Loading...
HomeMy WebLinkAbout2021-11-01-J01F_01Triumph Park_Change Order 5AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: November 1, 2021 AGENDA ITEM:Consideration of approval of Change Order No. 5 to Larson Construction, Co., Inc., for the Triumph Park Project increasing the contract in the amount of $53,889.71. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 5 to Larson Construction, Co., Inc., is for: Item #1: (27,229.70) This is a minor change in the detailed construction of the concrete curbs within the ballpark plaza areas. The original design called for individually formed curbs throughout the plaza spaces and the walkways would have been poured up against them. The contractor installed the first ones as an integral curb with the adjacent walkway. The allowed the color concrete to also be reflected on the curb. City Staff and design team reviewed the installed portion and agreed that the look and final product was acceptable, but also agreed that it was less work than the originally designed curb details. This is a credit for the reduced amount of labor to install these curbs. Items #2: $81,119.41 During the shop drawing process, the design team received a detail from the playground surface installer that included an asphalt base under the poured in place surfacing material of the Miracle Field. The design team previously discussed this with the playground manufacturer and installer and had understood that this poured in place soft surface could be placed on compacted gravel and detailed it accordingly in the drawing set. After much debate and additional coordination and research; everyone is in agreement that the best long-term solution for the field is for it to b have an asphalt base course. This change is to modify the sub-base to be 5” of Asphalt to be placed in two lifts with 4” of rock surface below. There is a small credit for grading and a decreased amount of rock. A majority of this cost is the material and labor necessary to complete the asphalt work. Project Budget Update Total Construction Project Total: $18,866,000 Change Order 1-5 Total: $326,751.42 Budgeted Contingency (3%) Total: $592,080.00 Remaining Contingency Total: $265,328.58 Percentage of Project Complete(Estimate) 70-80% completed due to all 3 ball field quads being exactly the same FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: J1F1 STAFF REVIEW AND COMMENT: Approve Change Order RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Change Order No. 5 PREPARED BY: Matt Jermier REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: October 25, 2021 Mr. Matt Jermier, Director Waukee Parks and Recreation Department City of Waukee 805 University Avenue Waukee, IA 50263 RE: Change Order #5 Triumph Park Dear Mr. Jermier: Attached please find Change Order #5 totaling the amount of $53,889.71, for approval and signature by Waukee City Council. Quantities have been reviewed and agreed upon by the contractor, City staff, and Confluence. The City and the Design Team have been on site reviewing items, attending meetings and completing site review several times a week for the past months. The two items below are all things that have been thoroughly reviewed with the team. One of them is a credit that the city and design team are willing to accept on the change of the installation method of the curb and gutter. It saves time and the owner money to accept this very similar final product. The second item is beyond the initial scope of work. As you know, many discussions happen in the field, get approved and we agree to move forward with no cost changes. Your staff and design team are working hard to keep these change orders to a minimum. This Change Order accounts for two items: Item #1: (Concrete Curb Detail Adjustment) ($27,229.70) This is a minor change in the detailed construction of the concrete cubs within the ballpark plaza areas. The