ORDINANCE NO. 2811
AN ORDINANCE TO AMEND CHAPTER 300, ZONING ORDINANCE, CITY
OF WAUKEE, IOWA BY CHANGING CERTAIN PROPERTY THEREIN TO
MODIFY PD-1 (PLANNED DEVELOPMENT OVERLAY DISTRICT), A
PARCEL KNOWN AS LOT 2 WILLIAMS POINTE PLAT 15.
BE IT ORDAINED by the Council of the City of Waukee:
Section 1. Section 301.4 of Chapter 301, Waukee Municipal Code, Zoning
Ordinance of the City, adopting the Official Zoning Map, is hereby amended by
modifying the PD-1 [Planned Development Overlay District] on property legally
described as follows:
LOT 2, WILLIAMS POINTE PLAT 15, AN OFFICIAL PLAT, ALL INCLUDED IN AND
FORMING A PART OF THE CITY OF WAUKEE, DALLAS COUNTY, IOWA.
SAID PROPERTY CONTAINS 1.03 ACRES MORE OR LESS.
Section 2. Planned Development Agreement. Attached hereto as Exhibit A is
the Planned Development Agreement which shall define the minimum standards
and requirements of the PD-1 [Planned Development Overlay District] pertaining
to the above legally described property.
Section 3. Repealer. All ordinances or parts of ordinances in conflict with the
provisions of this ordinance are hereby repealed.
Section 4. Severability Clause. If any section, provision or part of this
ordinance shall be adjudged invalid or unconstitutional, such adjudication shall not affect
Book 2016 Page 8392
1 of 14
the validity of the ordinance as a whole or any section, provision, or part thereof not
adjudged invalid or unconstitutional.
Section 5. Effective Date. This ordinance shall be in effect upon its final
passage, approval and publication as provided by law.
Passed by the Council this 16`t' day of May, 2016, and approved this 16`h day of May, 2016.
LAd-21
Vtjli-am F. Peard, Mayor
Attest:
wc&" IP/
Rebecca D. Schuett, City Clerk
Book 2016 Page 8392
2 of 14
EXHIBIT A
WILLIAMS POINTE PLAT 15
(Previously platted as Williams Pointe Plat 9)
PLANNED DEVELOPMENT
CITY OF WAUKEE
ORIGINALLY APPROVED BY WAUKEE CITY COUNCIL ON
AUGUST 1, 2005
AMENDED BY WAUKEE CITY COUNCIL ON OCTOBER 15, 2007
AMENDED BY WAUKEE CITY COUNCIL ON MAY 6, 2013
AMENDED BY WAUKEE CITY COUNCIL ON MAY 16, 2016
Book 2016 Page 8392
3 of 14
September 2005
Amended and Approved by Waukee City Council on May 6, 2013
Amended and Approved by Waukee City Council on May 16, 2016
WILLIAMS POINTE PLAT 15 (Previously platted as Williams Pointe Plat 9)
Waukee, Iowa
Planned Development District (PD)
Item 1 Location, Size, Legal Description
A. See Attached: Exhibit A — Vicinity Map
B. See Attached: Exhibit B — Property Legal Description
C. The property is bordered by Gilcrest/Jewett Lumber Company to
the west across Alice's Road, Williams Pointe
Condominiums/Windhall at Williams Pointe Apartments to the
east across SE Brick Drive, future commercial to the north and
future commercial to the south across University Avenue.
Item 2 Topography
A. See Attached: Exhibit C — Existing Topography and Features Map
Item 3 Location and Description of Major Site Features, including Tree
Masses, Drainage ways, Wetlands, Soils
A. See Attached: Exhibit C — Existing Topography and Features Map
B. The site generally drains from east to west and carries the drainage
from the existing Williams Pointe Condominiums/Windhall at
Williams Pointe Apartments to a 42" RCP that crosses under
Alice's Road. According to the Dallas County Soil Survey, the
type of soils in the area consist of Clarion loam, Nicollet loam,
Canisteo silty -clay loam and Storden Loam.
