 1352SF 1352SF 1248SF 2267SF 1248SF 1248SF 1352SF 1352SF 30' Building Setback Line30' Building Setback Line30' Building Setback Line30' Building Setback Line 15' Water Main Easement25' Landscape Buffer EasementLOT 34(Private) 20' Storm Sewer Easement Existing 16.50' Telephone EasementExisting 20' Underground Electric Line EasementExisting 93' Over Head Electric Line Easement10051005 10051006 1006 1006 10061007 1007 100710071007 100710071008 1008 10081008100810081008100810081009 1009 100910091009100910091009100910091009 10091010 101010101010 1 0 1 0 101010101010 1010 10101010 10 10 1010101010111011 1 0 1 1 101110111011 1011 101110111 0 1 1 1011 1011 101110111011101110111011 1012 10 1210121 0 1 2 101210121012101210121012 1012 1013 1 0 1 3 1013101310131013 1013 1013 10141014 1014 1014 1014 101410141 0 1 41014 1014 1014 10141014 10141015 101510151 0 1 5 1015 10151016 101610161 0 1 6 10161016 1017 1018 1019 4 6 3 STST ST ST STST EXISTING 12" WST ST S TST STST ST ST STSTSTSTSTSTSTSTSTSTSTST EXISTING 8" W NE DELLWOOD DRIVE NE ALICE'S ROADCREEK PLAT 4LANDING AT SHADOW STNE OLIVIA LANE (Private)(Private)NE MACEY WAY(Private) NE LANDON LANE (Private)NE CONNER COURTST EXISTING 12" W2 40'STORMWATER MANAGEMENT QUANTITIES GRADING PLAN GENERAL NOTES POLLUTION PREVENTION NOTES depth varies. Wet storage 18" PVC Backfil on Riser 1" Clean Granular to Seal Connection Spray Foam Insulation Bottom of Basin to Seal Connection Spray Foam Insulation Basin Outlet 24" FES For Leave top of riser open. specified in the contract documents. Elevations and dimensions not given are as Backfil on Riser 1" Clean Granular 1 depth varies. Dry storage Dewatering Orifice 1 Principal Spillway 3-Rows/18-Columns(54 holes)1"Dia. specified. Provide perforation configuration as SEDIMENT BASIN DEWATERING DEVICE (PERFORATED RISER) 0 SCALE (FEET) 40 7 EROSION AND SEDIMENT CONTROL PLAN7MANAGEMENT FACILITY LOCATIONS POTENTIAL STORM WATER OVERFLOW ROUTES 500 SF OF RECP SEEDING, FERTILIZING & MULCHING 6.3 AC SEDIMENT BASKETS 7 EA SILT FENCE 1350 LF REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND SITE WASTE PRIOR TO FILING OF THE "NOTICE OF DISCONTINUATION".k. SEDIMENT BASIN OR OTHER CONTROL DEVICE WHERE POSSIBLE. CONCRETE WASHOUT MUST BE CONTAINED ONSITE. CONCRETE WASHOUT FACILITY. CONTROL RUNOFF FROM STAGING AREAS WITH DIVERSION BERMS AND/OR SILT BARRIERS AND DIRECT TO A CONTAIN THE FOLLOWING: JOB TRAILERS, FUELING / VEHICLE MAINTENANCE AREA, TEMPORARY SANITARY FACILITIES, MATERIALS STORAGE, AND COORDINATE LOCATIONS OF STAGING AREAS WITH THE OWNER AND RECORD IN THE SWPPP. UNLESS NOTED OTHERWISE, STAGING AREAS SHOULD j. ACTIVITY HAS FINISHED OR IS PLANNED TO BE DELAYED MORE THAN 21 CALENDAR DAYS. COMPLETION OR DELAY OF GRADING OPERATIONS. INITIATE STABILIZATION MEASURES NO LATER THAN 14 CALENDAR DAYS AFTER CONSTRUCTION STABILIZE UNDEVELOPED, DISTURBED AREAS WITH MULCH, TEMPORARY SEED MIX, PERMANENT SEED MIX, OR SOD AS SOON AS PRACTICAL UPON i. IMPROVEMENTS ARE LOCATED TO MEET SUDAS SPECIFICATIONS SECTION 2010 FOR TOPSOIL. RESPREAD TOPSOIL (INCLUDING TOPSOIL FOUND IN SOD) ON ALL DISTURBED AREAS, EXCEPT WHERE PAVEMENT, BUILDINGS OR OTHER h. AND OUTLET CONTROL MEASURES AS SOON AS STORM SEWERS ARE INSTALLED. AREAS REACH THEIR FINAL GRADES AND AS CONSTRUCTION OPERATIONS PROGRESS TO ENSURE CONTINUOUS RUNOFF CONTROL. PROVIDE INLET INSTALL NECESSARY CONTROL MEASURES SUCH AS SILT BARRIERS, EROSION CONTROL MATS, MULCH, DITCH CHECKS OR RIPRAP AS SOON AS g. AND TAKE REMEDIAL ACTIONS FOR FUTURE PREVENTION. STREETS, DRIVEWAYS, SIDEWALKS, DRAINAGEWAYS, OR UNDERGROUND SEWERS. REMOVE ANY ACCUMULATION OF EARTH OR DEBRIS IMMEDIATELY PREVENT ACCUMULATION OF EARTH AND DEBRIS FROM CONSTRUCTION ACTIVITIES ON ADJOINING PUBLIC OR PRIVATE PROPERTIES, INCLUDING f. OWNER OR ENGINEER DURING CONSTRUCTION. REVISE THE SWPPP AND IMPLEMENT ANY RECOMMENDED MEASURES WITHIN 3 DAYS. DAYS. RECORD THE FINDINGS OF THESE INSPECTIONS AND ANY RESULTING ACTIONS IN THE SWPPP WITH A COPY SUBMITTED WEEKLY TO THE INSPECT THE PROJECT AREA AND CONTROL DEVICES (BY QUALIFIED PERSONNEL ASSIGNED BY THE CONTRACTOR) EVERY SEVEN CALENDAR e. THEIR ORIGINAL CAPACITY. SEDIMENT REMOVAL THROUGHOUT THE PERMIT PERIOD. CLEAN OR REPLACE SILT