original design called for individually formed curbs throughout the plaza spaces and the walkways would have been poured up against them. The contractor installed the first ones as an integral curb with the adjacent walkway. This allowed the color concrete to also be reflected on the curb. The owner and design team reviewed the installed portion and agreed that the look and final product was acceptable, but also agreed that it was less work than the originally designed curb details. This is a credit for the reduced amount of labor to install these curbs. Item #2: (Added Asphalt Base – Miracle Field) $81,119.41 During the shop drawing process, we received a detail from the playground surface installer that included an asphalt base under the poured in place surfacing material of the Miracle Field. We had previously discussed this with the playground manufacturer and installer and had understood that this poured in place soft surface could be placed on compacted gravel and detailed it accordingly in the drawing set. After much debate and additional coordination and research; we are all in agreement that the best long-term solution for the field is for it to have an asphalt base course. This change is to modify the sub-base to be 5” of Asphalt to be placed in two lifts with 4” of rock surface below. There is a small credit for grading and a decreased amount of rock. A majority of this cost is the material and labor necessary to complete the asphalt work. Confluence recommends approval of CO with payment as indicated. If there are any questions, please let me know. Respectfully, Confluence City of Waukee ___________ ____________________________________ Matthew O. Carlile, PLA, ASLA. LEED AP Tim Moerman Principal City Administrator 525 17TH STREET DES MOINES, IA 50309 RE: Triumph Park Scope of work to be done: Cost Summary: Subcontractors -$ Supplier -$ LCCI (25,740.00)$ Sub-Total (25,740.00)$ 2.5% OH&P (Subcontractors)-$ 5% OH&P (LCCI/Suppliers)(1,287.00)$ 0.75% Bond (202.70)$ TOTAL (27,229.70)$ Respectfully, Jeff Mertz Larson Construction Co., Inc. Per - Change Planter Curbs from Formed to Rolled. This will change the curb from 7/L514 to a detail similar to 13/L500 boured integral with the paving. Independence, Iowa 50644 PO Box 112 Phone 319.334.7061 www.larsonconst.com August 25, 2021 Change Order Request #014 COMMERCIAL AND INDUSTRIAL GENERAL CONTRACTORS ITEM #DESCRIPTION Quantity Unit Labor Material Unit Cost TOTAL 1 SE Quad - Baseball Chamfer Strip 2544 (1.00)$ (0.50)$ (3,816.00)$ Forming 3816 (1.00)$ (0.50)$ (5,724.00)$ 1 NE Quad - Softball Chamfer Strip 2160 (1.00)$ (0.50)$ (3,240.00)$ Forming 3240 (1.00)$ (0.50)$ (4,860.00)$ 1 NW Quad - Softball Chamfer Strip 2160 (1.00)$ (0.50)$ (3,240.00)$ Forming 3240 (1.00)$ (0.50)$ (4,860.00)$ -$ -$ -$ (25,740.00)$ - LCCI ItemsChange Order Request #014 TOTAL 525 17TH STREET DES MOINES, IA 50309 RE: Triumph Park Scope of work to be done: Cost Summary: Subcontractors 75,172.00$ Supplier -$ LCCI 900.00$ Sub-Total 76,072.00$ 5% OH&P (Subcontractors)3,758.60$ 10% OH&P (LCCI/Suppliers)90.00$ 1.5% Bond 1,198.81$ TOTAL 81,119.41$ Respectfully, Jeff Mertz Larson Construction Co., Inc. Per PR #004 - Miracle Field Surfacing Subgrade Independence, Iowa 50644 PO Box 112 Phone 319.334.7061 www.larsonconst.com October 25, 2021 Change Order Request #028 COMMERCIAL AND INDUSTRIAL GENERAL CONTRACTORS ITEM #DESCRIPTION Quantity Unit Labor Material Unit Cost TOTAL 1 Layout Fence Post 12 hr 75.00$ 900.00$ 2 -$ 3 -$ 4 -$ 5 -$ 6 -$ 7 -$ 8 -$ 9 -$ 10 -$ 11 -$ 12 -$ 13 -$ 14 -$ 15 -$ 900.00$ - LCCI ItemsChange Order Request #028 TOTAL ITEM #Company Description Quantity Unit Labor Material Bid Form Unit Cost Lump Sum TOTAL 1 Elder Corporation regrading work/ subbase credit 1 ls (1,000.00)$ (1,000.00)$ 2 Des Moines Steel Fence fencing 1 ls 0.00$ 0.00$ 3 A&M Concrete concrete paving 1 ls 4,900.00$ 4,900.00$ 4 Grimes Asphalt paying 1 ls 69,432.00$ 69,432.00$ 5 Bishop Engineering layout 1 ls 1,840.00$ 1,840.00$ 6 ls -$ -$ 7 ls -$ -$ 8 ls -$ -$ 9 ls -$ -$ 10 ls -$ -$ 11 ls -$ -$ 12 ls -$ -$ 13 ls -$ -$ 14 ls -$ -$ 15 ls -$ -$ 75,172.00$ Change Order Request #028 - Subcontractors TOTAL thinkconfluence.com PR-04R Scope Revision 1. Removed: 2” depth of aggregate subbase (approx. 