Loading...
HomeMy WebLinkAbout2021-09-20-H01B Sugar Creek Park_Award ContractAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: September 20, 2021 AGENDA ITEM:Consideration of approval of a resolution awarding contract [Sugar Creek Park Project] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The project bid letting was held at Waukee City Hall on September 8th, 2021 at 2:00 p.m. Three (3) bids were received with the low base bid plus Alternate A from Concrete Connection LLC. in the amount of $544,760.00. Alternate A is construction of the trails with concrete. Alternate B was the option to construct the trails in asphalt. The bid form included Alternate C (8 Post Top Mounted Luminaire along the trail). Staff is recommending approval of the base bid plus Alternate A in the amount of $544,760 and Alternate C in the amount of $45,800 for a total bid of $590,560.00. Concrete Connections was the contractor that completed the Trailside Dog Park Project. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:$590,560.00 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: City staff recommends awarding the contract to Concrete Connection LLC. ATTACHMENTS: I. Proposed resolution II. Bid tabulation III. Engineers Memo and Recommendation PREPARED BY: Matt Jermier REVIEWED BY: H1B RESOLUTION 2021- RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE SUGAR CREEK PARK BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1.That the following bid for the construction of certain public improvements described in general as the Sugar Creek Park, described in the plans and specifications heretofore adopted by this Council on September 20, 2021, be and is hereby accepted, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor:Concrete Connection, LLC,of Johnston, IA Amount of bid:$590,560.00 Portion of project:All construction work Section 2.That the Mayor and Clerk are hereby directed to execute the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 20th day of September, 2021. Mayor ATTEST: City Clerk September 13th, 2021 City of Waukee, IA Rebecca Schuett, City Clerk 230 W. Hickman Road Waukee, IA 50263 RE: Sugar Creek Park Recommendation of Award Dear Rebecca Schuett: At 2:00 PM on September 8th, 2021, bids were received for the Sugar Creek Park. The Engineer’s Estimate for the Base Bid plus Alternate A of the project was $675,472.50. Three bids were received, all bidders were responsive, and bids for the Base Bid plus Alternate A are summarized as follows: Bidder Base Bid Plus Alternate A Amount Concrete Connection LLC $544,760.00 Caliber Concrete LLC $693,072.34 Howrey Construction, Inc $812,887.50 The bid received from Concrete Connection LLC was 19.35% below the engineer’s estimate for the project and was determined to be the lowest responsive bidder. Bolton & Menk, Inc has reviewed the bid documents submitted and checked references on this bidder and was satisfied with responses given. Due to bids received, Bolton & Menk, recommends awarding Alternate C as a part of the project. Therefore, Bolton & Menk, Inc. recommends award of the Sugar Creek Park project to Concrete Connection LLC, for the Base Bid plus Alternate A and Alternate C for the bid amount of $590,560.00 (Five Hundred Ninety Thousand Five Hundred Sixty Dollars and Zero Cents). Feel free to contact me should there be any questions related to this project. Sincerely, Charles Kahlsdorf, P.E., PMP Project Manager BOLTON & MENK, INC. Cc: File w/attachment Line Engineer's Estimate No.Description