CONTROL DEVICES WHEN THE MEASURES HAVE LOST 50% OF MAINTAIN ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES IN WORKING ORDER, INCLUDING CLEANING, REPAIRING, REPLACEMENT, AND d. CONSTRUCTION OPERATIONS AT ANY TIME. PRESERVE EXISTING VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION AND LIMIT TO A MINIMUM THE TOTAL AREA DISTURBED BY c. BASINS DOWNSTREAM OF SOIL DISTURBING ACTIVITIES PRIOR TO SITE CLEARING AND GRADING OPERATIONS. INSTALL PERIMETER AND FINAL SEDIMENT CONTROL MEASURES SUCH AS SILT BARRIERS, DITCH CHECKS, DIVERSION BERMS, OR SEDIMENTATION b. WATER INFILTRATION, AND MINIMIZE SOIL COMPACTION. BUFFERS AROUND SURFACE WATERS, DIRECT STORM WATER TO VEGETATED AREAS TO INCREASE SEDIMENT REMOVAL AND MAXIMIZE STORM UTILIZE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE WHEN DISCHARGING FROM BASINS, PROVIDE AND MAINTAIN NATURAL a. TO, THE FOLLOWING BMP'S UNLESS INFEASIBLE OR NOT APPLICABLE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL REQUIREMENTS OF THE GENERAL PERMIT AND SWPPP, INCLUDING, BUT NOT LIMITED 4. THE SWPPP AND SITE MAP SHOULD BE EXPEDITIOUSLY REVISED TO REFLECT CONSTRUCTION PROGRESS AND CHANGES AT THE PROJECT SITE.3. THE CONTRACTOR TO IDENTIFY, NOTE AND IMPLEMENT. ADDITIONAL BMP'S FROM THOSE SHOWN ON THE PLAN MAY BE REQUIRED. COVERAGE. ALL BMP'S AND EROSION CONTROL MEASURES REQUIRED AS A RESULT OF CONSTRUCTION ACTIVITIES ARE THE RESPONSIBILITY OF THE SWPPP ILLUSTRATES GENERAL MEASURES AND BEST MANAGEMENT PRACTICES (BMP) FOR COMPLIANCE WITH THE PROJECT'S NPDES PERMIT 2. DURING CONSTRUCTION. CONTRACTOR SHOULD REFER TO THE SWPPP FOR ADDITIONAL REQUIREMENTS AND MODIFICATIONS TO THE POLLUTION PREVENTION PLAN MADE THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS A SEPARATE DOCUMENT IN ADDITION TO THESE PLAN DRAWINGS. THE 1. POLLUTION PREVENTION PLAN:C. OWNER UPON PROJECT ACCEPTANCE AND/OR SUBMITTAL OF THE NOTICE OF DISCONTINUATION. THREE YEARS AFTER PROJECT COMPLETION. THE CONTRACTOR SHALL RETAIN A RECORD COPY AND PROVIDE THE ORIGINAL DOCUMENTS TO THE TEMPORARY EROSION CONTROL MEASURES. ALL PLANS, INSPECTION REPORTS, AND OTHER DOCUMENTS MUST BE RETAINED FOR A PERIOD OF A "NOTICE OF DISCONTINUATION" MUST BE FILED WITH THE IDNR UPON FINAL STABILIZATION OF THE DISTURBED SITE AND REMOVAL OF ALL 3. FAILURE TO COMPLY WITH THE NPDES PERMIT REQUIREMENTS IS A VIOLATION OF THE CLEAN WATER ACT AND THE CODE OF IOWA. OFFSITE. IF KEPT OFFSITE, THESE DOCUMENTS MUST BE PRESENTED TO ANY JURISDICTIONAL AGENCIES WITHIN 3 HOURS OF BEING REQUESTED. PUBLICATIONS, DISCHARGE AUTHORIZATION LETTER, CURRENT SWPPP, SITE INSPECTION LOG, AND OTHER ITEMS, SHALL BE KEPT ON SITE OR ALL DOCUMENTS RELATED TO THE STORM WATER DISCHARGE PERMIT, INCLUDING, BUT NOT LIMITED TO, THE NOTICE OF INTENT, PROOF OF 2. PERMIT COVERAGE FROM THE IDNR. 2 INCLUDING CREATING OR MAINTAINING THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND POSSIBLY OBTAINING THE GENERAL ALL SUBCONTRACTORS ARE RESPONSIBLE FOR COMPLIANCE WITH AND FULFILLMENT OF ALL REQUIREMENTS OF THE NPDES GENERAL PERMIT NO. CONSTRUCTION ACTIVITIES FROM THE IDNR, AS REQUIRED BY THE ENVIRONMENTAL PROTECTION AGENCY (EPA). THE GENERAL CONTRACTOR AND THIS PROJECT REQUIRES COVERAGE UNDER THE NPDES GENERAL PERMIT NO. 2 FOR STORM WATER DISCHARGES ASSOCIATED WITH 1. STORM WATER DISCHARGE PERMITB. THEREOF FROM AMOUNTS DUE TO THE CONTRACTOR. COMES ONTO ADJOINING PUBLIC OR PRIVATE PROPERTY, THE OWNER MAY, BUT NEED NOT, REMOVE SUCH ITEMS AND DEDUCT THE COST OWNER. FURTHER, IF THE CONTRACTOR FAILS TO TAKE NECESSARY STEPS TO PROMPTLY REMOVE EARTH SEDIMENTATION OR DEBRIS WHICH WHATSOEVER RESULTING FROM DAMAGES TO ADJOINING PUBLIC OR PRIVATE PROPERTY, INCLUDING REASONABLE ATTORNEY FEES INCURRED TO DAMAGE CLAIMS: THE CONTRACTOR WILL HOLD THE OWNER AND ARCHITECT / ENGINEER HARMLESS FROM ANY AND ALL CLAIMS OF ANY TYPE 2. SITE AND ALL OFF-SITE BORROW OR DEPOSIT AREAS DURING PERFORMANCE OR AS A RESULT OF PERFORMANCE. LOCAL ORDINANCES. THE CONTRACTOR SHALL TAKE ALL NECESSARY STEPS TO PROTECT AGAINST EROSION AND POLLUTION FROM THIS PROJECT REQUIREMENTS OF THE IOWA CODE, THE IOWA DEPARTMENT OF NATURAL RESOURCES (IDNR) NPDES PERMIT, THE U.S. CLEAN WATER ACT AND ANY CODE COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL POTENTIAL POLLUTION AND SOIL EROSION CONTROL 1. POLLUTION PREVENTION AND EROSION PROTECTIONA. Riser PVC 24" PVC Riser 24"X18" PVC TEE 24" PVC Cap on Bottom of Tee 100 YEAR=1009.34 100 YEAR=1009.34 REMAINDER OF THE SITE SHALL BE SODDED AS PER SUDAS SPECIFICATIONS SECTION 9020. THE RIGHT-OF-WAY (NE ALICE'S ROAD AND NE DELLWOOD DRIVE) AS PER SUDAS SPECIFICATIONS SECTION 9010. THE H. HYDROMULCH SUDAS TYPE 2 (PERMANENT COOL SEASON MIXTURE FOR SLOPES AND DITCHES) SHALL BE USED WITHIN FINISH DESIGN GRADES PRIOR TO SEEDING. G. CONTRACTOR TO REMOVE ANY SEDIMENT FROM BASIN ACCUMULATED DURING CONSTRUCTION AND REGRADE BASIN TO SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES. F. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS, AND SPECIFICATIONS SECTION 2010 FOR TOPSOIL. E. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO MEET SUDAS BASKETS SHALL BE PROVIDED ONCE PAVING IS COMPLETE AROUND STORM INTAKES SHALL BE MAINTAINED UNTIL PAVING AND SEEDING/ SODDING ARE COMPLETE. SEDIMENT D. CONTRACTOR SHALL PROVIDE SILT FENCE AROUND ALL STORM INTAKES AND WHERE SHOWN ON THE PLAN. SILT FENCE C. GRADES SHOWN ARE FINISHED GRADE AND/OR TOP OF PAVING SLAB (GUTTER), UNLESS OTHERWISE NOTED. CONTRACTOR TO THE OWNERS SPECIFICATIONS WITHOUT ADDITIONAL COMPENSATION. B. PROTECT EXISTING UTILITIES FROM CONSTRUCTION DAMAGE. ANY DAMAGE THAT OCCURS SHALL BE REPAIRED BY THE IN THE EXACT LOCATION INDICATED. AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE A. UTILITY WARNING: THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/ OR RECORDS 100 YEAR=1009.34 BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENTOVERFLOW=1010.0Q=7.51 CFS LITTLE WALNUT CREEK WATERSHED DISCHARGE LOCATION TO THE WITH PROPERTY OWNER) (COORDINATE SIZE AND FINAL LOCATION APPROX. TOPSOIL STOCKPILE LOCATION (COORDINATE WITH PROPERTY OWNER) STAGING AREA ENGINEER) (FIELD VERIFY WITH WASHOUT LOCATION APPROX. CONCRETE ENTRANCE/EXIT CONSTRUCTION STABILIZED at outlet. riser for sediment control Provide temporary 90° PVC 26 28 29 20 21 22 23 24 25 27NE ADDISON DR.1007 1008 1008 100 81008 1008 S 1009 1009 1 0 0 9 10091009S 1010 1010 10101 0 1 0 10101010 1010 1011 101110111 0 1 1 10111011 1011 1012 101210121 0 1 2 10121012 1012 1013 10131 0 1 3 10131013 1013 10141 0 1 4 10141014 1014 1014 101510151015 1015 1015 10161016 1016 1016 1016 10171017 1017 1017 1017 1018 1 0 1 8 10181018 1018 1018 1 0 1 91019 1019 1019 1019 10201020 1020 1020 1020 1021 1021 1021 1021 1022 1022 10051005 10051006 1006 1006 10061007 1007 100710071007 100710071008 1008 10081008100810081008100810081009 1009 100910091009100910091009100910091009 10091010 101010101010 1 0 1 0 101010101010 1010 10101010 10 10 1010101010111011 1 0 1 1 101110111011 1011 101110111 0 1 1 1011 1011 101110111011101110111011 1012 10 1210121 0 1 2 101210121012101210121012 1012 1013 1 0 1 3 1013101310131013 1013 1013 10141014 1014 1014 1014 101410141 0 1 41014 1014 1014 10141014 10141015 101510151 0 1 5 1015 10151016 101610161 0 1 6 10161016 1017 1018 1019 4 6 3 STST ST ST STST8"S8"S8"S 8"S8"S8"S8"S 8"S 8"W8"W 8"W8"W EXISTING 12" W8"W ST ST S TST STST ST ST STSTSTSTSTSTSTSTSTSTSTST EXISTING 8" W NE DELLWOOD DRIVE NE ALICE'S ROAD8"W8"W8"WCREEK PLAT 4LANDING AT SHADOW STNE OLIVIA LANE (Private)(Private)NE MACEY WAY(Private) NE LANDON LANE (Private)NE CONNER COURTST EXISTING 12" W2 BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP08_1151084_LND.dgn8/23/20163:28:40 PMSnyder1:40pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNER1 2 3 4 5 6 7 9 8 11 12 10 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 13 14 15 16 17 18 19 20 45 46 47 48 49 50 51 52 53 54 55565758 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 30' Building Setback Line30' Building Setback Line30' Building Setback Line30' Building Setback Line 33' Ingress/egress Easement 10' Public Utility Easement 10' Public Utility Easement10' Public Utility Easement33' Ingress/egress Easement33' Ingress/egress Easement10' Public Utility Easement10' Public Utility Easement10' Public Utility Easement 15' Water Main Easement25' Landscape Buffer Easementand Private Sanitary Sewer Easement 43' Ingress/Egress, Private Water Main, (Private) 