Loading...
HomeMy WebLinkAbout2021-08-16-H03B Street Resurfacing, Ashworth Dr and Waco Pl_Award ContractAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 16, 2021 AGENDA ITEM:Consideration of approval of a resolution awarding contract [Street Resurfacing Project, Ashworth Drive and Waco Place] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The Street Resurfacing Project, Ashworth Drive and Waco Place consists of an HMA overlay on Ashworth Drive, from 2nd Street to 4th Street, and HMA paving on Waco Place, from Ashworth Road to Wilson Street. Project items include subgrade preparation and treatment, curb and gutter replacement, ADA curb ramp construction, patching, granular shouldering/surfacing, traffic control, and seeding, fertilizing, and mulching. The City received bids on August 10, 2021 with three (3) contractors submitting bids. Grimes Asphalt and Paving Corp. of Des Moines, IA, submitted the low bid in the amount of $501,932.86 (Base Bid + Alt. B) and $509,851.33 (Base Bid + Alt. A) which is approximately 4% and 6% under the engineer’s estimate of $524,007.28 and $540,858.88 respectively. Alternate A consists of installing an asphalt fiber reinforcement fabric on Ashworth Dr between the milled surface of the existing concrete pavement and the new 2” asphalt overlay. Alternate B consists of performing a crack and seat on Ashworth Dr of the underlying concrete pavement before placing the new 2” asphalt overlay. Staff recommends proceeding forward with the asphalt fiber reinforcement fabric as the engineer and manufacturer have provided data which will stay the reflective cracking typically seen with a thin asphalt overlay on existing concrete pavement by several years. This project is included in the FY 2022-2026 Capital Improvements Plan approved by City Council in March 2021 with a total project budget of $700,000. This project has a substantial completion date of June 1, 2022. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $509,851.33 STAFF REVIEW AND COMMENT: Staff recommends awarding the project to Grimes Asphalt and Paving Corp. of Des Moines, IA for the Base Bid + Alt. A configuration in the amount of $509,851.33. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Bid Tab III. Resolution PREPARED BY:Beth Richardson REVIEWED BY: Rudy Koester RK H3B RESOLUTION 2021- RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE WAUKEE STREET RESURFACING: ASHWORTH DRIVE FROM 2ND TO 4TH STREET/WACO PLACE FROM ASHWORTH ROAD TO WILSON STREET BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1.That the following bid for the construction of certain public improvements described in general as the Waukee Street Resurfacing: Ashworth Drive from 2nd to 4th Street/Waco Place from Ashworth Road to Wilson Street, described in the plans and specifications heretofore adopted by this Council on August 16, 2021, be and is hereby accepted, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor: Grimes Asphalt & Paving Corp. of Des Moines, IA Amount of bid: $509,851.33 Portion of project: All construction work Section 2.That the Mayor and Clerk are