Item 4 Location of 100 Year Floodplains
A. Not Applicable
Item 5 Generalized Land Use Plan
A. See Attached: Exhibit D — Rezoning Map (Amended May 6, 2013)
Exhibit E — Preliminary Development Layout
(Amended May 6, 2013)
B. The proposed development plan shows an 8-lot development with
a private street system. Peoples Bank was constructed in 2005 and
sits on Lot 1 of Williams Pointe Plat 9. The remaining lots are
intended for a mixture of retail and office uses. Lot 2 of Williams
Book 2016 Page 8392
4 of 14
Point Plat 15 would allow for automobile service and repair use
which would otherwise not be allowed for in a C-1 A zoning
district (see Exhibit E and E 1). (Amended , 2016)
Item 6 Proposed Types and Densities of Development
A. See Attached: Exhibit F — Bulk Regulations (Amended May 6, 2013)
Item 7 General Location and Size of Building or Building Footprints
A. See Attached: Exhibit E — Preliminary Development Layout
Refer to Section 3 for Conceptual Elevation Views
Item 8 Site Master Plan, Including General Envelopes of Buildings, Parking,
Open Space, and Other Site Features
A. See Attached: Exhibit E — Preliminary Development Layout
B. Exhibit E shows the location of Peoples Bank on Lot 1 of Williams
Pointe Plat 9 and the approximate location of an office building
along Alice's Road. The remaining lots show an approximate
building pad location and parking for the lot. The uses and
development requirements will meet the zoning regulations set
forth by the PD Bulk Regulations.
Item 9 Description and Location of all Use Types Included in the Project,
including Maximum Floor Areas Devoted to Each Use
A. See Attached: Exhibit F — Bulk Regulations
Item 10
Location and Design of Vehicular, Bicycle, and Pedestrian Circulation
Systems, including Relationship to External Transportation System
and Location of Driveways or Access Points Adjacent to the Project
A. See Attached: Exhibit E — Preliminary Development Layout
B. This property contains four access points to the development.
There is a full access location onto Alice's Road across from
Gilcrest/Jewett Lumber, a full access location on University
Avenue and two full access locations onto SE Brick Drive.
C. The remainder of the development includes a private internal
access road system with 25' road widths and head -in parking off of
the drives. Ingress/Egress easements are shown on the preliminary
plat to provide adequate access for all the lots.
D. There will be sidewalks throughout the development to allow
pedestrian traffic accessibility to the site. A 10' P.C.C. trail has
been installed along University Avenue that connects into the
Waukee City trail system. A 4'fo%J P.C.C. sidewalk will also be
installed along Alice's Road and will be routed to the east of the
existing detention pond. Internal sidewalks will be generally
located on the north and west side of the private drives.
Book 2016 Page 8392
5 of 14
Item 11 Schematic Location and Development Standards for Open Space,
including Conceptual Landscape Plan
A. See Attached: Exhibit F — Bulk Regulations
Item 12 Building Design Standards, including Height, Materials, Sections, and
Other Information Required to Describe the Project
A. See Section 3: Architectural Character for the existing Peoples
Bank and the proposed office building.
B. All of the lots within the development shall meet the uses and
development requirements set forth by Exhibit F — Bulk
Regulations.
Item 13 Location of Existing and Proposed Utilities, Sanitary Sewer, Storm
Water Facilities, and Water, Gas and Electrical Distribution Systems
A. See Attached: Exhibit C — Existing Topography & Features Map
Item 14 Proposed Site Development Regulations, Including Maximum FAR or
Other Density Regulations, Building and Impervious Coverage,
Setbacks, Maximum Heights, and Other Design Standards Specific to
the Project
A. See Attached: Exhibit F — Bulk Regulations
Item 15 Proposed Signage
A. At the time of development, each site plan would propose specific
signage for their particular lot that would meet requirements set
forth in the Waukee Zoning Ordinance which outlines specific
requirements for the size, number and types of signs allowed for
each type of zoning.
Item 16 Proposed Public and Private Ownership Boundaries, including
Proposed Private Lots and Common Ownership Areas
A. See Attached: Exhibit D — Rezoning Map
Item 17 Preliminary Plat, If Applicable
A. Not Applicable
Book 2016 Page 8392
6 of 14
Item 18 Final Plat, If Applicable
A. Not Applicable
Item 19 Schedule Indicating Proposed Phasing and Scheduling of
Development
A. Phase I construction of Peoples Bank site plan was approved by
the Waukee City Council on July 18, 2005 and has been
constructed. Phase II construction would include the proposed
office building along SE Alice's Road and is proposed to be
constructed upon City Council approval of a site plan in the
summer of 2013.