20' Storm Sewer Easement Existing 16.50' Telephone EasementExisting 20' Underground Electric Line EasementExisting 93' Over Head Electric Line Easement0 SCALE (FEET) 40 40'BOTANICAL NAMEKEY SIZE COMMENTS 6' HT. CO Celtis occidentalis 'Prairie Pride' PLANT SCHEDULE QB Quercus bicolor SWAMP WHITE OAK PRAIRIE PRIDE HACKBERRY MP QW Quercus x warei 'Long'REGAL PRINCE OAK BLACK HILLS SPRUCEPGPicea glauca 'Densata' 6' HT. Acer x platnoides columnar COMMON NAME COLUMNAR NORWAY MAPLEAP 6' HT. 6' HT. 6' HT. Malus 'Pink Spires'PINK SPIRES CRABAPPLE LANDSCAPE REQUIREMENTS AND CALCULATIONS PLANTING PLAN GENERAL NOTES PLANTING PLAN8 83-CO 1-AP 2-AG 3-UM 1-AP 1-BP 1-MP 1-AP 1-BN 2-PF 1-AC 1-PF 2-AF 1-AM 1-AP 3-UM 1-CO 1-AM 1-QW 1-QW 1-QW 2-QW 2-QW 1-PF 1-PF 1-MP 1-MS 3-MS 1-MS 2-CO 1-AF 1-AM 2-AF 1-AF 1-PF 1-PF 3-BP 1-MP 1-AM 3-BP 1-BP 1-PF 1-CO 5-BN 3-BN 2-PG 2-UM 2-CO 2-CO 3-UM 6-PG 4-AF 1-AM 1-AM 2-AF 5-PG 3-AF 5-PG 1-AP 2-AP 1-AP 1-AF 1-AP 1-AP 1-AF 5-PG 1-AF 3-BP 1-BP 1-MS 1-AF 4-BP 3-AF3-PG3-MS 1-QB 1-AF 3-AC 2-BP 2-PF 1-PF 3-PG 2-AG 3-PG 1-QW 1-QB 2-AM 3-MA 3-MS 2-QB 2-PF 3-PG 2-UM 5-BP 2-PG 4-AG 1-AC 2-AP 8' HT. 8' HT. 1-BP 8' HT. 8' HT. 8' HT. Abies concolor WHITE FIR Pinus flexilis 'Vanderwolf's Pyramid'VANDERWOLF PINE TREESEVERGREENTREESORNAMENTALAF Acer x freemanii 'Sienna'SIENNA GLEN MAPLE MS Malus 'Spring Snow'SPRING SNOW CRABAPPLE 6' HT. 6' HT.Malus 'Adirondack'ADIRONDACK CRABAPPLEMA AG Amelanchier x grandiflora 'Autumn Brilliance'AUTUMN BRILLANCE SERVICEBERRY 6' HT. 6' HT. BN BP HERITAGE RIVER BIRCHBetula nigra 'Heritage' 8' HT. UM Ulmus 'Morton' ACCOLADE ACCOLADE ELM AM STATE STREET MAPLE 8' HT. Acer miyabei 'Morton 'STATE STREET' Betula platyphylla 'Fargo'DAKOTA PINNACLE BIRCH PF ACTREES OVERSTORY1-AM 1-AM NO SCALE PLANTING PIT DETAILS Root Ball Diameter 1 1/2 to 2 Tim es SCARIFY SIDES OF PIT TYPICAL PLANTING PIT DETAIL LOCATED AT TOP OF ROOTBALL 2" OF TRUNK. ROOT COLLAR IS NOT ALWAYS FINISH GRADE. DO NOT PLACE MULCH WITHIN SET ROOT COLLAR AND ROOT FLARE 2" ABOVE MINIMUM FOR SHRUBS 2X ROOTBALL MINIMUM FOR TREES 3X ROOTBALL ROOT SYSTEM OR CONTAINER DEPTH OF ROOT BALL FINISH GRADE PLACE ROOT BALL ON UNDISTURBED SOIL BEYOND EDGE OF ROOT BALL 3" HEIGHT WATER RETENTION BERM BASKET MINIMUM. MINIMUM TOP 1/2 OF BURLAP AND WIRE BALLED AND BURLAP (B&B) PLANTS REMOVE MATERIAL. REMOVE ALL TWINE. FOR IMPEDE THE GROWTH OF THE PLANT CONTAINERS OR OTHER MATERIAL THAT WILL REMOVE ALL NON-BIODEGRADABLE MATERIAL, MINIMUM 6' DIAMETER, 3" DEPTH MULCH RING SLOPE PLANTING PIT DETAIL SCARIFY SIDES OF PIT LOCATED AT TOP OF ROOTBALL 2" OF TRUNK. ROOT COLLAR IS NOT ALWAYS FINISH GRADE. DO NOT PLACE MULCH WITHIN SET ROOT COLLAR AND ROOT FLARE 2" ABOVE MINIMUM FOR SHRUBS 2X ROOTBALL MINIMUM FOR TREES 3X ROOTBALL ROOT SYSTEM OR CONTAINER DEPTH OF ROOT BALL EXISTING SLOPE FINISH GRADE PLACE ROOT BALL ON UNDISTURBED SOIL TREE OR SHRUB ROOT BALL BEGIN TRANSITION AT EDGE OF 2:1 MAXIMUM TRANSITION SLOPE. MINIMUM 6' DIAMETER, 3" DEPTH MULCH RING BEYOND EDGE OF ROOT BALL 3" HEIGHT WATER RETENTION BERM BASKET MINIMUM. MINIMUM TOP 1/2 OF BURLAP AND WIRE BALLED AND BURLAP (B&B) PLANTS REMOVE MATERIAL. REMOVE ALL TWINE. FOR IMPEDE THE GROWTH OF THE PLANT CONTAINERS OR OTHER MATERIAL THAT WILL REMOVE ALL NON-BIODEGRADABLE MATERIAL, NO SCALE DECIDUOUS TREE STAKING DETAIL 10 2 10 1 6'' (Trees larger than 2 1/2 inch diameter) STAKING PLAN 1 1 (4'-0" MIN.) TREE HEIGHT 1/2 TO 2/3 (2'-0" MIN.) TREE HEIGHT 1/4 TO 1/3 6" TO SOUTHWEST PLACE ON STAKE TO SOUTHWEST PLACE ON STAKE inch diameter or smaller}2 1{Trees 2 STAKING PLAN MATERIAL FLAGGING GARDEN HOSE DETAILS SEE PLANTING PIT branch. Wrap trunk from ground line to first F. SOD ALL DISTURBED AREAS. PERIMETER, AND IN ALL AREAS INDICATED ON PLAN. E. PROVIDE 3-INCH DEPTH SHREDDED HARDWOOD MULCH AROUND ALL PLANTINGS TO A MIN. 3-FOOT D. CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM DATE OF INSTALLATION. STANDARDS FOR NURSERY STOCK" (ANSI Z60.1-LATEST EDITION). C. ALL PLANT MATERIAL SHALL AT LEAST MEET MINIMUM REQUIREMENTS SHOWN IN THE "AMERICAN WITH UTILITY COMPANIES DURING CONSTRUCTION. CARELESSNESS SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. COORDINATE AND COOPERATE TO UTILITIES AND SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO THE CONTRACTOR'S FOR DETERMINING EXISTENCE, EXACT LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE B. NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT WARRANT THAT THE THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS OBTAINED. A. UTILITY WARNING: 12.02 X 2.0 = 24.04 ORNAMENTAL TREES REQD. (24 PROVIDED). 