CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: October 4, 2021
AGENDA ITEM: Consideration of approval of a resolution approving a final plat for Glynn
Village Plat 12
FORMAT: Resolution
SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a final plat for a
5.75-acre development for a townhome development located on the east and
west sides of Warrior Lane, north of SE Westown Parkway. The plat identifies
41 townhome lots. Utilities will be extended to the units from nearby existing
mains.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission
reviewed the final plat request at their meeting on September 28, 2021
and recommended approval:
Approval of a Final Plat for Glynn Village Plat 12
Senior Planner Melissa DeBoer introduced the request for approval of a preliminary plat,
final plat, and site plan as submitted by the applicant, Hubbell metropolitan Development
Fund 1, LLC, for a townhome development. The subject property is generally located to the
east and west of S Warrior Lane and north of SE Westown Parkway, containing
approximately 5.75 acres.
Mrs. DeBoer advised that the project identifies a total of 11 townhome buildings with a
total of 41 townhome units. Each unit will be assigned its own lot of record. The lots range in
size from 3,163 square feet to 16,958 square feet. The final plat identifies all proposed
easements, including those for ingress/egress. Access to the units will be provided via
alleyways off of Warrior Lane. An 8-foot wide trail is identified along the east side of S
Warrior lane, and a five foot wide sidewalk is identified on the west side of S Warrior lane.
Public Utilities will serve the lots and storm water detention is managed through existing
detention from previous phases of the development. All Landscaping, open space, parking,
and elevation requirements have been met at this time.
Staff would recommend the approval of the preliminary plat, final plat, and site plan for
Glynn Village Plat 12 subject to remaining staff comments and review of the legal documents.
Commissioner Hoifeldt questioned if this completes the development. Mr. Kass
advised that was correct.
J6
Commissioner Inman questioned if the Homeowner’s Association would now take
over. Mr. Kass advised that was correct. The HOA would become the enforcing body
of the covenants once this development completes.
Commissioner Streit moved to approve the final plat for Glynn Village Plat 12 subject
to any remaining staff comments and review of the legal documents. Commissioner Inman
seconded the motion. Ayes: Streit, Broderick, Hoifeldt, Inman, Ward, and Conley. Nays:
none. Motion Carried.
STAFF REVIEW AND COMMENT: Staff recommends approval of the final plat.
RECOMMENDATION: Approve the resolution.
ATTACHMENTS: I. Proposed Resolution
II. Staff Report
III. Final Plat
PREPARED BY: Melissa DeBoer, Senior Planner
REVIEWED BY:
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
THE CITY OF WAUKEE, IOWA
RESOLUTION 2021-
APPROVING THE FINAL PLAT FOR GLYNN VILLAGE PLAT 12
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, Hubbell Metropolitan Development Fund I, LLC, has requested final plat approval of Glynn
Village Plat 12 (the “Plat”); AND,
WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Plat on
September 28, 2021, subject to remaining staff comments and review of the legal documents; AND,
WHEREAS, the Final Plat for Glynn Village Plat 12 and the documents relating thereto will comply with
Section §303 - Land Subdivision Ordinance of the Waukee Municipal Code.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 4th
day of October, 2021, that the Final Plat for Glynn Village Plat 12 be and the same is hereby accepted and
approved by the City Council of the City of Waukee.
BE IT FURTHER RESOLVED that the City of Waukee does hereby accept the following easements and
documents to be filed with the Plat:
1. Public Utility Easement
2. Private Storm Sewer Easement
3. Private Ingress-Egress Easement; and
4. Private Landscape Buffer Easement.
____________________________
Courtney Clarke, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Anna Bergman Pierce
R. Charles Bottenberg
Chris Crone
Larry R. Lyon
Ben Sinclair
PLANNING AND ZONING COMMISSION STAFF REPORT
PROJECT: Glynn Village Plat 12 – Preliminary
Plat / Site Plan and Final Plat
PREPARED BY: Melissa DeBoer, AICP – Senior Planner
REPORT DATE: September 24, 2021
MEETING DATE: September 28, 2021
GENERAL INFORMATION
Owner/Applicant: Hubbell Metropolitan Development Fund I, LLC
Project Manager: Dustin Creech, P.E. – ERG
Request: The applicant is requesting approval of a preliminary
plat / site plan and final plat for a townhome
development.
Location and Size: Property is located on the east and west sides of
Warrior Lane, north of SE Westown Parkway,
containing approximately 5.75 acres.
AREA MAP
ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area.
