HomeMy WebLinkAbout2021-08-16-I01P Alice's Rd-170th St Transmission Line Relocate Phase 2_Pmt Est 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 16, 2021 AGENDA ITEM:Consideration of approval of Payment Estimate No. 1 to NPL Construction Co. for the 170th Street Transmission Line Relocation Phase 2, in the amount of $82,950.58. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: NPL Construction Co. requested Payment Estimate No. 1 for the work completed on the 170th Street Transmission Line Relocation Phase 2 Project, in the amount of $82,950.58. USDI has reviewed the payment estimate and recommends payment. The partial payment is for the pay period ending August 10, 2021. This pay estimate is for lowering of 1,094 feet of gas main pipe. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $82,950.58 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Payment Estimate No. 1 ATTACHMENTS: I. Payment Estimate No. 1 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Rudy Koester RK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1P OLNEY, ILLINOIS 1927 Miller Drive Olney, IL 62450 (618) 392-5502 BELLEVILLE, IL 9 Executive Woods Ct. Belleville, IL 62226 (618) 277-1520 SHELBYVILLE, KY 1018 Mt. Vernon Dr. Shelbyville, KY 40065 (502) 513-5127 WICHITA, KS 9540 W. Harry St. Wichita, KS 67209 (316) 239-7313 PITTSBORO, IN 7421 N. Co Rd. 225 E. Pittsboro, IN 46167 (317) 892-7662 Utility Safety & Design, Inc. 28847 US HWY 136 Unionville, MO 63565 P (660) 947-3316 Fax (660) 947-3146 www.usdi.us August 10, 2021 Mr. Tim Royer, Assistant Dir. of Public Works City of Waukee 805 University Avenue Waukee, IA 50263 troyer@waukee.org RE: 170th Street Transmission Line Relocation Phase 2 – Change Order #1 & Pay App #1 Dear Mr. Royer, Please find attached hereto one copy of Pay Application #1 from NPL Construction Company for the above referenced project. The amount requested is $87,316.40 and the accepted quotation for the project is $129,583.00. A total of 1,094 feet of pipeline has been successfully lowered so far. A single section of 980 feet at the south end of the project remains to be lowered. Due to site constraints, this last section could not be lowered at this time as there is not enough room to place the excavated soils with 170th street open to traffic. After several discussions with NPL, Urbandale and Waukee, it was decided that NPL will come back next spring when the road can be closed to finish the lowering. I estimate that the work should be completed in approximately three days. During the quotation process, the City of Urbandale’s civil engineer reviewed the plans and found additional utility conflicts as well as extra depth required at couple of locations. This resulted in approximately 324 feet of additional lowering. Also, during construction, some original coating defects were discovered. Following is a summary of the changes that were directed by the engineer and inspector after quotation and during construction: 1. Using the original lump sum quote and footage, the cost for the additional footage lowered is $25,142.40. (324 feet @ $77.60/foot) 2. A watermain crossing that is just above the gas pipeline was discovered during construction. The contractor was directed to install tapecoat and rock shield on the pipeline to protect it from damage. The cost for this work is $1,210.00. 3. Five feet of the pipeline was discovered to have exiting coating damage. The contractor was directed to repair this coating and the cost for this work is $1,805.00. 4. At the anomaly dig, it was discovered that the pipeline coating was damaged. The contractor was directed to repair the coating. The cost of this repair is $605.00. www.usdi.us The total for the four changes listed above is $28,772.40 Following is a summary of project costs: Original Quote: $129,583.00 Approved Changes: $28,772.40 Revised project cost: $158,355.40 Work performed: $53,544.00 Approved Changes: $28,772.40 Partial mobilization: $5,000.00 Total work completed: $87,316.40 Remaining work to be completed: $71,0390.00 I recommend payment in the amount of $87,316.40 for the work performed. I also recommend that the completion date be extended to June 1, 2022 for the remaining 980 feet to be lowered. Please feel free to contact me anytime if you have any questions or require additional information. Respectfully Submitted, Anthony Everette, P.E. Senior Vice-President USDI Attach: As noted Cc: NPL Construction Co. 28847 US Hwy 136 PAYMENT NO.1 PAGE 1 of 2 O 660.947.3316 DATE 11-Aug-21 DATE REVISED STATE Iowa COUNTY Dallas CONTRACT DATE 9/1/2020 NO.DATE AMOUNT 1 07/23/2021 $28,772.40 1.$ 129,583.00 2.$ 28,772.40 3.$ 158,355.40 4.$ 87,316.40 5.$ 4,365.82 6.$ 82,950.58 7.$ 0 8.$ 82,950.58 9.$ 0 10.$ 82,950.58 $28,772.40 June 21, 2021 Original Days 40 Revised 345 On Schedule: ___X_____Yes 01-Jun-22 Used 51 ________No Remaining 294 Requested ___________ Contractor:Date Recommended ___________ Engineer:Date Accepted ___________ Owner:Date PAY ESTIMATES COMPLETION DATE STARTING DATE Contract Time OWNER City of Waukee, Iowa 170th St. Transmission Line Relocation Phase 2 08/10/2021 CHANGE ORDERS Original Contract………………………… Total of Change Orders...…………… Revised Contract (1 + 2)……………… Work Completed*………………………. Retainage ……….………………………….. Work Completed - Retainage (4-5)….. Utility Safety and Design ___________________________________________________________________ City of Waukee, IA Unionville, MO 63565 PARTIAL PAYMENT ESTIMATE Stored Materials*………………………. Subtotal (6+7)……………………………… Previous Payments…………………….. Amount Due (8-9)……………………….. The undersigned Contractor certifies that the work covered by this Partial Payment Estimate has been completed in accordance with the Contract Documents. That all amounts have been paid by the Contractor for work for which previous Partial Payment Estimates were issued and payments received from the Owner, and that current payment shown herein is now due. ___________________________________________________________________ NPL Construction, Co. CONTRACTOR'S CERTIFICATION: ENGINEER'S CERTIFICATION: The undersigned has reviewed this estimate and to the best of their knowledge and belief, the quantities shown in this estimate are correct. This DOES NOT constitue a recommendation of acceptability of any of the work partially or totally completed. Net change by Change Orders ___________________________________________________________________ Page 2 of 2 1. 2. NO. DATE AMOUNT 1 07/23/2021 $28,772.40 3. 4. 5.PREVIOUS PAY ESTIMATES NO. DATE AMOUNT 6.$75,404.82BALANCE TO FINISH INC. RETAINAGE (3-4-5)………………. PARTIAL PAYMENT ESTIMATE NO. 1 CONTRACT SUMMARY ORIGINAL CONTRACT AMOUNT………………………. CHANGE ORDERS TOTAL PREVIOUS PAY ESTIMATES…………………………………. TOTAL THIS PAY ESTIMATE……………..…………………………….. REVISED CONTRACT AMOUNT (2+3)…………………………….. NET CHANGE BY CHANGE ORDERS……………………………….. $129,583.00 $28,772.40 $158,355.40 $82,950.58 $0.00