12.02 X 2.0 = 24.04 EVERGREEN TREES REQD. (24 PROVIDED). 12.02 X 1.0 = 12.02 OVERSTORY TREES REQD. (12 PROVIDED). 601.36 L.F./50= 12.02 PLANT UNITS BUFFER) 1 OVERSTORY, 2 EVERGREEN, 2 ORNAMENTAL (PER 50 LF OF 25' BUFFER ALONG WEST PROPERTY LINE BUFFER REQUIREMENT: 37 UNDERSTORY TREES REQUIRED (37 UNDERSTORY PROVIDED) 37 EVERGREEN TREES REQUIRED (37 EVERGREEN PROVIDED) 74 OVERSTORY TREES REQUIRED (74 OVERSTORY PROVIDED) (50% OVERSTORY, 25%EVERGREEN, 25% UNDERSTORY) 2 TREES PER UNIT (74 UNITS) OPEN SPACE: (120,194 SF PROVIDED - 43.78%) 274,523 SF (TOTAL LOT) x 20% = 54,904 SF REQUIRED 20% OPEN SPACE REQUIRED CODE REQUIREMENTS) (LANDSCAPE CALCULATIONS BASED UPON CITY OF WAUKEE ZONING SB HA PO ANNABELLE HYDRANGEA LITTLE DEVIL NINEBARK Aronia melanocarpa 'Morton' AR Hydrangea arborescens 'Annabelle' Physocarpus opulifolius 'Donna May' Spiraea betulifolia 'Tor' Taxus x media 'Tauntonii' IRIQUOIS BLACK BEAUTY CHOKEBERRY TOR SPIREA TAUNTON'S YEWTM 24" HT. 24" HT. 24" HT. 24" HT. 24" HT. 4-TM 2-AM 2-HA 2-HA 2-PO 2-PO 6-SB6-AM6-AM 5-PO 5-AM 1-AF 2-PF 2-SB 2-HA 6-TM 2-HA 2-HA 2-TM 2-HA 6-HA 4-TM 2-SB 2-HA 2-TM 2-PO 2-HA 6-SB 1-PF 2-HA 5-PO 2-PO 2-PO (FIELD VERIFY). ANTICIPATED MECHANICAL UNIT LOCATION 1-PG 1-PF 1-AP 1-AP 1-AP 1-BP 1-BP 1-BP 1-AP BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP09_1151084_DTL.dgn8/23/20163:28:44 PMSnyder1:10pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNERATTACHMENT TO POST Fabric Post cable ties Wire or 5 TYPICAL SILT FENCE DITCH CHECK F oresl o p eVariable (20' for a normal 10' wide ditch.) (5'-0" max.) Post spacing (5'-0" max.) Post spacing 4 5 1 3 Backslope 902 904 906 908 910 TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES individual section of silt fence Install "J-hook" at each end of an ground contour Install parallel to (Plan View) (600' if slope is flatter than 5%) 200' max. length per section documents or as directed by the Jurisdictional Engineer. Section 9040, 3.07 and at locations shown in the contract Install silt fence according to the requirements of GENERAL NOTES: 1 2 3 4 5 Insert 12 in. of fabric a minimum of 6 in. deep (fabric may be folded below the ground line) Compact ground by driving along each side of the silt fence as required to sufficiently secure the fabric in the trench to prevent pullout and flow under the fence. In ditches, extend silt fence up side slope so the bottom elevation at the end of the fence is a minimum of 2 in. higher than the top of the fence in the low point of the ditch. Steel posts to be embedded 20 in. unless otherwise allowed by the Jurisdictional Engineer. Secure top of engineering fabric to steel posts using wire or plastic ties (50 lb. min.). See details of "Attachment to Posts." TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES Ground line Fabric Flow 4'-0" minimum 'T' steel fence post (Profile View) 4 1 1 2 See plans for spacing NO SCALE SILT FENCE DETAIL Ground line Fabric 1 5 4 or as required to adequately support fence Reduce post spacing to 5'-0" at water concentration areas, 8'-0"spacing 24"DETAILS OF SILT FENCE ON LONGITUDINAL SLOPES36"6'' (Trees larger than 2 1/2 inch diameter) STAKING PLAN 1 1 (4'-0" MIN.) TREE HEIGHT 1/2 TO 2/3 (2'-0" MIN.) TREE HEIGHT 1/4 TO 1/3 6" NO SCALE DECIDUOUS TREE STAKING DETAIL NO SCALE PLANTING PIT DETAILS SLOPE PLANTING PIT DETAIL SCARIFY SIDES OF PIT LOCATED AT TOP OF ROOTBALL 2" OF TRUNK. ROOT COLLAR IS NOT ALWAYS FINISH GRADE. DO NOT PLACE MULCH WITHIN SET ROOT COLLAR AND ROOT FLARE 2" ABOVE MINIMUM FOR SHRUBS 2X ROOTBALL MINIMUM FOR TREES 3X ROOTBALL ROOT SYSTEM OR CONTAINER DEPTH OF ROOT BALL EXISTING SLOPE FINISH GRADE PLACE ROOT BALL ON UNDISTURBED SOIL TREE OR SHRUB ROOT BALL BEGIN TRANSITION AT EDGE OF 2:1 MAXIMUM TRANSITION SLOPE. MINIMUM 6' DIAMETER, 3" DEPTH MULCH RING BEYOND EDGE OF ROOT BALL 3" HEIGHT WATER RETENTION BERM BASKET