HomeMy WebLinkAbout2023-12-18 Resolution 2023-543_Fee ScheduleTHE CITY OF WAUKEE, IOWA
RESOLUTION 2023-543
ADOPTING THE CITY OF WAUKEE FEE SCHEDULE FOR THOSE FEES TO GO
INTO EFFECT JANUARY 1, 2024
IN THE NAME AND BY THE A UTHORITY OF THE CITY OF WA UKEE, IOWA
WHEREAS, the City of Waukee, Iowa is a duly organized municipality within Dallas County;
AND,
WHEREAS, a Fee Schedule for services provided by the City of Waukee has been submitted to
the City Council for consideration and approval; AND,
WHEREAS, the 2024 Fee Schedule is attached hereto as Exhibit A.
NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in session this
18' day of December, 2023, that the City of Waukee 2024 Fee Schedule is hereby approved and
shall be in effect as of January 1, 2024, unless otherwise noted in the schedule.
Attest:
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE:
AYE
Anna Bergman Pierce
X
R. Charles Bottenberg
X
Chris Crone
X
Larry R. Lyon
X
Ben Sinclair
X
Courtney Clarke, Mayor
NAY ABSENT ABSTAIN
City of Waukee Fee Schedule 2024
as adopted by Waukee City Council on 12/18/2023 by Resolution #2023-543
t All fees in effect as of January 1, 2024 unless otherwise noted.
ADMINISTRATIVE SERVICES/FINANCE
Examination and Copying of Public Records*
0.25 per page (black & white)
Photocopies
$0.50 per page (color)
5.00 per CD (data files)
$5.00 per DVD (audio/video)
$10.00 per USB drive
Electronic media**
$10.00 per GIS layer file
Routinely prepared or bound reports
Actual cost(s) to produce
Hourly rate for clerical time needed for the
Actual cost(s) of employee time if time involved
reproduction of photocopies
exceeds thirty (30) minutes
Hourly rate for professional staff time needed to
Actual cost(s) of employee time if time involved
produce or review documents
exceeds thirty (30) minutes
* Reference policy adopted by Waukee City Council on 10/03/2022 by Resolution #2022-398
`* All open records requests that are responded to by electronic media shall be done so that the document(s) may
not be altered.
Block Party Permit
250.00, refundable after barricades are picked up by
Bond requirement Public Works
Peddler, Solicitor Permit (all fees per applicant)
Application fee
$5.00
$10.00 per one -day license
$50.00 per one -week license (7 contiguous days)
$150.00 per 30-day license
License fee
$300.00 per 90-day license
100.00 cash or money order, refundable 30 days
Bond requirement
after expiration of license
Display Fireworks Permit
License fee
$10.00
Deposit requirement
$200.00, refundable upon the clean up, by applicant,
of any debris and in the sole discretion of the City
* Display Fireworks as defined in Iowa Code section 727.2(1)(b)
Commercial Garbage Hauler Permit
License fee $10.00 per license
* Insurance requirements specified in Waukee Municipal Code §213.5
Page 1 of 23
City of Waukee Fee Schedule 2024
Collection Fees
NSF fee $30.00
Income Offset Program administration fee 1$7.00
Miscellaneous Fees
Rules, regulations, procedures and fees associated with a Retail Cigarette/Tobacco/Nicotine/Vapor Permit
are governed by Chapter 453A of the Code of Iowa.
Rules, regulations, procedures and fees associated with a Retail Alcohol License are governed by Chapter
123 of the Code of Iowa.
PARKS AND RECREATION
Sugar Creek Municipal Golf Course
Season Passes (valid through October 31) Plus 7% tax
Junior (Valid Sunday -Saturday, 17 years and under)
$375.00
Weekday Single (Valid Monday -Thursday & Friday
until noon)
$573.00
Single Adult (Valid Sunday -Saturday)
$743.00
Couples (Valid Sunday -Saturday, Proof of 2
persons living at the same residence)
$1,069.00
Family (Valid Sunday -Saturday, Proof of 3 or more
persons living at the same residence, One or two
parents or legal guardians and children 17 years &
younger)
1$1,294.00
Cart Fees Not Taxable
Season Pass Single Rider
$436.00
Season Pass Double Rider
$633.00
Daily Cart Fee (per seat)
9 holes: $12.00
18 holes: $16.00
Daily Rates Plus 7% tax
Weekday (Monday -Thursday & Friday until noon)
9 holes: $19.00
18 holes: $30.00
Weekend (Friday after noon -Sunday)
9 holes: $23.00
18 holes: $36.00
Junior (Age 17 and under, Monday -Thursday &
Friday until noon)
9 holes: $13.00
18 holes: $21.00
Senior (Age 55+, Monday -Thursday & Friday until
noon)
9 holes: $13.00
18 holes: $21.00
Range Balls Plus 7% tax
Small (30 balls) 1$7.00
Medium (60 balls) 1$9.00
Large (90 Balls) 1$11.00
Frequent Customer Punch Cards Plus 7% tax
Ten (10) large range buckets for the price of nine 1$99.00
Page 2 of 23
City of Waukee Fee Schedule 2024
Special Event Permits
Special Event Permit 1$75.00 (non-refundable) plus shelter rental fees
Shelter Rentals
Centennial Park:
Enclosed Shelter House
$70.00 per day
Open Air Shelter
1$40.00 per day
Fox Creek Park:
Monday -Thursday Full -day 8 a.m.-10:00 p.m. $150.00
Friday -Sunday Half Day (8:00 a.m.-3:00 p.m. OR
4:00 p.m.-10:00 p.m.)
