HomeMy WebLinkAbout2021-12-06-J01G_01 10-Inch Gas Distribution, Meredith-NW 10th St_Change Order 3AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: December 6, 2021 AGENDA ITEM:Consideration of approval of Change Order No. 3 to Meade, Inc for the Waukee 10-Inch Project Meredith/NW 10th Street Distribution Main increasing the contract amount by $5,840.00. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 3 is to pothole the Lumen fiber in the City’s permanent easement along Alice’s Road. This includes Meade conducting16 potholes to spot the fiber to safely install the 10-inch gas main. Also updated the 6-inch Mueller fitting at Hickman Road to no longer be a bottom out due to material shortages & updated the tie in details accordingly. There shall be (a) 2-inch bypass(es) used when cutting in the full 6-inch medium density tee at 10th Street. Meade will coordinate with USDI when cutting in the tee to determine how many 2-inch bypasses are required during the time of cutting in. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $5,840.00. Lumen Fiber will be reimbursing the City the cost of this change order. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 3 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Tim Royer PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: J1G1 OLNEY, ILLINOIS 1927 Miller Drive Olney, IL 62450 (618) 392-5502 BELLEVILLE, IL 9 Executive Woods Ct. Belleville, IL 62226 (618) 277-1520 SHELBYVILLE, KY 1018 Mt. Vernon Dr. Shelbyville, KY 40065 (502) 513-5127 WICHITA, KS 9540 W. Harry St. Wichita, KS 67209 (316) 239-7313 PITTSBORO, IN 7421 N. Co Rd. 225 E. Pittsboro, IN 46167 (317) 892-7662 Utility Safety & Design, Inc. 28847 US HWY 136 Unionville, MO 63565 P (660) 947-3316 Fax (660) 552-4602 www.usdi.us November 16, 2021 Mr. Tim Royer, Assistant Dir. of Public Works City of Waukee 805 University Avenue Waukee, IA 50263 troyer@waukee.org RE: Waukee 10-inch Project Meredith/NW 10th St. - Change Order 3 Dear Mr. Royer, At the request of the City of Waukee, we have created a change order to pothole the Lumen fiber in the City of Waukee’s permanent easement along Alice’s Rd. This includes Meade conducting 16 potholes to spot the fiber to safely install the 10-inch gas main. We have also updated the 6-inch Mueller fitting at Hickman Rd. to no longer be a bottom out due to material shortages & updated the tie in details accordingly; see the attached sheets A4 & C1. There shall be (a) 2-inch bypass(es) used when cutting in the full 6-inch medium density tee at 10th St. Meade will coordinate with USDI when cutting in the tee to determine how many 2-inch bypasses are required during the time of cutting in. USDI has reviewed the attached Change Order dated November 16, 2021 and recommend it be approved. The total estimated additional cost for this work is $5,840.00 and the City will provide the materials. The City of Waukee has agreed to push the completion date to December 10 th, 2021. Please feel free to contact me anytime if you have any questions or require additional information. Respectfully Submitted, Anthony Everette, P.E. Vice-President Engineering USDI Attach: As noted Change Order 03 City of Waukee Department of Public Works 805 University Avenue Distribution __ Waukee, IA 50263 Owner-Finance __ 515-978-7920 Fax 515-987-3979 Owner- Public Works __ Engineer __ Contractor __ Contractor Meade Inc. 625 Willowbrook Center Parkway Waukee 10-Inch Project Meredith/NW 10th St. Willowbrook, IL 60527 708-588-2500 ph $1,024,210.00 3 11/16/2021 THE CONTRACT IS CHANGED AS FOLLOWS ITEM NO.ITEM CODE UNIT PRICE QUANTITY VALUE ADJUSTMENT ADJUSTMENT 7 NEW ITEM $365.00 16 $5,840.00 $5,840.00 $1,024,210.00 $28,012.90 $1,052,222.90 $5,840.00 $1,058,062.90 8 Days Prepared By Recommended By Checked By USDI MEADE Inc.City of Waukee Owner City of Waukee Date Date Date Date Project Title Waukee Project File Number Original Contract Amount Change Order Number Date DESCRIPTION $/Pothole the Lumen Fiber conflict along Alice's Rd Signature Signature Signature Name: Anthony Everette Name: Name Title: Title Date: 11-16-2021 Date: Date The Contract Time will be Changed by __ > $500.00 Department of Director $501.00 to $2500.00 City Administrator x__________________________________________ x__________________________________________ $2501 City Council Approved or Ratified at Meeting on __ < __ __ Title: Engineer The Original Contract Sum Was Net Change by Previously Authorized Change Orders The Contract Sum Prior to the Change Order was The Contract Sum will be Increased by this Change Order in the Amount of The new Contract Sum Including this Change Order will be 4" Steel4" PolyExisting Pipe4" Steel 4" PolyExisting 4" SteelExisting 4" Steel Section RemovedExisting 4" Steel to be Abandoned & Filledwith Flowable FillExisting 6" Steel Section RemovedExisting 6" SteelExisting 6" Steel to be Abandoned& Filled with Flowable Fill6" Steel 6" PolyMueller H-172756" Sched. 40 90° Elbow,ASME SA234, WPB6" Steel6" PolyMueller H-172756" Sched. 40 90° Elbow,ASME SA234, WPBWaukee 10-Inch ProjectMeredith/NW 10th St.Waukee, IADATEDRWNUTILITY SAFETY & DESIGN, INC.28847 US HIGHWAY 136UNIONVILLE, MO 63565PHONE: 660-947-3316www.usdi.usREVREVISION DESCRIPTIONDesigned By:Drawn By:APP'DA. EveretteM. WigginsE:\E Documents\Waukee\Waukee Meredith & 10th 10in Project\10in Expansion_Meredith & 10th_12.1.20\Note Sheets CO3 11.19.21.dwg0307/06/21MGWAWEISSUED FOR BID0409/02/21MGWAWEISSUED FOR ROW PERMITTING0509/09/21MGWAWEISSUED FOR CONSTRUCTION0610/26/21MGWAWECHANGE ORDER 10711/02/21MGWAWECHANGE ORDER 20811/19/21MGWAWECHANGE ORDER 3NOTESA414" Tie in Detail View 1Scale: 1-1/2"= 1'-0"24" Tie in Detail View 2Scale: 1-1/2"= 1'-0"36" Tie in Detail View 1Scale: 1" = 1'-0"46" Tie in Detail View 2Scale: 1-1/2"= 1'-0"7175857175854851495366514648495366FlowTracer WireExisting GroundTest Station(Sheet A7)AnodeCAD Weld Wire toExisting PipePay Item #5Pay Item #5Pay Item #6Pay Item #661618282Note: Label all wires in test head03 TELEF/OSTF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE 0+001+000+50Waukee 10-Inch ProjectMeredith/NW 10th St.Waukee, IADATEDRWNUTILITY SAFETY & DESIGN, INC.28847 US HIGHWAY 136UNIONVILLE, MO 63565PHONE: 660-947-3316www.usdi.usREVREVISION DESCRIPTIONDesigned By:Drawn By:APP'DA. EveretteM. WigginsE:\E Documents\Waukee\Waukee Meredith & 10th 10in Project\10in Expansion_Meredith & 10th_12.1.20\_Main Final\Final Draft\P&P Sheets CO3 11.19.21.dwg87654321ABCDEFGH30307/06/21MGWAWEISSUED FOR BID0409/02/21MGWAWEISSUED FOR ROW PERMITTING0509/09/21MGWAWEISSUED FOR CONSTRUCTION0610/26/21MGWAWECHANGE ORDER 10711/02/21MGWAWECHANGE ORDER 20811/19/21MGWAWECHANGE ORDER 3PLAN & PROFILEC10010'20'6" MDPE (20psig) Tie InApproximate StationLocationNorthern Natural Pipeline10"-6" HDPE Reducer6" Stopple FittingMueller H-172756" HDPE Valve10"-6" HDPE Reducer4"-3" HDPE Reducer3" HDPE Transition4" MDPE Transition6"-4" MDPEReducer10" HDPE Tee6" MDPE6" MDPEElbow6" MDPE Valve6" MDPE Tee6"-4" HDPE Reducer4" HDPE Valve4" HDPE10" HDPE Elbow10" HDPE Elbow6" Steel Elbow6" HDPE Transition71758586868566534536506769766883624010" HDPE8210" HDPE82Existing 6" Steel Pipeto be abandonedExisting 6" MDPESee 6" Tie in DetailPay Item #6Complete Tie Into6-Inch SteelPay Item #7Complete Station &Tie Into 6-Inch MDPE03