SYNOPSIS INCLUDING PRO & CON: The project bid letting was held at Waukee City Hall
on September 8th, 2021 at 2:00 p.m. Three (3) bids were received with
the low base bid plus Alternate A from Concrete Connection LLC. in the
amount of $544,760.00. Alternate A is construction of the trails with
concrete. Alternate B was the option to construct the trails in asphalt.
The bid form included Alternate C (8 Post Top Mounted Luminaire
along the trail). Staff is recommending approval of the base bid plus
Alternate A in the amount of $544,760 and Alternate C in the amount of
$45,800 for a total bid of $590,560.00.
Concrete Connections was the contractor that completed the Trailside
Dog Park Project.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:$590,560.00
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: City staff recommends awarding the contract to Concrete Connection
LLC.
ATTACHMENTS: I. Proposed resolution
II. Bid tabulation
III. Engineers Memo and Recommendation
PREPARED BY: Matt Jermier
REVIEWED BY:
H1B
RESOLUTION 2021-
RESOLUTION MAKING AWARD OF CONSTRUCTION
CONTRACT FOR THE SUGAR CREEK PARK
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE
OF IOWA:
Section 1.That the following bid for the construction of certain public improvements
described in general as the Sugar Creek Park, described in the plans and specifications heretofore
adopted by this Council on September 20, 2021, be and is hereby accepted, the same being the
lowest responsive, responsible bid received for such work, as follows:
Contractor:Concrete Connection, LLC,of Johnston, IA
Amount of bid:$590,560.00
Portion of project:All construction work
Section 2.That the Mayor and Clerk are hereby directed to execute the contract with the
contractor for the construction of the public improvements, such contract not to be binding on the
City until approved by this Council.
PASSED AND APPROVED this 20th day of September, 2021.
Mayor
ATTEST:
City Clerk
September 13th, 2021
City of Waukee, IA
Rebecca Schuett, City Clerk
230 W. Hickman Road
Waukee, IA 50263
RE: Sugar Creek Park
Recommendation of Award
Dear Rebecca Schuett:
At 2:00 PM on September 8th, 2021, bids were received for the Sugar Creek Park. The Engineer’s Estimate for the
Base Bid plus Alternate A of the project was $675,472.50. Three bids were received, all bidders were responsive,
and bids for the Base Bid plus Alternate A are summarized as follows:
Bidder Base Bid Plus Alternate A
Amount
Concrete Connection LLC $544,760.00
Caliber Concrete LLC $693,072.34
Howrey Construction, Inc $812,887.50
The bid received from Concrete Connection LLC was 19.35% below the engineer’s estimate for the project and was
determined to be the lowest responsive bidder. Bolton & Menk, Inc has reviewed the bid documents submitted
and checked references on this bidder and was satisfied with responses given. Due to bids received, Bolton &
Menk, recommends awarding Alternate C as a part of the project.
Therefore, Bolton & Menk, Inc. recommends award of the Sugar Creek Park project to Concrete Connection LLC,
for the Base Bid plus Alternate A and Alternate C for the bid amount of $590,560.00 (Five Hundred Ninety
Thousand Five Hundred Sixty Dollars and Zero Cents).
Feel free to contact me should there be any questions related to this project.
Sincerely,
Charles Kahlsdorf, P.E., PMP
Project Manager
BOLTON & MENK, INC.
Cc: File w/attachment
Line Engineer's Estimate
No.Description Unit Quantity Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
