MEETING DATE: December 6, 2021
AGENDA ITEM:Consideration of approval of Change Order No. 3 to Meade, Inc for the
Waukee 10-Inch Project Meredith/NW 10th Street Distribution Main
increasing the contract amount by $5,840.00.
FORMAT:Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Change Order No. 3 is to pothole the Lumen fiber in
the City’s permanent easement along Alice’s Road. This includes Meade conducting16 potholes
to spot the fiber to safely install the 10-inch gas main. Also updated the 6-inch Mueller fitting at
Hickman Road to no longer be a bottom out due to material shortages & updated the tie in details
accordingly. There shall be (a) 2-inch bypass(es) used when cutting in the full 6-inch medium
density tee at 10th Street. Meade will coordinate with USDI when cutting in the tee to determine
how many 2-inch bypasses are required during the time of cutting in.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this
Change Order increases the contract price in the amount of $5,840.00. Lumen Fiber will be
reimbursing the City the cost of this change order.
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve the change order.
ATTACHMENTS: I. Change Order No. 3
II. Letter of Recommendation
PREPARED BY:Beth Richardson
REVIEWED BY:Tim Royer
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
J1G1
OLNEY, ILLINOIS
1927 Miller Drive
Olney, IL 62450
(618) 392-5502
BELLEVILLE, IL
9 Executive Woods Ct.
Belleville, IL 62226
(618) 277-1520
SHELBYVILLE, KY
1018 Mt. Vernon Dr.
Shelbyville, KY 40065
(502) 513-5127
WICHITA, KS
9540 W. Harry St.
Wichita, KS 67209
(316) 239-7313
PITTSBORO, IN
7421 N. Co Rd. 225 E.
Pittsboro, IN 46167
(317) 892-7662
Utility Safety & Design, Inc.
28847 US HWY 136
Unionville, MO 63565
P (660) 947-3316 Fax (660) 552-4602
www.usdi.us
November 16, 2021
Mr. Tim Royer, Assistant Dir. of Public Works
City of Waukee
805 University Avenue
Waukee, IA 50263
troyer@waukee.org
RE: Waukee 10-inch Project Meredith/NW 10th St. - Change Order 3
Dear Mr. Royer,
At the request of the City of Waukee, we have created a change order to pothole the Lumen fiber in the
City of Waukee’s permanent easement along Alice’s Rd. This includes Meade conducting 16 potholes to
spot the fiber to safely install the 10-inch gas main. We have also updated the 6-inch Mueller fitting at
Hickman Rd. to no longer be a bottom out due to material shortages & updated the tie in details
accordingly; see the attached sheets A4 & C1. There shall be (a) 2-inch bypass(es) used when cutting in
the full 6-inch medium density tee at 10th St. Meade will coordinate with USDI when cutting in the tee to
determine how many 2-inch bypasses are required during the time of cutting in.
USDI has reviewed the attached Change Order dated November 16, 2021 and recommend it be
approved. The total estimated additional cost for this work is $5,840.00 and the City will provide the
materials. The City of Waukee has agreed to push the completion date to December 10 th, 2021.
Please feel free to contact me anytime if you have any questions or require additional information.
Respectfully Submitted,
Anthony Everette, P.E.
Vice-President Engineering
USDI
Attach: As noted
Change Order 03
City of Waukee Department of Public Works
805 University Avenue Distribution __
Waukee, IA 50263 Owner-Finance __
515-978-7920 Fax 515-987-3979 Owner- Public Works __
Engineer __
Contractor __
Contractor Meade Inc.
625 Willowbrook Center Parkway
Waukee 10-Inch Project
Meredith/NW 10th St.