$150.00
Friday -Sunday Full Day (8:00 a.m.-10:00 p.m.)
$300.00
Ridge Pointe Park Pavilion:
Monday -Thursday Full -day 8:30 a.m.-10:00 p.m. $110.00
Friday -Sunday Half Day (8:30 a.m.-3:00 p.m. OR
3:30 p.m.-10:00 p.m.
$110.00
Friday -Sunday Full Day (8:30 a.m.-10:00 p.m.)
$220.00
Windfield Park:
Open Air Shelter 1$40.00
per day
Reservations for year-round facilities can be made 180 days in advance of the desired reservation date. Reservations
for Friday through Sunday, as well as Monday through Thursday, can be made online.
Centennial Park Enclosed, Centennial Park Open and Windfield Park Open Shelters: These facilities are available to
be rented April 1 through October 31 beginning March 1 for weekday rentals. Reservations for weekends can be
made online 180 days in advance of the desired reservation date.
Weekday Rentals can be booked online from March 1 through November 30 for weekday reservation dates April 1
through October 31. Fox Creek and Ridge Pointe Pavilions, online weekday reservations are closed December 1
through February 29. In order to reserve a weekday between December 1 through February 29, call 515-978-0007 to
reserve.
Facility rental refunds may be issued for reservations only when cancelations are made 10 business days prior to the
date of the reservation. There will be a $10 cancelation fee for any rental facility refund. Cancelations made later than
10 business days prior to the date of the reservation will result in forfeiture of the rental payment.
Page 3 of 23
City of Waukee Fee Schedule 2024
Waukee Community Center Rentals
Half Day (9:00 a.m.-3:00 p.m. OR
4:00 p.m. -10:00 p.m.)
$150.00
Full Day (8:00 a.m. - 10:00 p.m.)
$300.00
Weekday Meeting Option
$30.00 per hour
AudioNisual Equipment
$50.00 per rental
Deposit (for non-profit groups)*
1$150.00
Non -Profit Groups: To be considered a non-profit group of Waukee, you must have a 501(c)(3) corporation duly
formed and existing pursuant to the State of Iowa which maintains its principal place of business in the City of
Waukee.
Non -Profit Group Usage: Non -Profit Groups will be allowed to reserve the community center for free, two dates each
month, Monday through Thursday for a maximum of two hours per use. Any usage outside the Monday through
Thursday timeline or the hourly maximum will be subject to the following rental rates listed above.
Reservations for this year-round facility can be made 180 days in advance of the desired reservation date. Online
reservations for Friday through Sunday are available. For Monday through Thursday rentals please call the Waukee
Parks & Recreation Department at 515-978-0007.
Trailside Dog Park Fees
Annual pass (resident)
$25.00 per dog
Annual pass (non-resident)
$45.00 per dog
Daily pass
$5.00
Centennial Park and Warrior Park Ball Field
Membership
Centennial & Warrior Park practice time, weather permitting, can reserve space online starting in mid -
March through Oct. 31. Teams are allowed one hour of practice time per week (M-F). Weekend time slots
will be open for one additional hour. Available fields include: Centennial Park Fields 1-3 and Warrior Park
Fields 4-7. Reservations will only be accepted online at www.Waukee.org/reservations, starting at 10 a.m.
on the online reservation date listed. Field users must complete the team form one time per year prior to
making reservations. The reservation system will be split into two seasons, first season will run from March
11 — July 14, and second season will run from July 22 — October 31. The cost will be $100/season + tax
which can be paid online.