MINIMUM. MINIMUM TOP 1/2 OF BURLAP AND WIRE BALLED AND BURLAP (B&B) PLANTS REMOVE MATERIAL. REMOVE ALL TWINE. FOR IMPEDE THE GROWTH OF THE PLANT CONTAINERS OR OTHER MATERIAL THAT WILL REMOVE ALL NON-BIODEGRADABLE MATERIAL, TO SOUTHWEST PLACE ON STAKE TO SOUTHWEST PLACE ON STAKE inch diameter or smaller}2 1{Trees 2 STAKING PLAN MATERIAL FLAGGING GARDEN HOSE DETAILS SEE PLANTING PIT SEE PLANTING PIT DETAIL FINISH GRADE IMPERVIOUS SOIL ENGINEERING FABRIC Roo t Ball Diameter 1 1/2 to 2 Tim es SCARIFY SIDES OF PIT TYPICAL PLANTING PIT DETAIL LOCATED AT TOP OF ROOTBALL 2" OF TRUNK. ROOT COLLAR IS NOT ALWAYS FINISH GRADE. DO NOT PLACE MULCH WITHIN SET ROOT COLLAR AND ROOT FLARE 2" ABOVE MINIMUM FOR SHRUBS 2X ROOTBALL MINIMUM FOR TREES 3X ROOTBALL ROOT SYSTEM OR CONTAINER DEPTH OF ROOT BALL FINISH GRADE PLACE ROOT BALL ON UNDISTURBED SOIL BEYOND EDGE OF ROOT BALL 3" HEIGHT WATER RETENTION BERM BASKET MINIMUM. MINIMUM TOP 1/2 OF BURLAP AND WIRE BALLED AND BURLAP (B&B) PLANTS REMOVE MATERIAL. REMOVE ALL TWINE. FOR IMPEDE THE GROWTH OF THE PLANT CONTAINERS OR OTHER MATERIAL THAT WILL REMOVE ALL NON-BIODEGRADABLE MATERIAL, MINIMUM 6' DIAMETER, 3" DEPTH MULCH RING branch. Wrap trunk from ground line to first NO SCALE 5.0'' 5.0'' 2.0'' CLUSTER MAILBOX PAD DETAIL NOTES: 1.Cluster Mailbox to be located on the no parking/street light side of street. 2.Do not locate at intersection. 3.Locate near shared property line per approved plan. BACK OF CURB MAILBOX CLUSTER FRONT FACE OF 8" THICK(MINIMUM) 5' X 5' MAILBOX PAD SIDEWALK 1 1 NO SCALE TREE DRAINAGE WELL DETAIL Diameter 8" to 12" 6' DEPTH SEPTIC GRAVEL {IF PRESENT} PERVIOUS SOIL BY ENGINEER. INSTALLATION; AS APPROVED IMPERVIOUS SOILS ARE FOUND DURING TREE DRAINAGE WELL ONLY REQUIRED IF NOTE: into the pervious soil layer. extends a minimum of 12 inches well may be termineated when the well depth less the 6 feet, the drainage If pervious soil is encountered at a NO SCALE FIRE HYDRANT ASSEMBLY NOTES MINIMUM SIZE FOR PIPING. VALVES AND FITTINGS FROM WATER MAIN TO HYDRANT INLET: 6". 1. PROVIDE TRACER WIRE AND TRACER WIRE STATION.2. WRAP HYDRANT, PIPE AND FITTINGS WITH POLYETHYLENE ENCASEMENT. 3. VALVE BOX ANCHORING TEE OR STANDARD UNDISTURBED EARTH TEE AND ANCHORING COUPLING2'-0"DEPTH VARIES1'-0" X 1'-0" X 4" CONCRETE PAD BACKFILL WITH 3/4" WASHED GRAVEL MAIN TRENCH WALL VARIES WATER MAIN THRUST BLOCKANCHORING PIPE GATE VALVEMIN. 6'-0"18" MIN. OR TRACER WIRE. NOT COVER DRAIN HOLES UNDISTURBED EARTH. DO THRUST BLOCK AGAINST POURED CONCRETE HYDRANT 9 3 9 4 9 1 9 2 9 5 9 6 SITE DETAILS9 910'NO SCALE9 7 MODULAR BLOCK WALL DETAIL 1 max. 4'-0'' Cap Stone Proper Block Setback Pins or Lip to Ensure Finished Grade (slope varies) Excavation Line Granular Backfill Material Subdrain wide (min.) leveling pad. Construct a 6" thick X 18" Foundation Compacted Excavation Line (typ.) Wall Unit specified by the wall manufacturer. materials and dimensions will be limits, reinforcement, and leveling pad Exact dimensions, wall batter, backfill 6" min. 6" min. 8" min. Geogrid Geogrid structural engineer. certified by manufacturers manufacturer. Shop drawings shall be be provided by the wall system Any necessary structural design shall segmental block retaining wall. For walls higher than 4 feet, use (TW) (FG) (If Applicable) Property Line Backfill Material Topsoil or Suitable fabric. with engineering backfill material Wrap porous Grade Finished 1 WHERE SHOWN ON PLANS 5'X10' DOUBLE PAD BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP10_1151084_DTL.dgn8/23/20163:28:48 PMSnyder1:10pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNERSTD.DWG.NO.15 CITY OF WAUKEE RISER 6" MIN. 6" MIN. 4" MIN. SURFACESTOPPER AT END OF PIPE (TYP.) RISER PIPE TRENCH WALL GRANULAR BEDDING T BRANCH (SIZE AS SPECIFIED) STAKE TO WALL1'-0"MIN.1'-0"MIN.OF TRENCH PLAN INSTALL RISER PIPE TO BEAR FIRMLY AGAINST UNDISTURBED WALL OF TRENCH. STAKE RISER PIPE IN PLACE PRIOR TO BACK- FILLING TO PREVENT MOVEMENT OF PIPE NOTCH WALL OF TRENCH TO RECEIVE PIPE WHERE POSSIBLE. 2. 