HomeMy WebLinkAbout2021-11-01-J01F_02 10-Inch Distribution Main, Meredith-NW 10th St_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: November 1, 2021 AGENDA ITEM:Consideration of approval of Change Order No. 1 to Meade, Inc for the Waukee 10-Inch Project Meredith/NW 10th Street Distribution Main increasing the contract amount by $11,169.90. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 is to add an estimated 265 feet of bore footage of the 10-inch PE gas main along 10th Street crossing Douglas Pkwy. There has also been one bore extended along 10th Street crossing the Shoeman property, adding an estimated 365 feet of bore footage of the 10-inch PE gas main. The total bore footage added from both changes is estimated to be 630 feet. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $11,169.90. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 1 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Tim Royer TR PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: J1F2 OLNEY, ILLINOIS 1927 Miller Drive Olney, IL 62450 (618) 392-5502 BELLEVILLE, IL 9 Executive Woods Ct. Belleville, IL 62226 (618) 277-1520 SHELBYVILLE, KY 1018 Mt. Vernon Dr. Shelbyville, KY 40065 (502) 513-5127 WICHITA, KS 9540 W. Harry St. Wichita, KS 67209 (316) 239-7313 PITTSBORO, IN 7421 N. Co Rd. 225 E. Pittsboro, IN 46167 (317) 892-7662 Utility Safety & Design, Inc. 28847 US HWY 136 Unionville, MO 63565 P (660) 947-3316 Fax (660) 552-4602 www.usdi.us October 26, 2021 Mr. Tim Royer, Assistant Dir. of Public Works City of Waukee 805 University Avenue Waukee, IA 50263 troyer@waukee.org RE: Waukee 10-inch Project Meredith/NW 10th St. - Change Order 1 Dear Mr. Royer, Please disregard the original letter dated 10/01/21 and use this one in its place. All other copies of the plans are considered void and this set should be used in its place. At the request of the City of Waukee, we have created a change order to add an estimated 265 feet of bore footage of the 10-inch PE gas main along 10th St. crossing Douglas Pkwy (approximately station 46+45 to station 50+45). There has also been one bore extended along 10 th St. crossing the Shoeman property (the bore pit moved from approximately 59+35 to station 63+00, to be combined with an existing bore pit), adding an estimated 365 feet of bore footage of the 10-inch PE gas main. The total bore footage added from both changes is estimated to be 630 feet. The tee, valve, stub, and cap, approximately located at station 103+75 has been moved to approximately station 53+10. The two 10-inch valves located approximately at stations 103+55 & 104+80 have been moved to approximately stations 103+25 and 100+70. The City will provide the materials. USDI has reviewed the attached Change Order dated October 26, 2021 and recommend it be approved. The total estimated additional cost for this work is $11,169.90 plus materials. Please feel free to contact me anytime if you have any questions or require additional information. Respectfully Submitted, Anthony Everette, P.E. Vice-President Engineering USDI Attach: As noted Anthony W. Everette Digitally signed by Anthony W. Everette Date: 2021.10.27 08:31:13-05'00'