Page 4 of 23
City of Waukee Fee Schedule 2024
Centennial Park Baseball/Softball Field Rentals
No field preparation
$25.00 per field per hour
One field, including one dragging of field
$125.00 per day
Two fields, including one dragging of fields
$250.00 per field per day
Three fields, including one dragging of fields
$375.00 per field per day
Field Lights
$35.00 per field per day
Field Chalked
$15.00 per field chalked
Field Drag
$15.00 per field dragged
Cancellations require notice of 10 business days. Refunds will be issued by check or will be credited back onto the
credit card used to reserve the facility. A $5.00 nonrefundable handling fee will be deducted from the refund. If ball
field reservations are cancelled in the event of rain, all attempts will be made to reschedule.
Triumph Park Rates & Fees
Practice Time
Practice Quad Field w/Batting Cage
(60 min slot) 4, 5, 6, & 7 p.m.
$20.00 + tax/practice per field
Ball Field w/ Batting Cage
(75 min slot) 4, 5:15, 6:30, & 7:45 p.m.
$30.00 + tax/practice per field
Practice time will be reserved online. Fields will not be chalked for practices. Practice quads have home plates, but
no bases.
League Games (M-F)
Baseball
$50.00/game per field
Softball
$40.00/game per field
Complex Amenity Fee
$10/day per field
Fields will be prepped, chalked and setup before the first game of the night on each field. Baseball portable mounds
will be placed by Triumph Park staff.
Tournaments
Baseball
$60.00/game per field
Softball
1$100.
$50.00/game per field
Complex Amenity Fee
$25.00/day per field
Vendor Fee
00/day per vendor
Baseball fee includes portable mounds provided by the City along with fields prepped and chalked at the beginning of
the day. Dragging and chalking of the fields during the tournament will be at the discretion of the grounds crew.
Softball fee includes fields prepped and chalked at the beginning of the day along with the pitcher's rubber set.
Dragging and chalking of the fields during the tournament will be at the discretion of the grounds crew. Practice
quads and batting cages are included with tournament field rentals. Complex amenity fee includes stocking and
cleaning of restrooms along with trash service throughout Triumph Park. Vendor location and space will be
determined by Triumph Park staff.
Page 5 of 23
City of Waukee Fee Schedule 2024
Additional Fees
Ball Field Lights
$15.00/game per field
Extra Field Prep (dragged & chalked)
$25.00/game
Bag of Field Dry
$20.00/bag
COMMUNITY DEVELOPMENT
Administrative Fees
Zoning Change Requests
$300.00
Certificate of Occupancy/Zoning Compliance Letter
$150.00
Preliminary Plat
$250.00
Final Plat
$250.00
Boundary Retracement Survey
$40.00
Plat of Survey
$150.00
Site Plan
$250.00
Construction Plans
$500.00 (an additional $140.00 will be charged for
each additional submittal following two full reviews by
staff)
Board of Adjustment - residential
$100.00
Board of Adjustment - all others
$150.00
Board of Appeals - residential
$100.00
Board of Appeals - all others
$150.00
Construction Inspection
$75.00 per hour
Development Review - Consulting Engineer
All cost incurred will be billed to the applicant
Development Review - Legal
All cost incurred will be billed to the applicant
Development Recording Fees
lAll cost incurred will be billed to the applicant
Page 6 of 23
City of Waukee Fee Schedule 2024
Building Fees
Building Permit fees with the exception of the job types specified below shall be calculated based upon the
following valuation criteria:
Total Valuation
Fee
$1.00 to $500
$15.00
$501 to $2,000
$15.00 for the first $500 plus $2.00 for each
additional $100 or fraction thereof, to and including
$2,000
$2,001 to $25,000
45.00 for the first $2,000 plus $8.00 for each
additional $1,000 or fraction thereof, to and including
$25,000
$25,001 to $50,000
229.00 for the first $25,000 plus $7.00 for each
additional $1,000 or fraction thereof, to and including
$50,000
$50,001 to $100,000
$404.00 for the first $50,000 plus $5.00 for each
additional $1,000 or fraction thereof, to and including
$100,000
$100,001 to $1,000,000
654.00 for the first $100,000 plus $3.00 for each
additional $1,000 or fraction thereof, to and including
$1,000,000
$1,000,001 and up
or the tirstpus $2.bU tor each
additional $1,000 or fraction thereof
Accessory Buildings (201 to 600 square feet)
$50.00
Accessory Buildings (over 600 square feet)
$90.00
Accessory Structures (except decks)
$20.00
Accessory Structures (decks)
$80.00
New mobile home set-up
$300.00
Swimming Pools (including fence, electrical and
plumbing)
$150.00