1 CLEARING AND GRUBBING LS 1 $2,500.00 $2,500.00 $1,000.00 $1,000.00 $3,500.00 $3,500.00 $1,000.00 $1,000.00
2 TOPSOIL, AMENDED CY 87.9 $60.00 $5,274.00 $50.00 $4,395.00 $100.00 $8,790.00 $150.00 $13,185.00
3 EXCAVATION, CLASS 10 CY 8192 $6.00 $49,152.00 $6.25 $51,200.00 $8.99 $73,646.08 $5.00 $40,960.00
4 SUBBASE MODIFIED, 6 INCH SY 2454 $15.00 $36,810.00 $10.00 $24,540.00 $12.52 $30,724.08 $14.00 $34,356.00
5 SANITARTY SEWER SERVICE, PVC, 6 INCH LF 377 $100.00 $37,700.00 $55.00 $20,735.00 $66.00 $24,882.00 $63.00 $23,751.00
6 SANITARTY SEWER CLEANOUT EA 3 $500.00 $1,500.00 $300.00 $900.00 $1,650.00 $4,950.00 $1,575.00 $4,725.00
7 PIPE CULVERT, TRENCHED, CMP, 18"LF 70 $45.00 $3,150.00 $50.00 $3,500.00 $113.00 $7,910.00 $108.00 $7,560.00
8 PIPE APRON, CMP, 18"EA 4 $500.00 $2,000.00 $400.00 $1,600.00 $3,100.00 $12,400.00 $2,950.00 $11,800.00
9 SUBDRAIN, 8 INCH, NON-PERFORATED LF 151 $20.00 $3,020.00 $30.00 $4,530.00 $53.00 $8,003.00 $55.50 $8,380.50
10 SUBDRAIN CLEANOUT, 1A, 6"EA 3 $300.00 $900.00 $300.00 $900.00 $1,500.00 $4,500.00 $1,365.00 $4,095.00
11 SUBDRAIN OUTLETS AND RODENT GUARD EA 2 $150.00 $300.00 $300.00 $600.00 $800.00 $1,600.00 $765.00 $1,530.00
12 WTER SERVICE PIPE, 1 1/2"LF 491 $40.00 $19,640.00 $13.50 $6,628.50 $20.00 $9,820.00 $18.00 $8,838.00
13 WATER SERVICE PIPE, TYPE K COPPER, 1"LF 45 $50.00 $2,250.00 $30.00 $1,350.00 $50.00 $2,250.00 $45.00 $2,025.00
14 WATER SERVICE CORPORATION, 1 1/2"EA 1 $750.00 $750.00 $4,000.00 $4,000.00 $1,500.00 $1,500.00 $1,375.00 $1,375.00
15 WATER SERVICE CURB STOP AND BOX, 1 1/2"EA 1 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,375.00 $1,375.00
16 WATER SERVICE METER PIT, PRECAST, 60 INCH EA 1 $4,000.00 $4,000.00 $5,500.00 $5,500.00 $7,400.00 $7,400.00 $6,900.00 $6,900.00
17 INTAKE, TEMPORARY PLAYGROUND DRAIN EA 2 $200.00 $400.00 $750.00 $1,500.00 $2,000.00 $4,000.00 $1,575.00 $3,150.00
18 CURB AND GUTTER, 30", 9"THICK, 6" CURB LF 82 $70.00 $5,740.00 $45.00 $3,690.00 $42.00 $3,444.00 $60.00 $4,920.00
19 REMOVAL OF SIDEWALK SY 50 $15.00 $750.00 $18.00 $900.00 $9.00 $450.00 $25.00 $1,250.00
20 SIDEWALK, PCC, 6"SY 495 $70.00 $34,650.00 $47.50 $23,512.50 $42.30 $20,938.50 $135.00 $66,825.00
21 SIDEWALK, PCC, 4"SY 32.2 $60.00 $1,932.00 $54.00 $1,738.80 $33.75 $1,086.75 $115.00 $3,703.00
22 DETECTABLE WARNING SF 70 $55.00 $3,850.00 $75.00 $5,250.00 $50.00 $3,500.00 $55.00 $3,850.00
23 CURB AND GUTTER REMOVAL LF 82 $20.00 $1,640.00 $25.00 $2,050.00 $9.00 $738.00 $30.00 $2,460.00
24 PAINTED PAVEMENT MARKINGS, DURABLE STA 8.4 $200.00 $1,680.00 $850.00 $7,140.00 $180.00 $1,512.00 $800.00 $6,720.00
25 PARK SIGN FOOTING EA 2 $2,000.00 $4,000.00 $1,000.00 $2,000.00 $400.00 $800.00 $1,000.00 $2,000.00
26 DRINKING FOUNTAIN DRAINAGE PIT LS 1 $1,000.00 $1,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $4,725.00 $4,725.00
27 PEDESTRIAN CROSSING SIGN EA 4 $1,000.00 $4,000.00 $500.00 $2,000.00 $200.00 $800.00 $500.00 $2,000.00
28 TEMPORARY TRAFFIC CONTROL LS 1 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $5,000.00 $5,000.00 $4,000.00 $4,000.00
29 CONVENTIONAL SEEDING, TYPE I SEEDING, FERTILIZING, AND MULCHING AC 2.16 $5,000.00 $10,800.00 $4,000.00 $8,640.00 $874.50 $1,888.92 $875.00 $1,890.00
30 CONVENTIONAL SEEDING, TYPE II SEEDING, FERTILIZING, AND MULCHING AC 0.64 $4,000.00 $2,560.00 $4,000.00 $2,560.00 $863.50 $552.64 $875.00 $560.00
31 SOD SQ 200 $100.00 $20,000.00 $60.00 $12,000.00 $49.50 $9,900.00 $50.00 $10,000.00
