HomeMy WebLinkAbout2021-08-16-I01Q NW 10th St, W Hickman Rd to NW Douglas Pkwy_Change Order 3AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 16, 2021 AGENDA ITEM:Consideration of approval of Change Order No. 3 to Absolute Concrete Construction, Inc. for the NW 10th Street Improvements, W Hickman Road to NW Douglas Parkway increasing the contract price in the amount of $28,964.23. FORMAT:Motion SYNOPSIS INCLUDING PRO & CON: Change Order No. 3 is for additional grading for the temporary granular access, insulation over the existing water main, lowering a section of water main, and pedestrian pushbuttons. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $28,964.23. Of this total change order amount, Foth will be reimbursing the City $20,653.22 (item CO 3.2) due to a design error. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Motion to Approve. ATTACHMENTS: I. Change Order No. 3 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1Q 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 Fax: (515) 254-1642 August 3, 2021 Sara Kappos, P.E. Assistant Director of Public Works 805 University Avenue Waukee, IA 50263 RE: Change Order #3 NW 10th Street Improvements W Hickman Rd to NW Douglas Parkway Dear Ms. Kappos: Attached please find a detailed Change Order for City Council approval on August 16, 2021. Change Description  Item 2.4 Excavation, Class 10, Roadway & Borrow o Increase item for extra grading for temporary access to the Stratford Development.  Item CO 3.1 Insulation of Water Main o Add item for insulation over shallow main along NW 10th Street.  Item CO 3.2 Time and Material for Lowering Water Main in SE Corner of Sunrise and NW 10th. o Add item for main lowering to minimum 5 ’ bury.  Item CO 3.3 APS Pedestrian Pushbuttons o City requested additional pushbuttons in SE corner of Hickman and 10th. We have reviewed the submitted quotes from Absolute Concrete Construction, Inc. and they appear to be in order with current industry pricing. If City Staff concurs with this pricing, we recommend the City of Waukee Increase the contract price in the amount of $28,964.23 to complete the additional work associated with Change Order #03. Please let me know if you have any questions or need additional information. Sincerely, Foth Infrastructure and Environment, LLC Joshua C. DeBower, P.E. Lead Civil Engineer Encl: Change Order #3 dated 08/03/2021 CHANGE ORDER 03 Distribution: Owner - Finance ____ Owner - Public Works ____ Engineer ____ Contractor ____ Contractor:Absolute Concrete Construction, Inc. 1000 West 6th Avenue PO Box 148 $9,845,649.70 November 5, 2019 Slater, Iowa 50244 2.4 CY $3.50 750 $2,625.00 CO 3.1 LS $3,376.01 1 $3,376.01 CO 3.2 LS $20,653.22 1 $20,653.22 CO 3.3 EA $1,155.00 2 $2,310.00 $28,964.23 $9,845,649.70 $152,906.10 $9,998,555.80 $28,964.23 $10,027,520.03 0 Days Recommended By: Absolute Concrete Construction, Inc. Signature: Name: Logan Petersen Title: Project Manager Date: Owner:City of Waukee □ ≤$500 Department Director X_______________________________________Date___________________ □ $501 to $2,500 City Administrator X_______________________________________Date___________________ □ Date___________________ □ >$2,501 City Council approved or ratified at Council meeting on Date___________________ 3 Title: Lead Civil Engineer Signature: The Contract Sum will be increased by this Change Order in the amount of Net Change by previously authorized Change Orders Title: City Administrator Value Adjustment NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Foth Infrastructure & Environment, LLC The Contract Sum prior to This Change Order was Signature: Name: Joshua C. DeBower, P.E. Date: Name: Tim Moerman Checked By: Prepared By: THE CONTRACT IS CHANGED AS FOLLOWS: Increase quantity for extra grading for temporary access to the Stratford Development, addition of time and materials for insulation over 12" water main, addition of time and materials for water main lowering in the SE corner of Sunrise and 10th and addition of two APS pushbuttons per city request in the SE corner of Hickman and 10th. Unit The new Contract Sum including this Change Order will be Special TIME AND MATERIAL FOR LOWERING WATER MAIN IN SE CORNER OF SUNRISE AND NW 10TH 2010-E-1010 Date: The Contract Time will be increased by CHANGE ORDER SUMMARY Item No.Quantity AdjustmentUnit Price Special APS PEDESTRIAN PUSHBUTTONS The Original Contract Sum was City of Waukee Department of Public Works 805 University Avenue Waukee, IA 50263 (515) 987-7920 Fax (515) 987-3979 Special Description Project Title Waukee Project File Number Item Code EXCAVATION, CLASS 10, ROADWAY & BORROW Change Order Number NW 10th Street Improvements W. Hickman Road to NW Douglas Parkway INSULATION OF WATER MAIN 19W003.00 August 3, 2021 Foth Project File Number Orig. Contract Amount & Date Date CO#03-2021-0731-NW 10th Street Improvements.xls Change Order 1 Page 1 of 1