Unit Quantity Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1 CLEARING AND GRUBBING LS 1 $2,500.00 $2,500.00 $1,000.00 $1,000.00 $3,500.00 $3,500.00 $1,000.00 $1,000.00 2 TOPSOIL, AMENDED CY 87.9 $60.00 $5,274.00 $50.00 $4,395.00 $100.00 $8,790.00 $150.00 $13,185.00 3 EXCAVATION, CLASS 10 CY 8192 $6.00 $49,152.00 $6.25 $51,200.00 $8.99 $73,646.08 $5.00 $40,960.00 4 SUBBASE MODIFIED, 6 INCH SY 2454 $15.00 $36,810.00 $10.00 $24,540.00 $12.52 $30,724.08 $14.00 $34,356.00 5 SANITARTY SEWER SERVICE, PVC, 6 INCH LF 377 $100.00 $37,700.00 $55.00 $20,735.00 $66.00 $24,882.00 $63.00 $23,751.00 6 SANITARTY SEWER CLEANOUT EA 3 $500.00 $1,500.00 $300.00 $900.00 $1,650.00 $4,950.00 $1,575.00 $4,725.00 7 PIPE CULVERT, TRENCHED, CMP, 18"LF 70 $45.00 $3,150.00 $50.00 $3,500.00 $113.00 $7,910.00 $108.00 $7,560.00 8 PIPE APRON, CMP, 18"EA 4 $500.00 $2,000.00 $400.00 $1,600.00 $3,100.00 $12,400.00 $2,950.00 $11,800.00 9 SUBDRAIN, 8 INCH, NON-PERFORATED LF 151 $20.00 $3,020.00 $30.00 $4,530.00 $53.00 $8,003.00 $55.50 $8,380.50 10 SUBDRAIN CLEANOUT, 1A, 6"EA 3 $300.00 $900.00 $300.00 $900.00 $1,500.00 $4,500.00 $1,365.00 $4,095.00 11 SUBDRAIN OUTLETS AND RODENT GUARD EA 2 $150.00 $300.00 $300.00 $600.00 $800.00 $1,600.00 $765.00 $1,530.00 12 WTER SERVICE PIPE, 1 1/2"LF 491 $40.00 $19,640.00 $13.50 $6,628.50 $20.00 $9,820.00 $18.00 $8,838.00 13 WATER SERVICE PIPE, TYPE K COPPER, 1"LF 45 $50.00 $2,250.00 $30.00 $1,350.00 $50.00 $2,250.00 $45.00 $2,025.00 14 WATER SERVICE CORPORATION, 1 1/2"EA 1 $750.00 $750.00 $4,000.00 $4,000.00 $1,500.00 $1,500.00 $1,375.00 $1,375.00 15 WATER SERVICE CURB STOP AND BOX, 1 1/2"EA 1 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,375.00 $1,375.00 16 WATER SERVICE METER PIT, PRECAST, 60 INCH EA 1 $4,000.00 $4,000.00 $5,500.00 $5,500.00 $7,400.00 $7,400.00 $6,900.00 $6,900.00 17 INTAKE, TEMPORARY PLAYGROUND DRAIN EA 2 $200.00 $400.00 $750.00 $1,500.00 $2,000.00 $4,000.00 $1,575.00 $3,150.00 18 CURB AND GUTTER, 30", 9"THICK, 6" CURB LF 82 $70.00 $5,740.00 $45.00 $3,690.00 $42.00 $3,444.00 $60.00 $4,920.00 19 REMOVAL OF SIDEWALK SY 50 $15.00 $750.00 $18.00 $900.00 $9.00 $450.00 $25.00 $1,250.00 20 SIDEWALK, PCC, 6"SY 495 $70.00 $34,650.00 $47.50 $23,512.50 $42.30 $20,938.50 $135.00 $66,825.00 21 SIDEWALK, PCC, 4"SY 32.2 $60.00 $1,932.00 $54.00 $1,738.80 $33.75 $1,086.75 $115.00 $3,703.00 22 DETECTABLE WARNING SF 70 $55.00 $3,850.00 $75.00 $5,250.00 $50.00 $3,500.00 $55.00 $3,850.00 23 CURB AND GUTTER REMOVAL LF 82 $20.00 $1,640.00 $25.00 $2,050.00 $9.00 $738.00 $30.00 $2,460.00 24 PAINTED PAVEMENT MARKINGS, DURABLE STA 8.4 $200.00 $1,680.00 $850.00 $7,140.00 $180.00 $1,512.00 $800.00 $6,720.00 25 PARK SIGN FOOTING EA 2 $2,000.00 $4,000.00 $1,000.00 $2,000.00 $400.00 $800.00 $1,000.00 $2,000.00 26 DRINKING FOUNTAIN DRAINAGE PIT LS 1 $1,000.00 $1,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $4,725.00 $4,725.00 27 PEDESTRIAN CROSSING SIGN EA 4 $1,000.00 $4,000.00 $500.00 $2,000.00 $200.00 $800.00 $500.00 $2,000.00 28 TEMPORARY TRAFFIC CONTROL LS 1 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $5,000.00 $5,000.00 $4,000.00 $4,000.00 29 CONVENTIONAL SEEDING, TYPE I SEEDING, FERTILIZING, AND MULCHING AC 2.16 $5,000.00 $10,800.00 $4,000.00 $8,640.00 $874.50 $1,888.92 $875.00 $1,890.00 30 CONVENTIONAL SEEDING, TYPE II SEEDING, FERTILIZING, AND MULCHING AC 0.64 $4,000.00 $2,560.00 $4,000.00 $2,560.00 $863.50 $552.64 $875.00 $560.00 31 SOD SQ 200 $100.00 $20,000.00 $60.00 $12,000.00 $49.50 $9,900.00 $50.00 $10,000.00 32 SHRUBS 9 (GAL)EA 