hereby directed to execute the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 16th day of August, 2021. Mayor ATTEST: City Clerk August 10, 2021 City of Waukee Mr. Rudy Koester, Public Works Director 805 University Avenue Waukee, IA 50263 RE: Letter of Recommendation and Award 2021 Asphalt Overlay Improvements MEC Project No. 000210618-000 Dear Rudy, McClure Engineering Company has reviewed the bids received August 10th, 2021, for the 2021 Asphalt Overlay Improvements, Waukee, Iowa project. The lowest, responsive, responsible Bidder on this project is Grimes Asphalt and Paving Corporation of Des Moines, IA. We recommend the City Council of Waukee, Iowa, award the contract for 2021 Asphalt Overlay Improvements to the lowest responsive, responsible Bidder, Grimes Asphalt and Paving Corporation of Des Moines, IA for the BASE BID + Alternate A of Five Hundred Nine Thousand Eight Hundred Fifty-One Dollars and Thirty-Three Cents ($509,851.33). Sincerely, McCLURE ENGINEERING COMPANY Brian Sandberg, P.E. Senior Project Engineer Encl.: Bid Tabulation, 2021 Asphalt Overlay Improvements cc: File Line ItemItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionUnit PriceExtensionUnit PriceExtension2.012010-D-1TOPSOIL, ON-SITECY48.430.00$ 1,452.00$ 65.00$ 3,146.00$ 63.00$ 3,049.20$ 77.00$ 3,726.80$ 2.022010-EEXCAVATION, CLASS 10CY82.415.00$ 1,236.00$ 41.25$ 3,399.00$ 40.00$ 3,296.00$ 36.05$ 2,970.52$ 2.032010-GSUBGRADE PREPARATIONSY7413.22.00$ 14,826.40$ 3.10$ 22,980.92$ 3.35$ 24,834.22$ 3.80$ 28,170.16$ 2.042010-HSUBGRADE TREATMENT, 6% CEMENTTON121.91300.00$ 36,573.00$ 294.00$ 35,841.54$ 304.00$ 37,060.64$ 181.50$ 22,126.67$ 2.052010-J-2REMOVAL OF PIPE CULVERTLF4830.00$ 1,440.00$ 39.00$ 1,872.00$ 38.00$ 1,824.00$ 39.00$ 1,872.00$ 4.014030-A-1PIPE CULVERT, TRENCHED, 54 IN. RCPLF48260.00$ 12,480.00$ 242.00$ 11,616.00$ 235.00$ 11,280.00$ 240.00$ 11,520.00$ 4.024030-BPIPE APRON, 54 IN. RCPEA26,000.00$ 12,000.00$ 3,557.00$ 7,114.00$ 3,450.00$ 6,900.00$ 3,550.00$ 7,100.00$ 4.034030-CFOOTINGS FOR CONCRETE PIPE APRONEA21,000.00$ 2,000.00$ 1,445.00$ 2,890.00$ 1,400.00$ 2,800.00$ 1,500.00$ 3,000.00$ 4.044030-DPIPE APRON GUARDSEA2750.00$ 1,500.00$ 2,300.00$ 4,600.00$ 2,200.00$ 4,400.00$ 2,270.00$ 4,540.00$ 6.016010-EMANHOLE ADJUSTMENT, MINOREA81,500.00$ 12,000.00$ 2,050.00$ 16,400.00$ 2,560.00$ 20,480.00$ 2,200.00$ 17,600.00$ 7.017010-ECURB AND GUTTER, 2.5 FT., 6 IN.LF224.762.50$ 14,043.75$ 49.50$ 11,122.65$ 66.00$ 14,830.20$ 38.00$ 8,538.60$ 7.027020-AHMA PAVEMENT, ST PG 58-28S, BASE COURSE, 3/4" MIXTON1134.3965.00$ 73,735.35$ 69.00$ 78,272.91$ 70.00$ 79,407.30$ 77.00$ 87,348.03$ 7.037020-AHMA PAVEMENT, ST PG 58-28S, INTERMEDIATE COURSE, 1/2" MIXTON575.0168.00$ 39,100.68$ 66.00$ 37,950.66$ 70.00$ 40,250.70$ 80.00$ 46,000.80$ 7.047020-AHMA PAVEMENT, ST PG58-28S, SURFACE COURSE, 1/2" MIXTON575.0170.00$ 40,250.70$ 66.00$ 37,950.66$ 71.60$ 41,170.72$ 80.00$ 46,000.80$ 7.057020-IHMA PAVEMENT SAMPLES AND TESTINGLS13,000.00$ 3,000.00$ 1,050.00$ 1,050.00$ 1,100.00$ 1,100.00$ 750.00$ 750.00$ 7.067021-AHMA OVERLAY, ST PG58-28STON564.7370.00$ 39,531.10$ 72.00$ 40,660.56$ 75.80$ 42,806.53$ 