115 CY) from 6” depth to 4” depth. 2. Revised: Spot elevations around bases and bottom of wall of backstop adjusted. 3. Addition: 2,022 SY of 5” depth asphalt paving, 2 lifts 3” base 2” surface. 4. Addition: 56 SY of 4” depth PCC paving within dugouts Attachments 1. 1 PR-04 – Miracle Field Plan 2. 2 PR-04 – Miracle Field Surfacing Details 3. 3 PR-04 – Miracle Field Surfacing Details 4. 4 PR-04 – Miracle Field Grading Plan End of PR-04R DATE: 10-14-2021 PROJECT: Triumph Park PROJECT #: 17393-02 LOCATION: Waukee, Iowa OWNER: City of Waukee Parks and Recreation CONSULTANT: Confluence CONTACT: John Aceto 525 17th Street Des Moines, IA 50309 jaceto@thinkconfluence.com 515-288-4875 This Proposal Request (PR) forms a part of the Contract Documents for the project. The Proposal Request modifies the original bidding documents dated July 23, 2020 with amendments and additions noted below. The contractor shall issue a proposal of adjusted contract sum for the proposed modifications. 6'-0" CHAIN LINK FENCE,SEE DETAIL 01/L509, TYP.6'-0" CHAIN LINK GATE, SEE DETAIL 05/L509EVERTOP SYSTEM COLOR # 1, SEE DETAIL13/L508EVERTOP SYSTEM COLOR # 2, SEE DETAIL13L508EVERTOP SYSTEM COLOR # 3, SEE DETAIL13/L50815'-0" WINGED FOUL POLE, REFERTO DETAIL 09/L508MIRACLE DUGOUT, SEE DETAIL 01/L51225'-0"35'-138 "35'-714"14'-734"39'-734" 50'-0"28'-31 2"70'-0"50'-0"70'-0"28'-312"R8'-818"BACKSTOP WALL, SEE DETAIL 03/L510DOUBLE CHAINLINK SWINGGATE, SEEDETAIL 02/L50942 PR-422 PR-422 PR-422 PR-433 PR-433 PR-413 PR-413 PR-4EVERTOP SURFACING WITHIN DUGOUTSSHALL HAVE 4" CONCRETE BASE, TYP.REF. DWG. SCALE: NOT TO SCALE SHEET 01 CONFLUENCE PROJECT NO: 17393-02 DATE: 10-14-2021 PR-04 TRIUMPH PARK WAUKEE, IOWA L507 1/16"=1' 1 PR-4 PLAN: MIRACLE FIELD1 COMPACTED SUBGRADE,AS SPECIFIED.COMPACTED AGGREGATESUBBASE, AS SPECIFIED.12" EVERTOP MIRACLE LEAGUE SURFACEWITH BULLNOSE EDGE AT FENCE LINE12"5"4"5" DEPTH ASPHALT PAVING, 2 LIFTS, 2"SURFACE, 3" BASECOMPACTED SUBGRADE,AS SPECIFIED.COMPACTED AGGREGATESUBBASE, AS SPECIFIED.12" EVERTOP MIRACLE LEAGUE SURFACEWITH BULLNOSE EDGE AT FENCE LINE1 2"4"4"4" DEPTH PCC PAVING WITHINEXTENTS OF DUGOUTS12" EVERTOP MIRACLELEAGUE SURFACE WITHBULLNOSE EDGE ATFENCE LINE4"4" 1 2" 4"5" 1 2"ASPHALT BASE IN PLAYAREA OF FIELDCONCRETE BASEWITHIN DUGOUTEXTENTSTOP OF CONCRETE ANDASPHALT BASE ARE TOMEET AT FLUSH BUTT JOINTAGGREGATE SUBBASE12" EVERTOP MIRACLE LEAGUESURFACE WITH BULLNOSEEDGE AT FENCE LINE4" DEPTH PCC PAVINGWITHIN EXTENTS OFDUGOUTCOMPACTED AGGREGATESUBBASEADJACENT TYPE 1PCC PAVINGEXPANSION JOINT AT EDGENOTE:1.TRANSITION BETWEEN EVERTOPSURFACING AND ADJACENT TYPE 1 PCCPAVING IS TO BE FLUSH TO ENSUREPROPER DRAINAGE AND ADA ACCESS.4"4"12"6" REF. DWG. SCALE: NOT TO SCALE SHEET 02 CONFLUENCE PROJECT NO: 17393-02 DATE: 10-14-2021 PR-04 TRIUMPH PARK WAUKEE, IOWA L508N.T.S2 PR-4SECTION: MIRACLE FIELD PLAY AREA SURFACING3N.T.S2 PR-4SECTION: MIRACLE FIELD DUGOUT SURFACING1N.T.S2 PR-4SECTION: DUGOUT SURFACING TO ADJACENT PCC PAVING4N.T.S2 PR-4SECTION: DUGOUT SURFACING TO FIELD AREA SURFACING2 ADJACENTLANDSCAPINGOUTSIDE OFMIRACLE FIELDFENCE POST12" EVERTOP MIRACLELEAGUE SURFACE WITHBULLNOSE EDGE ATFENCE LINE5" DEPTH ASPHALT PAVING, 2LIFTS, 2" SURFACE, 3" BASECOMPACTED AGGREGATESUBGRADE022 PR-41 2"12" BEVEL AT EDGE OFASPHALT PAVINGTERMINATE SURFACING AT FENCELINE, BULLNOSED EDGEADJACENT OUTFIELD FENCEMAINTAIN EXPOSED ASPHALTOUTSIDE OF FENCE LINE6"ADJACENT TURFOUTSIDE OF FIELD12" EVERTOP MIRACLE LEAGUE SURFACEWITH BULLNOSE EDGE AT FENCE LINECORE DRILL FENCE POSTS WITHOUTFOOTINGS THROUGH EVERTOPSURFACING AND ASPHALT