Loading...
HomeMy WebLinkAbout2021-07-19-Resolution 2021-320_Set Public Hearing Date, Street Resurfacing, Ashworth Dr and Waco PlRESOLUTION 2021-320 RESOLUTION ORDERING CONSTRUCTION OF THE WAUKEE STREET RESURFACING: ASHWORTH DRIVE FROM 2ND TO 4TH STREET/WACO PLACE FROM ASHWORTH ROAD TO WILSON STREET, AND FIXING A DATE FOR HEARING THEREON AND TAKING OF BIDS THEREFOR WHEREAS, it is deemed advisable and necessary to construct certain public improvements described in general as the Waukee Street Resurfacing: Ashworth Drive from 2nd to 4th Street/Waco Place from Ashworth Road to Wilson Street; and WHEREAS, the City has caused to be prepared plans, specifications and form of contract, together with estimate of cost, which are now on file in the office of the City Clerk for public inspection, for the construction of the public improvements; and WHEREAS, the plans, specifications and form of contract are deemed suitable for the making of the public improvements; and WHEREAS, final grades have been established by ordinance, consistent with the plans for all street improvements included in the proposed construction; and WHEREAS, before the plans, specifications, form of contract and estimate of cost may be adopted, and a contract for the construction of the public improvements is entered into, it is necessary, pursuant to Chapter 26, Code of Iowa, to hold a public hearing and to advertise for bids: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1. That it is hereby determined that it is necessary and advisable to construct certain public improvements described in general as the Waukee Street Resurfacing: Ashworth Drive from 2nd to 4th Street/Waco Place from Ashworth Road to Wilson Street, in the manner set forth in the plans and specifications and form of contract, above referred to, the cost thereof to be paid in accordance with the provisions as set out in the posted Notice to Bidders and published Notice of Public Hearing; the public improvements being more generally described as follows: Construction of an HMA overlay on Ashworth Drive, from 2nd Street to 4th Street, and HMA paving on Waco Place, from Ashworth Road to Wilson Street. Project items include subgrade preparation and treatment, curb and gutter replacement, ADA curb ramp construction, patching, granular shouldering/surfacing, traffic control, and seeding, fertilizing, and mulching. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications. Section 2. That the amount of the bid security to accompany each bid shall be in an amount which shall conform to the provisions of the notice to bidders approved as a part of the specifications. BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to post a notice to bidders once in a relevant contractor plan room service with statewide circulation and a relevant construction lead generating service with statewide circulation and on an internet site sponsored by either the City or a statewide association that represents the City. Posting shall be not less than thirteen clear days nor more than forty-five days prior to August 10, 2021, which is hereby fixed as the date for receiving bids. The bids are to be filed prior to 2:00 P.M., on such date. The City Council hereby delegates to the City Administrator or his designee the duty of receiving, opening and tabulating bids for construction of the Project. Bids shall be received and opened as provided in the public notice and the results of the bids shall be considered at the meeting of this Council on August 16, 2021, at 5:30 P.M. BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to publish notice of hearing once in a legal newspaper, printed wholly in the English language, published at least once weekly and having general circulation in this City. Publication shall be not less than four clear days nor more than twenty days prior to the date hereinafter fixed as the date for a public hearing on the plans, specifications, form of contract and estimate of costs for the project, the hearing to be at 5:30 P.M. on August 16, 2021. PASSED AND APPROVED this 19th day of July, 2021. ATTEST: ��� 0 - �6� - City Clerk RESULTS OF VOTE: AYE Anna Bergman Pierce R. Charles Bottenberg Chris Crone X Larry R. Lyon X Ben Sinclair X Mayor NAY ABSENT X X ABSTAIN