13 $75.00 $975.00 $75.00 $975.00 $93.50 $1,215.50 $93.50 $1,215.50 33 ORNAMENTAL TREE EA 8 $400.00 $3,200.00 $500.00 $4,000.00 $423.50 $3,388.00 $420.00 $3,360.00 34 PERENNIAL GROUND COVER (1 GAL)EA 507 $16.00 $8,112.00 $30.00 $15,210.00 $21.18 $10,738.26 $21.00 $10,647.00 35 CANOPY TREE EA 8 $550.00 $4,400.00 $425.00 $3,400.00 $544.50 $4,356.00 $550.00 $4,400.00 36 EVERGREEN TREE EA 17 $550.00 $9,350.00 $500.00 $8,500.00 $546.70 $9,293.90 $550.00 $9,350.00 37 SWPPP PREPARATION LS 1 $1,500.00 $1,500.00 $5,000.00 $5,000.00 $1,100.00 $1,100.00 $1,100.00 $1,100.00 38 SWPP MANAGEMENT LS 1 $3,000.00 $3,000.00 $5,000.00 $5,000.00 $3,410.00 $3,410.00 $3,400.00 $3,400.00 39 TEMPORARY RECP, 3B SY 833 $20.00 $16,660.00 $3.00 $2,499.00 $2.74 $2,282.42 $2.75 $2,290.75 40 WATTLE, INSTALL, MAINTAIN, REMOVE LF 631 $2.50 $1,577.50 $2.00 $1,262.00 $3.19 $2,012.89 $3.25 $2,050.75 41 RIP RAP, EROSION STONE TON 20 $90.00 $1,800.00 $50.00 $1,000.00 $71.00 $1,420.00 $50.00 $1,000.00 42 SILT FENCE, INSTALL, MAINTAIN, REMOVE LF 1505 $2.00 $3,010.00 $2.25 $3,386.25 $3.08 $4,635.40 $3.00 $4,515.00 43 STABILIZED CONSTRUCTION ENTRANCE SY 125 $20.00 $2,500.00 $15.00 $1,875.00 $12.00 $1,500.00 $25.00 $3,125.00 44 INLET PROTECTION DEVICE EA 9 $200.00 $1,800.00 $220.00 $1,980.00 $176.00 $1,584.00 $175.00 $1,575.00 45 CONSTRUCTION SURVEY LS 1 $3,000.00 $3,000.00 $5,000.00 $5,000.00 $4,000.00 $4,000.00 $10,000.00 $10,000.00 46 MOBILIZATION LS 1 $56,000.00 $56,000.00 $16,500.00 $16,500.00 $46,500.00 $46,500.00 $180,000.00 $180,000.00 47 CONCRETE WASHOUT LS 1 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 48 ELECTRICAL SYSTEM LS 1 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $24,000.00 $24,000.00 $10,000.00 $10,000.00 49 SHELTER/RESTROOM LS 1 $120,000.00 $120,000.00 $116,052.95 $116,052.95 $112,400.00 $112,400.00 $125,000.00 $125,000.00 50 PICKLEBALL COURT LS 1 $80,000.00 $80,000.00 $81,500.00 $81,500.00 $136,300.00 $136,300.00 $85,000.00 $85,000.00 51 SITE RESTORATION SY 250 $20.00 $5,000.00 $20.00 $5,000.00 $5.00 $1,250.00 $25.00 $6,250.00 TOTAL BASE BID $606,832.50 $499,000.00 $635,872.34 $755,687.50 Howrey Construction, Inc Rockwell City, IA Concrete Connection LLC Johnston, IA Caliber Concrete LLC Adair, IA Bid Letting Date, September 8th, 2021 @ 2:00 PM City of Waukee Sugar Creek Pakr Waukee, IA TABULATION OF BIDS Page 1 of 2 Bid Letting Date, September 8th, 2021 @ 2:00 PM City of Waukee Sugar Creek Pakr Waukee, IA TABULATION OF BIDS ALTERNATE A A1 SHARED USE PATH, PCC, 6"SY 1144 $60.00 $68,640.00 $40.00 $45,760.00 $50.00 $57,200.00 $50.00 $57,200.00 TOTAL ALTERNATE A BID $45,760.00 $57,200.00 $57,200.00 ALTERNATE B B1 SHARED USE PATH, HMAQ, 6" MIX (300K ESALS, PG58-28S SY 1144 $60.00 $68,640.00 $47.00 $53,768.00 $54.00 $61,776.00 No Bid No Bid TOTAL ALTERNATE B BID $53,768.00 $61,776.00 ALTERNATE C C1 ELECTRICAL CIRCUIT LS 1 $10,000.00 $10,000.00 $11,000.00 $11,000.00 $11,600.00 $11,600.00 $9,000.00 $9,000.00 C2 POST TOP MOUNTED LUMINAIRE EA 8 $2,300.00 $18,400.00 $1,350.00 $10,800.00 $2,500.00 $20,000.00 $2,800.00 $22,400.00 C3 POST TOP MOUNTED LUMINAIRE FOOTING EA 8 $800.00 $6,400.00 $3,000.00 $24,000.00 $930.00 $7,440.00 $900.00 $7,200.00 TOTAL ALTERNATE C BID $45,800.00 $39,040.00 $38,600.00 TOTAL BASE BID PLUS ALTERNATE A $675,472.50 $544,760.00 $693,072.34 $812,887.50 TOTAL BASE BID PLUS ALTERNATE B $675,472.50 $552,768.00 $697,648.34 $755,687.50 8-Sep-21 H:\WAUKEE_CI_IA\0A1124531\6_Plans-Specs\B_Bid Documents\0_VBid Documents\[BidTab.xlsx]Bid Tabulation Page 2 of 2