BASE5" DEPTH ASPHALTBASEFENCE POSTS WITH FOOTINGS ARE TOBE INSTALLED PRIOR TO EVERTOPSURFACING AND ASPHALT BASE. TOPOF FOOTING IS TO BE BELOW ASPHALTBASENOTE:1. TRANSITION BETWEEN EVERTOPSURFACING AND ADJACENT TYPE 1 PCCPAVING IS TO BE A FLUSH BUTT JOINT TOENSURE PROPER DRAINAGE AND ADAACCESS.ADJACENT TYPE1 PCC PAVINGREF. DWG. SCALE: NOT TO SCALE SHEET 03 CONFLUENCE PROJECT NO: 17393-02 DATE: 10-14-2021 PR-04 TRIUMPH PARK WAUKEE, IOWA L508N.T.S3 PR-4SECTION: FIELD EDGE TO ADJACENT LANDSCAPING1N.T.S3 PR-4SECTION: FIELD EDGE TO ADJACENT PCC PAVING3N.T.S3 PR-4ENLARGEMENT: ASPHALT EDGE TO ADJACENT LANDSCAPING2 SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SBW 995.87BW 995.87995.47995.47994.97994.97994.97994.27994.27994.43994.27994.27995.20995.11995.77994.52994.29995.06995.17BW 995.25TW 996.79TW 996.79TW 996.76996.61995.43995.21996.44995.80996.34994.34995.24995.30996.61994.48RIM 991.38993.58993.38BW 995.25993994995995994993994996.54996.59996.59995.52994.04994.01994.26995.18992.43993.63994.92TS 999.00TS 999.00TS 999.00TS 998.00TS 998.00TS 997.00TS 997.00995.38TW 996.76995.38REF. DWG. SCALE: NOT TO SCALE SHEET 04 CONFLUENCE PROJECT NO: 17393-02 DATE: 10-14-2021 PR-04 TRIUMPH PARK WAUKEE, IOWA L202 1'=20' 4 PR-4 GRADING PLAN: MIRACLE FIELD1 L205PR4NOTE:1.ANY GRADING REVISIONS THAT HAVE OCCURED SHALL ONLY BEWITHIN THE MIRACLE FIELD. THE TOP OF WALL ELEVATION OFTHE BACKSTOP SHALL REMAIN THE SAME ELEVATION AS SHOWNPREVIOUSLY.2.FUTURE REVISIONS TO SURROUNDING PAVEMENT OUTSIDE OFTHE MIRACLE FIELD SHALL OCCUR IN A FUTURE ASI. Estimate ESTIMATE #1912 DATE 10/21/2021 A+M Builders 3171 99th St, Urbandale Iowa 50322 Ph 515-336-4691 info@ambuildersiowa.com www.ambuildersiowa.com How To Accept Estimate #1912 Total amount $4,900.00 To accept this quote, please call or email us using the details at the top of the page. Thank you for your business, have a great day! BILL TO Jeff Mertz Larson Construction 600 17th Street SE Independence, IA JOB ADDRESS Triumph Park Waukee IA DESCRIPTION batting cages concrete ITEM QTY UNIT PRICE AMOUNT Mow strip labor to add concrete 1' wide band 20 $50.00 $1,000.00 Dugout floors Dugout floors 2 $1,950.00 $3,900.00 SUBTOTAL $4,900.00 TAX $0.00 TOTAL $4,900.00 1 Jeff Mertz From:Justin Stevens <jstevens@bishopengr.com> Sent:Friday, October 22, 2021 7:26 AM To:Jeff Mertz Subject:RE: Waukee 2nd HS Miracle Field Changes for PR-4 Jeff – The price of $920 only included the changes to the actual sidewalk elevations around the edge of the field. If we are giving you grades for the field surface, it will cost an additional $920 for a total of $1,840.00 to restake the sidewalks and give you adequate grade hubs to lay the asphalt for the playing field. Let me know if you have any questions. Thanks. Justin K. Stevens, Survey Coordinator jstevens@bishopengr.com Office: (515)-276-0467 3501 104th Street Urbandale, IA 50322 www.bishopengr.com Upon Acceptance of this drawing or other data or any electronic media generated and provided by Bishop Engineering Company, Inc., the recipient covenants and agrees that all such drawings and data are instruments of service and belong to Bishop Engineering Company Inc. These files are transmitted without warranty as to their accuracy or suitability for the purpose to which the recipient intends to use them. The recipient agrees to waive all claims against Bishop Engineering Company Inc. resulting in any way from any unauthorized changes or reuses of the drawings of data. In addition, the recipient agrees, to the fullest extent permitted by law, to indemnify and hold Bishop Engineering Company Inc. harmless from any damage, liability or cost, including attorney’s fees and cost of defense, arising from any changes or reuse of files(s). The drawings shall not be used or copied for any other project. From: Jeff Mertz <jmertz@larsonconst.com> Sent: Thursday, October 21, 2021 4:29 PM To: Justin Stevens <jstevens@bishopengr.com> Subject: Re: Waukee 2nd HS Miracle Field Changes for PR-4 Justin just left you a voicemail forgot you had sent this. With this includes staking for the asphalt pavers I wanna make sure we got it covered. Jeff Mertz Project Manager Larson Construction Co., Inc. 1:16 pm Wednesday, October 20, 2021 Triumph Park Waukee, Ia City of Waukee Project: Location: Owner: Letting Date: Phone 515-266-3111 Fax 515-265-4565 5088 E. University Ave. Des Moines, Iowa 50327 20-0812NT-2 DESCRIPTION AMOUNTUNIT PRICEUNITQUANTITYITEM To:Contact:Larson Construction Co., Inc.Jeff Mertz Triumph ParkProject Name:Bid Number: Fax:Independence, IA 50644 Address:600 17th Street SE Phone:(319) 334-7061 Project Location:700 NW Douglas Pwky, Waukee Bid Date: Unit PriceUnitItem DescriptionItem #Estimated Quantity 1 2,104.00 SY $33.005" Asphalt Paving: Fine Grade Rock Sub Base And Place 2 Lifts 3" Base 2" Surface Total Bid Price:$69,432.00 Notes: •The grading is not included in this proposal. Finish sub-grade shall be the responsibility of the grading contractor with final elevations established. Proper compaction of the top 12 inches of suitable material shall be at 95% of the Standard Proctor Density. Our price includes finish blading prior to paving. Grimes Asphalt and Paving Corporation may proof roll to verify stability for paving. •Grimes Asphalt and Paving Corporation is not required to supply material or serivces during inclement weather. •This work requires a two lift construction procedure. Should clean-up be required between the two lifts due to general construction activities, Grimes Asphalt shall be paid extra for clean-up work, price to be agreed upon prior to performing the clean-up work. (Except minor brooming) •General contractor to provide/maintain necessary traffic control through completion of paving work. •This quotation does not include bonding expenses. If required, we will furnish same at an additional 1% of the bid amount. •To the fullest extent provided by law, Owner shall indemnify, defend and hold harmless Grimes Asphalt and Paving Corporation, it's officers, directors, employees, and agents from and against all claims, damages, losses, and expenses, including but not limited to attorneys fees and court costs resulting from or arising out of Owner or Owner Representative failure to provide accurate information of the existence and location of any non-public utilities or hazardous materials at the project site. •Final dollar amounts to be based on actual field measured units installed to complete work at the unit price (s) quoted •If additional contract documents are required this proposal shall be incorporated into the final contract. •Based on the unknown composition of the sub-base, and natural ground movement, it cannot be guaranteed that cracking will occur. •Owner will be responsible for site plans, appropriate permits, and all fees associated with the same as required by city, state, or federal regulations and statutes. Payment Terms: This proposal may be withdrawn by us if not accepted within 30 days. It is understood that progress payments shall be made as work progresses, final payment due upon completion. A service charge of 1-1/2% will be added if not paid within 30 days from date of invoice. This proposal voids all previous proposals. It is understood that Grimes Asphalt may require credit assurances from the customer and/or owner, including but not limited to bank letters of guarantee and/or payments deposited into escrow accounts before work commences or at anytime during the performance of work. ACCEPTED: The above prices, specifications and conditions are satisfactory and are hereby accepted. Buyer: Signature: Date of Acceptance: CONFIRMED: Grimes Asphalt and Paving Corporation Authorized Signature: Estimator:Kevin E Johnson (515) 423-9632 kjohnson@grimesasphalt.com 10/18/2021 1:29:55 PM Page 1 of 1