Loading...
HomeMy WebLinkAbout2022-11-07 Resolution 2022-459_Accept Public Improvements, 10-Inch Distribution Main, Meredith Dr-NW 10th StRESOLUTION 2022-459 RESOLUTION ACCEPTING THE 10-INCH PROJECT MEREDITH/NW 10TH ST. - 2021 WHEREAS, on the 71h day of September, 2021, the Mayor and Clerk of the City of Waukee, Iowa, entered into a construction contract with Meade, Inc., of Willowbrook, IL, for the construction of certain public improvements generally described as the 10-inch Project Meredith/NW loth St. - 2021; and WHEREAS, the contractor has fully completed the construction of the public improvements in accordance with the terms and conditions of the contract and plans and specifications, as shown by the certificate of the Engineer filed with the Clerk on November 4, 2022: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1. That the report of the Engineer be and the same is hereby approved and adopted, and the public improvements are hereby approved and accepted as having been fully completed in accordance with the plans, specifications and form of contract and the total final construction cost thereof is hereby determined to be $1,058,062.90, as shown in the report of the Engineer. PASSED AND APPROVED this 71h day of November, 2022. ATTEST: City Clerk RESULTS OF VOTE: AYE Anna Bergman Pierce X R. Charles Bottenberg X Chris Crone X Larry R. Lyon X Ben Sinclair X Mayor NAY ABSENT ABSTAIN