HomeMy WebLinkAbout2016-11-07-J01J 3rd St Water Tower Refurbish_Cert of Substantial CompletionNO Waukee '1■1! THE KEY TO GOOD UVING AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: November 7, 2016 AGENDA ITEM: Consideration of approval of a resolution approving substantial completion P d Street Water Tower Refurbishment Project] FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The Water Tower Refurbishment Project had two completion dates in the contract. The substantial completion date is the date the contractor was required to have the water tower ready to begin filling. The final completion date is the date the contractor is required to have the water tower on line and all of the project requirements completed. This action sets the date for substantial completion. FISCAL IMPACT INCLUDING COSTBENEFIT ANALYSIS: COMMISSIONBOARDICOMNUTTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the resolution. ATTACHMENTS: L Certificate of Substantial Completion PREPARED BY: Beth Richardson REVIEWED BY: John Gibson PUBLIC NOTICE INFORMATION — NAME OF PUBLICATION: DATE OF PUBLICATION: IY�ls�[�]f[� APPROVING CERTIFICATE OF SUBSTANTIAL COMPLETION OF THE 3RD STREET WATER TOWER REFURBISHMENT PROJECT WHEREAS, on the 181h day of April, 2016, the Mayor and Clerk of the City of Waukee, Iowa, entered into a construction contract with J.R. Stelzer of Lincoln, NE, for the construction of certain public improvements generally described as the 3`d Street Water Tower Refurbishment Project; and WHEREAS, the contractor has substantially completed the construction of the public improvements in accordance with the terms and conditions of the contract and plans and specifications: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, IOWA: Section 1. That the certificate of substantial completion of the public improvements for the 3`d Street Water Tower Refurbishment Project are hereby approved and accepted. PASSED AND APPROVED this 7ch day of November, 2016. ATTEST: City Clerk ROLL CALL VOTE Anna Bergman Brian Harrison Shelly Hughes Larry R. Lyon Rick Peterson Mayor AYE NAY ABSENT ABSTAIN L;JCI)C' .G1ie.'E`'s f.4Ml'IEE CERTIFICATE OF SUBSTANTIAL COMPLETION Owner: City of Waukee Owner's Contract No.: Contractor: JR Stelzer Contractor's Project No.: Engineer: Stanley Consultants, Inc. Engineer's Project No.: 26485.01.00 Project: 3rd Street Tower Refurbishment Contract Name: City of Waukee Tower Renovation This [preliminary] [final] Certificate of Substantial Completion applies to: ❑ All Work ❑ The following specified portions of the Work: 10/24/2016 Date of Substantial Completion The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor, and Engineer, and found to be substantially complete. The Date of Substantial Completion of the Work or portion thereof designated above is hereby established, subject to the provisions of the Contract pertaining to Substantial Completion. The date of Substantial Completion in the final Certificate of Substantial Completion marks the commencement of the contractual correction period and applicable warranties required by the Contract. A punch list of items to be completed or corrected is attached to this Certificate. This list may not be all-inclusive, and the failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract. The responsibilities between Owner and Contractor for security, operation, safety, maintenance, heat, utilities, insurance, and warranties upon Owner's use or occupancy of the Work shall be as provided in the Contract, except as amended as follows: [Note: Amendments of contractual responsibilities recorded in this Certificate should be the product of mutual agreement of Owner and Contractor; see Paragraph 15.03.D of the General Conditions.] Amendments to Owner's responsibilities: None ❑As follows Amendments to Contractor's responsibilities: � None ❑As follows: The following documents are attached to and made a part of this Certificate: [punch list; others] This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents, nor is it a release of Contractor's obligation to complete the Work in accordance with the Contract. EXE TED BY ENGINEER: By: (utha zed signature) n Title: i cC {� o Date: RECEIVED: By: Owner (Authorized Signature) Title: Date: By: Contractor t Title: Date: EJCDC° C-625, Certificate of Substantial Completion. Prepared and published 2013 by the Engineers Joint Contract Documents Committee. Page 1 of 1 Stanley Consultants INC. FINAL Construction Punch List — 10/24/2016 Final Walkthrough Date: Project: Owner: Contractor: Attendees: Punch List By: October 24, 201 Waukee 3rd Street Tower Refurbishment City of Waukee, Iowa J.R. Stelzer Co.. Tom Stelzer, J.R. Stelzer Co. Chuck Waske, City of Waukee Kent Kuehl, Induron Coatings Jeremy McMahon, Stanley Consultants Jeremy McMahon 1. Final coat top rail of guardrail at top of tank 2. Install rubber spacer under grating at top of tank 3. Install gasket and bolt shut hatch at bottom of riser 4. Disinfect riser and tank 5. Final grade area so ready for seeding in the Spring by the City Distribution: Tom Stelzer, J.R. Stelzer Co. J.R. Stelzer, J.R. Stelzer Co. John Gibson, City of Waukee Tim Royer, City of Waukee SC 5018 Rz 0613 Page 1 of 1