32 SHRUBS 9 (GAL)EA 13 $75.00 $975.00 $75.00 $975.00 $93.50 $1,215.50 $93.50 $1,215.50
33 ORNAMENTAL TREE EA 8 $400.00 $3,200.00 $500.00 $4,000.00 $423.50 $3,388.00 $420.00 $3,360.00
34 PERENNIAL GROUND COVER (1 GAL)EA 507 $16.00 $8,112.00 $30.00 $15,210.00 $21.18 $10,738.26 $21.00 $10,647.00
35 CANOPY TREE EA 8 $550.00 $4,400.00 $425.00 $3,400.00 $544.50 $4,356.00 $550.00 $4,400.00
36 EVERGREEN TREE EA 17 $550.00 $9,350.00 $500.00 $8,500.00 $546.70 $9,293.90 $550.00 $9,350.00
37 SWPPP PREPARATION LS 1 $1,500.00 $1,500.00 $5,000.00 $5,000.00 $1,100.00 $1,100.00 $1,100.00 $1,100.00
38 SWPP MANAGEMENT LS 1 $3,000.00 $3,000.00 $5,000.00 $5,000.00 $3,410.00 $3,410.00 $3,400.00 $3,400.00
39 TEMPORARY RECP, 3B SY 833 $20.00 $16,660.00 $3.00 $2,499.00 $2.74 $2,282.42 $2.75 $2,290.75
40 WATTLE, INSTALL, MAINTAIN, REMOVE LF 631 $2.50 $1,577.50 $2.00 $1,262.00 $3.19 $2,012.89 $3.25 $2,050.75
41 RIP RAP, EROSION STONE TON 20 $90.00 $1,800.00 $50.00 $1,000.00 $71.00 $1,420.00 $50.00 $1,000.00
42 SILT FENCE, INSTALL, MAINTAIN, REMOVE LF 1505 $2.00 $3,010.00 $2.25 $3,386.25 $3.08 $4,635.40 $3.00 $4,515.00
43 STABILIZED CONSTRUCTION ENTRANCE SY 125 $20.00 $2,500.00 $15.00 $1,875.00 $12.00 $1,500.00 $25.00 $3,125.00
44 INLET PROTECTION DEVICE EA 9 $200.00 $1,800.00 $220.00 $1,980.00 $176.00 $1,584.00 $175.00 $1,575.00
45 CONSTRUCTION SURVEY LS 1 $3,000.00 $3,000.00 $5,000.00 $5,000.00 $4,000.00 $4,000.00 $10,000.00 $10,000.00
46 MOBILIZATION LS 1 $56,000.00 $56,000.00 $16,500.00 $16,500.00 $46,500.00 $46,500.00 $180,000.00 $180,000.00
47 CONCRETE WASHOUT LS 1 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00
48 ELECTRICAL SYSTEM LS 1 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $24,000.00 $24,000.00 $10,000.00 $10,000.00
49 SHELTER/RESTROOM LS 1 $120,000.00 $120,000.00 $116,052.95 $116,052.95 $112,400.00 $112,400.00 $125,000.00 $125,000.00
50 PICKLEBALL COURT LS 1 $80,000.00 $80,000.00 $81,500.00 $81,500.00 $136,300.00 $136,300.00 $85,000.00 $85,000.00
51 SITE RESTORATION SY 250 $20.00 $5,000.00 $20.00 $5,000.00 $5.00 $1,250.00 $25.00 $6,250.00
TOTAL BASE BID $606,832.50 $499,000.00 $635,872.34 $755,687.50
Howrey Construction, Inc
Rockwell City, IA
Concrete Connection LLC
Johnston, IA
Caliber Concrete LLC
Adair, IA
Bid Letting Date, September 8th, 2021 @ 2:00 PM
City of Waukee
Sugar Creek Pakr
Waukee, IA
TABULATION OF BIDS
Page 1 of 2
Bid Letting Date, September 8th, 2021 @ 2:00 PM
City of Waukee
Sugar Creek Pakr
Waukee, IA
TABULATION OF BIDS
ALTERNATE A
A1 SHARED USE PATH, PCC, 6"SY 1144 $60.00 $68,640.00 $40.00 $45,760.00 $50.00 $57,200.00 $50.00 $57,200.00
TOTAL ALTERNATE A BID $45,760.00 $57,200.00 $57,200.00
ALTERNATE B
B1 SHARED USE PATH, HMAQ, 6" MIX (300K ESALS, PG58-28S SY 1144 $60.00 $68,640.00 $47.00 $53,768.00 $54.00 $61,776.00 No Bid No Bid
TOTAL ALTERNATE B BID $53,768.00 $61,776.00
ALTERNATE C
C1 ELECTRICAL CIRCUIT LS 1 $10,000.00 $10,000.00 $11,000.00 $11,000.00 $11,600.00 $11,600.00 $9,000.00 $9,000.00
C2 POST TOP MOUNTED LUMINAIRE EA 8 $2,300.00 $18,400.00 $1,350.00 $10,800.00 $2,500.00 $20,000.00 $2,800.00 $22,400.00
C3 POST TOP MOUNTED LUMINAIRE FOOTING EA 8 $800.00 $6,400.00 $3,000.00 $24,000.00 $930.00 $7,440.00 $900.00 $7,200.00
TOTAL ALTERNATE C BID $45,800.00 $39,040.00 $38,600.00
TOTAL BASE BID PLUS ALTERNATE A $675,472.50 $544,760.00 $693,072.34 $812,887.50
TOTAL BASE BID PLUS ALTERNATE B $675,472.50 $552,768.00 $697,648.34 $755,687.50
8-Sep-21
H:\WAUKEE_CI_IA\0A1124531\6_Plans-Specs\B_Bid Documents\0_VBid Documents\[BidTab.xlsx]Bid Tabulation