1. NOTES SECTION STD.DWG.NO.26 CITY OF WAUKEE DRIVEWAY APPROACH DETAIL NEW PAVEMENT 1 - 2" X 6" 10' (SINGLE DRIVE) 3' (TYP.) 18' (DOUBLE DRIVE) 1'-0"R CURB 6" SIDEWALK THROUGH DRIVEWAY 1'-0" VARIES SIDEWALK CONCRETE AS SPECIFIED 6"(SEE NOTE 4) USE THIS DETAIL TO CONSTRUCT APPROACHES SUBGRADE AS SPECIFIED PAVEMENT 2 1/4" PLAN VIEW SECTION AT CENTERLINE OF DRIVE 16'-0" (SEE NOTE 1) 1'-0"1'-0" 24'-0" (SEE NOTE 1) 2 1'-0"1'-0" 1 /4 " 2 1 /4 " DRIVEWAY TEMPLATES (AT CURB LINE)WHEN CONSTRUCTING APPROACH FOR EXISTING DRIVEWAY, ADD 6' TO WIDTH OF DRIVEWAY TO OBTAIN MODIFIED OVERALL LENGTH OF TEMPLATE. MINIMUM SLOPE ON DRIVEWAY - 1/2" : 1'-0". USE THIS DETAIL TO CONSTRUCT APPROACHES TO EXISTING DRIVEWAYS. USE AT OTHER LOCATIONS ONLY IF AUTHORIZED BY CITY. 1. 2. 3. NOTES 2 - 2" X 6" TO EXISTING DRIVEWAYS. USE AT OTHER 3. COMMERCIAL DRIVE MINIMUM THICKNESS 8" FROM PAVEMENT TO BACK OF SIDEWALK. 4. EXPANSION JOINT 1/2" FULL DEPTH EXPANSION JOINT 1/2" FULL DEPTH JOINT EXPANSION DEPTH 1/2" FULL JOINT EXPANSION DEPTH 1/2" FULL 22' (TRIPLE DRIVE) STD.DWG.NO.27 CITY OF WAUKEE DRIVEWAY APPROACH DETAIL EXISTING PAVEMENT 10' (SINGLE DRIVE) CURB 3' (TYP.) 18' (DOUBLE DRIVE) EXISTING MATCH ELEVATION AT MILL OFF CONCRETE CURB TO CONFORM TO THE SPECIFIED BACK OF EXISTING CURB. 6" SIDEWALK THROUGH DRIVEWAY 1'-0" VARIES SIDEWALK CONCRETE AS SPECIFIED 6"(SEE NOTE 1) EXISTING EXISTING CURB PAVEMENT 2 1/4" PLAN VIEW SECTION AT CENTERLINE OF DRIVEWAY APPROACH SHAPE FOR DEPRESSED CURB 1'-0" R COMMERCIAL DRIVE MINIMUM THICKNESS 8"FROM PAVEMENT TO BACK OF SIDEWALK. 1. NOTES EXPANSION JOINT 1/2" FULL DEPTH EXPANSION JOINT 1/2" FULL DEPTH JOINT EXPANSION DEPTH 1/2" FULL EXPANSION JOINT 1/2" FULL DEPTH 22' (TRIPLE DRIVE) STD.DWG.NO.30 CITY OF WAUKEE FLARED END SECTION FOOTING DETAIL EROSION CONTROL MEASURES D DVARIES SAME DIMENSION AS END SECTION FLARED END SECTION A A FLARED END SECTION DELEVATION SECTION A-A #4 BARS @ 18" ON CENTER UNDISTURBED SOIL VARIABLE CONCRETE FOOTING 6" 1'- 0"MIN. SECTION PIPE JOINT. WATERSTOP AT FLARED END INSTALL 3' WIDE CLAY 2. OF FLARED END;MINIMUM D=42" FLOW LINE 300 FT DOWNSTREAM AND DRAINAGE WAY CHANNEL BETWEEN FLARED END INVERT D=DIFFERENCE IN ELEVATION 1. NOTES: MAX. FORMED VERTICAL FACE STD.DWG.NO.32 CITY OF WAUKEE SERVICE CONNECTION SERVICE SIDEWALK DEPTH VARIESWATER MAIN CORPORATION COCK DEPTH VARIESUNDISTURBED EARTH CURB STOP BOX CURB STOP PROPERTY LINE 1'-0"MIN. 5'-0"MIN. 6'-0"45 NOTES: FINISHED GRADE. TERMINATE CURB STOP BOX ROD 1'-6" BELOW 1. SAND BACKFILL 10 1010'CITY OF WAUKEE STANDARD DETAILS BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP11_1151084_DTL.dgn8/23/20163:28:53 PMSnyder1:10pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNER1 2 3 4 5 6 7 9 8 11 12 10 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 13 14 15 16 17 18 19 20 45 46 47 48 49 50 51 52 53 54 55565758 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 30' Building Setback Line30' Building Setback Line30' Building Setback Line30' Building Setback Line 25' Landscape Buffer Easement4 6 3 NE DELLWOOD DRIVE NE ALICE'S ROADNE OLIVIA LANE (Private)(Private)NE MACEY WAY(Private) NE LANDON LANE (Private)NE CONNER COURT2 6 2 RAMP AREA 1 RAMP AREA 3 RAMP AREA 5 SIDEWALK RAMP AREA 2 DETAIL 1"=10' SIDEWALK RAMP AREA 3 DETAIL 1"=10' SIDEWALK RAMP AREA 5 DETAIL 1"=10'SIDEWALK RAMP DETAILS11 1110'X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 1015.20 1015.12 1015.06 1015.65 1015.15 1015.07 1014.54 1014.40 1014.48 1014.88 1014.43 1014.35 1009.61 1009.691009.83 1009.66 1009.74 1010.12 1010.57 1010.14 1010.19 1010.11 1010.06 1010.44 1011.85 1011.53 1011.47 1011.45 1012.951013.03 1013.385.0'5.0' 5.0' 5.0' 5.0' 5.0' 1015.32G 1015.57TC 1014.73G 1014.98TC 1009.79G 1010.04TC 1009.50G 1009.75TC 1010.11G 1010.36TC 1010.24G 1010.49TC 1011.52G 1011.77TC 1013.05G 1013.30TC 1014.21G 1014.46TC 1014.55G 1014.80TC RAMP AREA 2 X 1019.36 X 1019.28 X1018.66G 1018.91TC X X X X X XX X X X X X X X 1018.99 1019.47 1019.66 1019.581019.391019.531019.611019.581019.531019.66 1019.61 1019.36 1019.28 SIDEWALK RAMP AREA 1 DETAIL 1"=10' 5.0'1012.96 X1012.88 1011.39X 1018.76G 1019.01TC 1014.98 X 1014.51 X 1009.60 X X RAMP AREA 4 SIDEWALK RAMP AREA 4 DETAIL 1"=10' X 1013.19G 1013.69T/C 1011.70G 1012.20T/C X 1009.90 1.5%5.5%1.0 %1.5% 1 .5% 3.9% 1.0 %1.0 %1.5%1.5%6.3%4.6%1.0% 1.5% 1.5%1.5%1.0%1.5%1.0%2.82%1.84% 6.3 1 %4.5 9 %1009.97 X 1010.04 X X 1009.67 X 1009.741.5%1.5%1.5%1.5%1.0% 4.17% 1.5%4.38% 1.0%1.5%1.5%4.17% 3.26%1.5%1.5%1.5%3.26% 1. 