Item 20 Deed Restrictions, Covenants, Agreements, Association Bylaws, and
Other Documents Controlling the Use of the Property, Type of
Construction or Development or Activities of Future Residents
Book 2016 Page 8392
7 of 14
EXHIBIT `A' — VICINITY
MAP
Book 2016 Page 8392
8 of 14
EXHIBIT `B'
LEGAL DESCRIPTION
LOTS 1 THROUGH 3 AND OUTLOT A OF WILLIAMS POINTE PLAT 9, AN
OFFICIAL PLAT, CITY OF WAUKEE, DALLAS COUNTY, IOWA; AND
A PART OF LOT 2, WILLIAMS POINTE PLAT 7, AN OFFICIAL PLAT IN THE
CITY OF WAUKEE, DALLAS COUNTY, IOWA AND MORE PARTICULARLY
DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTHWEST CORNER OF SAID LOT 2; THENCE NORTH
00018'53" EAST ALONG THE WEST LINE OF SAID LOT 2, A DISTANCE OF
120.63 FEET; THENCE SOUTH 89°41'07" EAST, 450.00 FEET; THENCE SOUTH
00°18'53" WEST, 121.10 FEET TO THE SOUTH LINE OF SAID LOT 2; THENCE
SOUTH 89037'31" EAST ALONG SAID SOUTH LINE, 450.00 FEET TO THE POINT
OF BEGINNING;
CONTAINING 12.93 ACRES MORE OR LESS.
Book 2016 Page 8392
9 of 14
EXHIBIT C: EXISTING TOPOGRAPHY AND FEATURES MAP
I WI
,
Z, • fl
I
lift
3 It
D
�11(111 Vim
a
A
Z �
WILLIAMS POINTE PLAT 15
PRELIMINARY PLAT . .. .:. ........... _ ..
Book 2016 Page 8392
10 of 14
EXHIBIT D: REZONING MAP
OMER
9 ACIA a'
c a stem
R;nlLwt
n ;rfl xwM
APPLICANT
WN rx La
Sa Yus x vm wt a
maW w<m r na3Iv o
. 4f
0
MINER"OR
'\ Y• 4 ao= wE wi 6
an ON 01
? MWOGD
Vie' +"� A•.' �1 , k seaym
I � lEG4DESCRIPTION
>�a p
a cros>atvrs
20NING o°8
ROLM
KIP W
I , I I i � piwmxnvmmrl r�8
� I A:-t faY11�1-0.tQaQ91W1181t¶1 � ° i
ja.Ysmmantaq ra Z; .
NOBOING' }� / A 9
- I
j 4JaH81tAlBiE � �p� ■p Y
I W a
I I a0
Y i
2
Z
I WN
N eYII
!t
!� ;
/ 1
sans+
af6 I[.l YWG NGOF 'w
PINY
09G1tY01
llGillr
RDDE
ROUE
�i
N®YOAG
auoa
amua
wtsrua
ra•wa
aamta
sl.
w
�
ms
IBIS A•
amtw
l,4! Iwa
amewa
a imA a
4•
lYa
u
w
RYiU qa
OatW
:7t4.lYla
fat�,lta
auto t0
SE
➢,1
tll•
at
AiPf;l
fpE Y
�taa
11. aaC
7••
A
v
lull
uAt1Y.6
patwA
m.uerY
x
ua
as
u
swela
•aEm
alunl7
mSA1AIA
ICU
a
=
Book 2016 Page 8392
11 of 14
EXHIBIT E: PRELIMINARY DEVELOPMENT LAYOUT
� __..--..___. _- fYmVl 9E BiE0(DIAE�B '•�
II I �� ♦�
yr a s {' a" 4 i°°; 5 w E Si°a 4
1e
i��
gill
sS -A o grp �c
[;
BiB9 a I'll A I 'x
VIM
�f?6 8� ark' � rt1p
N ACCESS SYSTEMS
0 aeaa lalsmj°�:ao ais�s+n°
CONCEPTUAL DEVELOPMENT PLAN
C��l OES(i1AWAXTK�E E`p1E11[ -...aiti "--"-�i-..
tECK
Book 2016 Page 8392
12 of 14
EXHIBIT E1: CONCEPTUAL LAYOUT OF LOT 2 WILLAIMS POINTE PLAT 15
r
O
I
JIFFY LURE
±3135 SF . CAPS
\J i
s zN 'ta oS3 �� bF "� Wpm 24 to i-N
ee�
Book 2016 Page 8392
13 of 14
Williams Pointe Plat 9
Planned Development
Exhibit `F'
Amended by Waukee City Council on May 6, 2013
BULK REGULATIONS
`C- l A' Neighborhood Commercial District Zoning Regulations and `C-4' Office Park
Commercial District shall apply except as listed below:
A. Front Yard: 30 feet perimeter boundary and 30 feet setback from the internal
property lines.
B. Side Yard: No minimum shall apply except when bordering an `R' District in
which case the side yard shall be 15 feet.
C. Rear Yard: 30 feet perimeter boundary and 30 feet from the internal property
lines.
D. Each lot will have a minimum 20% open space requirement.
E. Commercial Parking: Parking will meet current City of Waukee Ordinance
requirements for minimum parking based upon use.