80.00$ 45,178.40$ 7.077030-AREMOVAL OF SIDEWALKSY177.915.00$ 2,668.50$ 24.50$ 4,358.55$ 20.00$ 3,558.00$ 26.00$ 4,625.40$ 7.087030-BREMOVAL OF CURBLF182.920.00$ 3,658.00$ 16.00$ 2,926.40$ 14.50$ 2,652.05$ 31.00$ 5,669.90$ 7.097030-ESIDEWALK, PCC, 4 IN.SY65.690.00$ 5,904.00$ 118.00$ 7,740.80$ 82.00$ 5,379.20$ 65.00$ 4,264.00$ 7.17030-ESIDEWALK, PCC, 6 IN.SY130.495.00$ 12,388.00$ 94.00$ 12,257.60$ 94.00$ 12,257.60$ 86.00$ 11,214.40$ 7.117030-GDETECTABLE WARNINGSSF15550.00$ 7,750.00$ 57.00$ 8,835.00$ 65.00$ 10,075.00$ 40.00$ 6,200.00$ 7.127030-H-2DRIVEWAY, GRANULARTON4050.00$ 2,000.00$ 33.00$ 1,320.00$ 27.80$ 1,112.00$ 55.00$ 2,200.00$ 7.137030-999-AGRANULAR SHOULDERS, TYPE BTON347.3640.00$ 13,894.40$ 33.00$ 11,462.88$ 28.75$ 9,986.60$ 46.00$ 15,978.56$ 7.147040-AFULL DEPTH PATCH, HMASY500120.00$ 60,000.00$ 98.00$ 49,000.00$ 78.25$ 39,125.00$ 75.00$ 37,500.00$ 7.157040-BSUBBASE OVER-EXCAVATIONTON151.8650.00$ 7,593.00$ 46.00$ 6,985.56$ 44.00$ 6,681.84$ 50.00$ 7,593.00$ 7.167040-GMILLINGSY5122.25.50$ 28,172.10$ 2.15$ 11,012.73$ 2.70$ 13,829.94$ 2.85$ 14,598.27$ 7.177040-HPAVEMENT REMOVALSY26.515.00$ 397.50$ 25.00$ 662.50$ 25.00$ 662.50$ 55.00$ 1,457.50$ 8.018020-BPAINTED PAVEMENT MARKINGS, SOLVENT/WATERBORNESTA80.06150.00$ 12,009.00$ 61.00$ 4,883.66$ 59.00$ 4,723.54$ 65.00$ 5,203.90$ 8.028030-ATEMPORARY TRAFFIC CONTROLLS17,500.00$ 7,500.00$ 2,700.00$ 2,700.00$ 12,000.00$ 12,000.00$ 18,000.00$ 18,000.00$ 9.019010-BHYDRAULIC SEEDING, SEEDING, FERTLIIZING, AND MULCHINGAC0.115,000.00$ 1,500.00$ 41,250.00$ 4,125.00$ 18,000.00$ 1,800.00$ 42,000.00$ 4,200.00$ 9.029040-JRIP RAP, CLASS ETON8055.00$ 4,400.00$ 77.50$ 6,200.00$ 60.25$ 4,820.00$ 80.00$ 6,400.00$ 11.0111020-AMOBILIZATIONLS130,000.00$ 30,000.00$ 26,500.00$ 26,500.00$ 50,000.00$ 50,000.00$ 48,000.00$ 48,000.00$ 505,003.48$ 477,837.58$ 514,152.78$ 529,547.71$ Alt. A 7.187021-999-AASPHALT REINFORCING FABRICSY5122.27.00$ 35,855.40$ 6.25$ 32,013.75$ 6.70$ 34,318.74$ 6.00$ 30,733.20$ 35,855.40$ 32,013.75$ 34,318.74$ 30,733.20$ Alt. B 7.197092-ACRACK AND SEAT OF PCC PAVEMENTSY4242.92.00$ 8,485.80$ 3.20$ 13,577.28$ 3.25$ 13,789.43$ 2.60$ 11,031.54$ Alt. B 7.207092-CFULL DEPTH SAW CUTLF35063.00$ 10,518.00$ 3.00$ 10,518.00$ 2.75$ 9,641.50$ 3.30$ 11,569.80$ 19,003.80$ 24,095.28$ 23,430.93$ 22,601.34$ 540,858.88$ 509,851.33$ 548,471.52$ 560,280.91$ 524,007.28$ 501,932.86$ 537,583.71$ 552,149.05$ I hereby Certify that this is a true and correct tabulation of the bids received August 10, 2021 for the 2021 Asphalt Improvementsproject in the City of Waukee, Iowa8/10/2021Brian Sandberg, P.E. License No. 21130 Exp. 12/31/2021 DateTOTAL BASE BID + ALT. A2021 Asphalt Overlay ImprovementsCity of Waukee, Iowa8/10/2021TOTAL BASE BID + ALT. B Engineer Estimate Grimes Asphalt and Paving Corp. Des Moines Asphalt & Paving InRoads LLCDIVISION 11 - MISCELLANEOUSALTERNATE AALTERNATE BTOTAL BASE BIDTOTAL ALTERNATE ATOTAL ALTERNATE BDIVISION 2 - EARTHWORKDIVISION 4 - SEWERS AND DRAINSDIVISION - 6 STRUCTURES FOR SANITARY AND STORM SEWERSDIVISION 7 -STREETS AND RELATED WORKDIVISION 8 - TRAFFIC CONTROLDIVISION 9 - SITE WORK AND LANDSCAPING