0 %1.0% 1. 5 %1.5% 1.5% 2.5 %1.0%1.5 %1.5%1.0%1.0%1.0%7.47%5.51%6.64%4.86% 1.0%1.0% 1.4 4 %1.5%1.5% 1.5%1.0%1.0%1.5% 1 .5% 1.5% 1.5% 1.5% 1.5% 1.5% 1011.73G 1012.23T/C X X 1011.50 1011.38 X 1.0%1.5%1011.61G 1012.11T/C X 1.25% X1012.75 1.0%X 1011.30 L.P. X 1011.42 4.11%5.8%4.59%5.33%5.33%1.0%1.5%1.25% 1.25%1.5%1.5%X X XX X X X X XX X XX X 1010.14 1009.91 1010.17G 1010.67TC 1010.40G 1010.90TC 1009.84 1010.35 1009.92 1009.99 1010.21 1010.77 1010.29 1010.22 1.5%7.17%7.17%1.5% 1.5% 1.5%1.25%1.25%1.5% 1009.77G 1010.27TC 1.5% 1.5% 1010.19G 1010.69TC8.0%8.0%1.0% 1.0% 1007.531007.591007.731007.831007.921008.061008.101008.261008.271008.431008.471008.601008.681008.781008.891008.971009.101009.171009.291009.361009.491009.551009.681009.871009.951009.971010.071010.191010.241010.411010.501010.601010.601010.631010.631010.661010.731010.751010.751010.781010.811010.821010.891010.951011.001011.091011.101011.141011.251011.341011.351011.561011.814142434445461352SF1352SF1248SF1248SF1248SF1352SFST EXISTING 12" W ST9+00 10+00 11+00 11+00 EXISTING 12" W BYDATEREVISIONMARKScale:Checked By:Engineer:Technician:Date:Field Bk: Pg:1"= jwmccormickpw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\2015_Projects\115.1084\Cadd\SP12_1151084_TURN_LN.dgn8/23/20163:28:58 PMSnyder1:20pw:\\SAAPWIS01.snyder-associates.com:ProjectWise\Documents\Snyder\Printing\Pen_Tables\date.tblV8iBWFullWeightPDF.pltcfgSheetofSheet of Project No:SNYDER & ASSOCIATES, INC.Project No:515-964-2020 | www.snyder-associates.comANKENY, IOWA 500232727 S.W. SNYDER BLVD.WAUKEE, IA115.1084 115.108412 12EDCEDCJWM04-25-16105/20/16JWMREVISED AS PER CITY COMMENTSJWM06/10/16REVISED AS PER CITY COMMENTS2VILLAGE AT SHADOW CREEK PLAT 1308/23/16JWMREVISED AS PER OWNERST EXISTING 12" W ST9+00 10+00 11+00 11+00 EXISTING 12" W4142434445461352SF1352SF1248SF1248SF1248SF1352SF Sta.10+87.58,23.50'LT Begin 10:1 Taper Sta.11+92.57,13.00'LT End 10:1 Taper Sta.10+37.58,23.50'LT PT Sta.9+62.56,23.50'LT PT Sta.9+57.56,23.50'LT Begin 4:1 Taper Sta.9+15.56,13.00'LT End 4:1 Taper NE ALICE'S RD NE ALICE'S RD BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5 BT-5BT-5 CDCDCDCDCDCDCDCDCDCDCD15'15'15'15'15'15'15'15'15'CDKT-2KT-2L-112.5'15'12.5'12.5'12.5'12.5'12.5'12.5'12.5'12.5'12.5'12.5'L-2L-2L-2L-2CDCDRDRD L-2L-2C C C CC C CC CC 4:1 Taper 10:1 TaperPRIVATE DRIVEPRIVATE DRIVEGEOMETRICS AND STAKING LAYOUT JOINTING LAYOUT 0 SCALE (FEET) 20 TURN LANE DETAIL12 1220'Sta.10+00.00,10.50'LT E=18462753.48 N=7501923.37 | Private Drive6" of Pavement Along Alice's Rd for Paving Tie-In Provide Full Depth Saw-Cut and Remove Sta.10+12.58,48.54'LT PC Sta.9+87.58,48.46'LT PC 2.5%2.5%2.5%Match Exisitng Match Exisitng Match ExisitngMatch Exisitng NOTES CLOSURE. PRIOR TO ANY LANE OR ROAD ONE WEEK NOTICE SHALL BE GIVEN REQUIREMENTS FOR LANE WIDENING. CONTROL WHICH MEETS MUTCD A. CONTRACTOR SHALL PROVIDE TRAFFIC Left Elevation - ARight Elevation - A groupdesign1840 NW 118th St. Suite 220Clive, IA 50325515.254.1181Shadow Creek Villas - TownhomesRear Elevation - A WHITE [PRIVACY FENCE] DRIFTWOOD WEATHERED WOOD WHITE [TRIM] MEDIUM GRAY [STONE] GREYSTONE DRIFTWOOD DRIFTWOOD MEDIUM GRAY [STONE] DRIFTWOOD MEDIUM GRAY [STONE] Front Elevation - A DRIFTWOOD WEATHERED WOOD WHITE [TRIM] GREYSTONE DRIFTWOOD MEDIUM GRAY [STONE] WHITE [GARAGE DOORS] Front Elevation - B Left Elevation - BRight Elevation - B groupdesign1840 NW 118th St. Suite 220Clive, IA 50325515.254.1181Shadow Creek Villas - TownhomesRear Elevation - B GREYSTONE WEATHERED WOOD WHITE [TRIM] GRAPHITE GREYSTONE WHITE [PRIVACY FENCE] LIGHT GRAY [STONE] WHITE [GARAGE DOORS] GREYSTONE WEATHERED WOOD WHITE [TRIM] LIGHT GRAY [STONE] GRAPHITE GREYSTONE GREYSTONE LIGHT GRAY [STONE] GREYSTONE LIGHT GRAY [STONE] Front Elevation - C Left Elevation - CRight Elevation - C groupdesign1840 NW 118th St. Suite 220Clive, IA 50325515.254.1181Shadow Creek Villas - TownhomesRear Elevation - C RYE WEATHERED WOOD COUNTRY BEIGE [TRIM] CLAY RYE WHITE [PRIVACY FENCE] MEDIUM BROWN [STONE] COUNTRY BEIGE [GARAGE DOORS] RYE WEATHERED WOOD COUNTRY BEIGE [TRIM] MEDIUM BROWN [STONE] CLAY RYE RYE MEDIUM BROWN [STONE] RYE MEDIUM BROWN [STONE]