HomeMy WebLinkAbout2021-07-19-Resolution 2021-320_Set Public Hearing Date, Street Resurfacing, Ashworth Dr and Waco PlRESOLUTION 2021-320
RESOLUTION ORDERING CONSTRUCTION OF THE
WAUKEE STREET RESURFACING: ASHWORTH DRIVE
FROM 2ND TO 4TH STREET/WACO PLACE FROM
ASHWORTH ROAD TO WILSON STREET, AND FIXING A
DATE FOR HEARING THEREON AND TAKING OF BIDS
THEREFOR
WHEREAS, it is deemed advisable and necessary to construct certain public improvements
described in general as the Waukee Street Resurfacing: Ashworth Drive from 2nd to 4th
Street/Waco Place from Ashworth Road to Wilson Street; and
WHEREAS, the City has caused to be prepared plans, specifications and form of contract,
together with estimate of cost, which are now on file in the office of the City Clerk for public
inspection, for the construction of the public improvements; and
WHEREAS, the plans, specifications and form of contract are deemed suitable for the
making of the public improvements; and
WHEREAS, final grades have been established by ordinance, consistent with the plans for
all street improvements included in the proposed construction; and
WHEREAS, before the plans, specifications, form of contract and estimate of cost may be
adopted, and a contract for the construction of the public improvements is entered into, it is
necessary, pursuant to Chapter 26, Code of Iowa, to hold a public hearing and to advertise for bids:
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
WAUKEE, STATE OF IOWA:
Section 1. That it is hereby determined that it is necessary and advisable to construct certain
public improvements described in general as the Waukee Street Resurfacing: Ashworth Drive from
2nd to 4th Street/Waco Place from Ashworth Road to Wilson Street, in the manner set forth in the
plans and specifications and form of contract, above referred to, the cost thereof to be paid in
accordance with the provisions as set out in the posted Notice to Bidders and published Notice of
Public Hearing; the public improvements being more generally described as follows:
Construction of an HMA overlay on Ashworth Drive, from 2nd Street to 4th Street,
and HMA paving on Waco Place, from Ashworth Road to Wilson Street. Project
items include subgrade preparation and treatment, curb and gutter replacement,
ADA curb ramp construction, patching, granular shouldering/surfacing, traffic
control, and seeding, fertilizing, and mulching. Specific project location along with
the kind and approximate quantity of materials to be used shall be as set forth in the
Plans and Specifications.
Section 2. That the amount of the bid security to accompany each bid shall be in an amount
which shall conform to the provisions of the notice to bidders approved as a part of the
specifications.
BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to post a
notice to bidders once in a relevant contractor plan room service with statewide circulation and a
relevant construction lead generating service with statewide circulation and on an internet site
sponsored by either the City or a statewide association that represents the City. Posting shall be
not less than thirteen clear days nor more than forty-five days prior to August 10, 2021, which is
hereby fixed as the date for receiving bids. The bids are to be filed prior to 2:00 P.M., on such
date.
The City Council hereby delegates to the City Administrator or his designee the duty of
receiving, opening and tabulating bids for construction of the Project. Bids shall be received and
opened as provided in the public notice and the results of the bids shall be considered at the meeting
of this Council on August 16, 2021, at 5:30 P.M.
BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to publish
notice of hearing once in a legal newspaper, printed wholly in the English language, published at
least once weekly and having general circulation in this City. Publication shall be not less than
four clear days nor more than twenty days prior to the date hereinafter fixed as the date for a public
hearing on the plans, specifications, form of contract and estimate of costs for the project, the
hearing to be at 5:30 P.M. on August 16, 2021.
PASSED AND APPROVED this 19th day of July, 2021.
ATTEST:
��� 0 - �6� -
City Clerk
RESULTS OF VOTE:
AYE
Anna Bergman Pierce
R. Charles Bottenberg
Chris Crone
X
Larry R. Lyon
X
Ben Sinclair
X
Mayor
NAY
ABSENT
X
X
ABSTAIN