September 24, 2021
2 of 3
LAND USES AND ZONING
Location Existing Land Use Comprehensive Plan Current Zoning
Property in
Question
Vacant – Undeveloped Medium Density
Residential
R-4 / PD-1 (Row Dwelling and
Townhome Dwelling District with
a Planned Development
Overlay)
North Townhomes Medium Density
Residential R-4 / PD-1 (Row Dwelling and
Townhome Dwelling District with
a Planned Development
Overlay)
South Single Family Residential Single Family
Residential
R-2 / PD-1 (One and Two Family
Residential District with a
Planned Development Overlay)
East Single Family Residential Single Family
Residential R-2 / PD-1 (One and Two Family
Residential District with a
Planned Development Overlay)
West Single Family Residential Single Family
Residential R-2 / PD-1 (One and Two Family
Residential District with a
Planned Development Overlay)
BACKGROUND
The subject property is located within the Glynn Village neighborhood, located south of University Avenue
and north of Westown Parkway. This request is the last phase of the townhome development within Glynn
Village.
PROJECT DESCRIPTION
The project includes a total of 11 townhome buildings with a total of 41 townhome units for the entire site.
Each unit accounts for one lot for a total of 41 corresponding lots. The buildings range between two to five
units per building. The lots range in size from 3,163 square feet to 16,958 square feet. The units range in size
from 1,274 square feet to 1,773 square feet. A mix of one-story and two-story units are proposed.
The final plat identifies the 41 townhome lots as well as the proposed easements, including the ingress/egress
easements for the shared drives.
ACCESS AND PARKING
Access to the units will be provided via alleyways off of Warrior Lane. The alleyways are 25.5 feet in width
which is consistent with the previous, adjacent phases of townhome development in Glynn Village. Parking
spaces will be provided along the edges of the alleyways to satisfy visitor parking space requirements. A total
of 65 parking spaces will be provided within the alleyways.
SIDEWALKS/TRAILS
An 8-foot wide trail will be constructed along the east side of Warrior Lane and a 5-foot side sidewalk will be
constructed along the west side of Warrior Lane. This is consistent with existing, adjacent development.
Private sidewalks will also be constructed interior to the development with widths of 3-feet and 5-feet.
September 24, 2021
3 of 3
UTILITIES
Sanitary sewer service will be provided with the existing sanitary sewer located within the rear of the lots.
Storm services will also be provided with the existing storm sewer main located within the rear of the lots.
Storm water detention will be provided within existing facilities constructed as part of previous phases of
Glynn Village. Water will be provided from and existing 8-inch main on the west side of Warrior Lane and an
existing 4-inch main on the east side of Warrior Lane.
LANDSCAPING
A 25-foot landscape buffer easement is provided along the rear of all units to provide screening of the
alleyway and garages from the adjacent single-family residential development. The proposed site plan provides
for the required landscaping. The required amount of plantings per unit has also been provided for (2 trees
per unit).
ELEVATIONS
Six building types are proposed to be constructed as part of this project. The building materials proposed
include vinyl siding, board and batton siding, stone veneer, and asphalt shingles. The units include front
porches and rear loaded garages.
COMPREHENSIVE PLAN
The Comprehensive Plan classifies the subject property as Medium Density Residential. The Medium Density
Residential classification provides for a variety of attached side-by-side townhome and row home products.
The Plan states that neighborhoods should include a variety of housing options that accommodate a range of
needs, price points and life stages of residents.
STAFF RECOMMENDATION
The proposed preliminary plat, site plan and final plat are in general conformance with the Zoning Ordinance,
Subdivision Ordinance, Site Plan Ordinance, Planned Development Ordinance and Comprehensive Plan. Staff
recommends approval subject to any remaining staff comments and review of the legal documents.
GLYNN VILLAGE PLAT 12 GLYNN VILLAGE PLAT 12J:\2021 Proj\21-066\Design\Final Plat\21-066-FP.dwg, 8/27/2021 7:56:31 AM, DFR
GLYNN VILLAGE PLAT 12GLYNN VILLAGE PLAT 12
J:\2021 Proj\21-066\Design\Final Plat\21-066-FP.dwg, 8/27/2021 7:56:35 AM, DFR
GLYNN VILLAGE PLAT 12GLYNN VILLAGE PLAT 12
J:\2021 Proj\21-066\Design\Final Plat\21-066-FP.dwg, 8/27/2021 7:56:40 AM, DFR
GLYNN VILLAGE PLAT 12GLYNN VILLAGE PLAT 12
J:\2021 Proj\21-066\Design\Final Plat\21-066-FP.dwg, 8/27/2021 7:56:45 AM, DFR
GLYNN VILLAGE PLAT 12GLYNN VILLAGE PLAT 12
J:\2021 Proj\21-066\Design\Final Plat\21-066-FP.dwg, 8/27/2021 7:56:50 AM, DFR