Willowbrook, IL 60527
708-588-2500 ph
$1,024,210.00
3
11/16/2021
THE CONTRACT IS CHANGED AS FOLLOWS
ITEM NO.ITEM CODE UNIT PRICE QUANTITY VALUE ADJUSTMENT
ADJUSTMENT
7 NEW ITEM $365.00 16 $5,840.00
$5,840.00
$1,024,210.00
$28,012.90
$1,052,222.90
$5,840.00
$1,058,062.90
8 Days
Prepared By Recommended By Checked By
USDI MEADE Inc.City of Waukee
Owner City of Waukee
Date
Date
Date
Date
Project Title
Waukee Project File Number
Original Contract Amount
Change Order Number
Date
DESCRIPTION
$/Pothole the Lumen Fiber conflict along Alice's Rd
Signature Signature Signature
Name: Anthony Everette Name: Name
Title: Title
Date: 11-16-2021 Date: Date
The Contract Time will be Changed by
__ >
$500.00 Department of Director
$501.00 to $2500.00 City Administrator
x__________________________________________
x__________________________________________
$2501 City Council Approved or Ratified at Meeting on
__ <
__
__
Title: Engineer
The Original Contract Sum Was
Net Change by Previously Authorized Change Orders
The Contract Sum Prior to the Change Order was
The Contract Sum will be Increased by this Change Order in the Amount of
The new Contract Sum Including this Change Order will be
4" Steel4" PolyExisting Pipe4" Steel 4" PolyExisting 4" SteelExisting 4" Steel Section RemovedExisting 4" Steel to be Abandoned & Filledwith Flowable FillExisting 6" Steel Section RemovedExisting 6" SteelExisting 6" Steel to be Abandoned& Filled with Flowable Fill6" Steel 6" PolyMueller H-172756" Sched. 40 90° Elbow,ASME SA234, WPB6" Steel6" PolyMueller H-172756" Sched. 40 90° Elbow,ASME SA234, WPBWaukee 10-Inch ProjectMeredith/NW 10th St.Waukee, IADATEDRWNUTILITY SAFETY & DESIGN, INC.28847 US HIGHWAY 136UNIONVILLE, MO 63565PHONE: 660-947-3316www.usdi.usREVREVISION DESCRIPTIONDesigned By:Drawn By:APP'DA. EveretteM. WigginsE:\E Documents\Waukee\Waukee Meredith & 10th 10in Project\10in Expansion_Meredith & 10th_12.1.20\Note Sheets CO3 11.19.21.dwg0307/06/21MGWAWEISSUED FOR BID0409/02/21MGWAWEISSUED FOR ROW PERMITTING0509/09/21MGWAWEISSUED FOR CONSTRUCTION0610/26/21MGWAWECHANGE ORDER 10711/02/21MGWAWECHANGE ORDER 20811/19/21MGWAWECHANGE ORDER 3NOTESA414" Tie in Detail View 1Scale: 1-1/2"= 1'-0"24" Tie in Detail View 2Scale: 1-1/2"= 1'-0"36" Tie in Detail View 1Scale: 1" = 1'-0"46" Tie in Detail View 2Scale: 1-1/2"= 1'-0"7175857175854851495366514648495366FlowTracer WireExisting GroundTest Station(Sheet A7)AnodeCAD Weld Wire toExisting PipePay Item #5Pay Item #5Pay Item #6Pay Item #661618282Note: Label all wires in test head03
TELEF/OSTF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OF/OOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
0+001+000+50Waukee 10-Inch ProjectMeredith/NW 10th St.Waukee, IADATEDRWNUTILITY SAFETY & DESIGN, INC.28847 US HIGHWAY 136UNIONVILLE, MO 63565PHONE: 660-947-3316www.usdi.usREVREVISION DESCRIPTIONDesigned By:Drawn By:APP'DA. EveretteM. WigginsE:\E Documents\Waukee\Waukee Meredith & 10th 10in Project\10in Expansion_Meredith & 10th_12.1.20\_Main Final\Final Draft\P&P Sheets CO3 11.19.21.dwg87654321ABCDEFGH30307/06/21MGWAWEISSUED FOR BID0409/02/21MGWAWEISSUED FOR ROW PERMITTING0509/09/21MGWAWEISSUED FOR CONSTRUCTION0610/26/21MGWAWECHANGE ORDER 10711/02/21MGWAWECHANGE ORDER 20811/19/21MGWAWECHANGE ORDER 3PLAN & PROFILEC10010'20'6" MDPE (20psig) Tie InApproximate StationLocationNorthern Natural Pipeline10"-6" HDPE Reducer6" Stopple FittingMueller H-172756" HDPE Valve10"-6" HDPE Reducer4"-3" HDPE Reducer3" HDPE Transition4" MDPE Transition6"-4" MDPEReducer10" HDPE Tee6" MDPE6" MDPEElbow6" MDPE Valve6" MDPE Tee6"-4" HDPE Reducer4" HDPE Valve4" HDPE10" HDPE Elbow10" HDPE Elbow6" Steel Elbow6" HDPE Transition71758586868566534536506769766883624010" HDPE8210" HDPE82Existing 6" Steel Pipeto be abandonedExisting 6" MDPESee 6" Tie in DetailPay Item #6Complete Tie Into6-Inch SteelPay Item #7Complete Station &Tie Into 6-Inch MDPE03