Swimming Pools Above -Ground (including fence,
electrical and pluming)
$50.00
Temporary Structures (including tents, canopies,
membrane structures and similar structures)
$75.00
Minor Structural Repair or Alteration
$75.00
Temporary Uses
$75.00
Agricultural Sales
$50.00
Building Signs
$50.00
Monument Signs
$85.00
Sign Remodel
$20.00
Temporary Signs
$20.00
Inclusive Trade Permit (new construction)
$225.00
Mechanical Permit
$75.00
Electrical Permit
$75.00
Plumbing Permit
$75.00
Demolition Permit
$50.00 - minor
$100.00 - major (bldg/utility removal)
Energy Code Inspection
$350.00 per unit
Energy Code Review/Inspection
$500.00 per unit
Building Permit Re-Issuance/Transfer Fee
$100.00
Inspections outside of normal business
$75.00 per hour
Page 7 of 23
City of Waukee Fee Schedule 2024
Residential Rental Inspections
Multi -family Development
$65.00 per structure plus
$15.00 per dwelling unit
Condominiums (individual owner)
$65.00 per dwelling unit
Condominiums (single building owner)
$65.00 per structure plus
$15.00 per dwelling unit
Duplex
65.00 per structure plus
$15.00 per dwelling unit
Single Family Home
$65.00 per dwelling unit
Townhouse (individual owner)
$65.00 per dwelling unit
Townhouse (single building owner)
per s ruc ure plus
$15.00 per dwelling unit
Failure to Register (initial or renewal)
$150.00
Re -inspection (first re -inspection free)
$50.00 per hour (1 hour minimum)
Complaint Inspection
$150.00 (includes first re -inspection)
Board of Appeals Application
$100.00
Code Compliance
Mowing Non -Compliant Properties $90.00 per hour (one hour minimum)
Shoveling Non -Compliant Sidewalks 1$90.00 per hour (one hour minimum)
Non -Building Permit and License Fees
Mobile Food Vendor Permit 1$50.00 annual
Urban Chicken License 1$25.00 annual
Miscellaneous
Zoning Ordinance
$25.00
Zoning Maps/Street Maps
$5.00
Comprehensive Plan/Master Plans
$25.00
Any document/map above supplied on CD/flash
drive
$5.00
FIRE DEPARTMENT/EMS
Ambulance Service
BLS transports
$700.00
ALS transports
$850.00
ALS "2" transports
$1,180.00
Mileage
$15.00 per loaded mile
Treat no transport BLS
1$150.00
Treat no transport ALS
1$500.00
Page 8 of 23
City of Waukee Fee Schedule 2024
Hazardous Materials Response*
Heavy Response Apparatus with 4 personnel
(engine, ladder, heavy rescue, grader, backhoe,
dump truck, endloader, sweeper, sewer jet, etc.)
$331.61 per hour
Light Response Apparatus with 2 personnel (tanker,
brush truck, ambulance, staff car, pick-up truck,
generator, compressor, related power equipment,
etc.)
$264.28 per hour
Extra response personnel (per person)
$25.56 per hour
Expended materials (foam, containment booms,
sand, absorbent, etc.)
Replacement cost, including shipping
Equipment repair and/or cleaning (personal
protective equipment, hose, nozzles, apparatus,
etc.)
Cost (parts plus labor), including shipping
Damaged equipment and/or property (may include
injury to, destruction of, or loss of natural resources,
etc.)
Replacement and/or repair cost, including shipping
Other (contracted services, contracted equipment,
evacuation of people, etc.)
Billed as used
* Minimum of one (1) hour, and billed in 15 minute increments beyond the first hour.
Inspections*
Initial inspection
no charge
First reinspection (performed within 30 days of initial
inspection)
no charge
Second reinspection (performed within 2 weeks of
first reinspection)
$100.00
Third reinspection (performed within 2 weeks of
second reinspection)
$300.00
Fourth reinspection (performed within 2 weeks of
third reinspection)
$600.00
Fifth reinspection and each reinspection thereafter
(performed within 2 weeks of fourth and subsequent
reinspections)
$1,000.00 per reinspection
* Occupancy permit reinspections to be scheduled with an agreed upon date. A written work order secured by the
occupant and/or building owner and presented to the inspector with an agreed upon completion date to correct Fire
Code violations will serve in place of the next reinspection fee. If the work order is not complted by the agreed upon
date, the corresponding reinspection fee will be charged and another reinspection scheduled.
Re -inspection Policy*
Hourly (minimum charge one hour) J$75.00
* This policy applies when a complaint, acceptance testing, or field inspection fails initial inspection. The re -
inspection fee will be billed to the entity that requested the inspection or test that failed or responsible for
the complaint. The number of inspectors and time required for the re -inspection is dependent upon the
scope of the re-test/re-inspection and the manpower required to complete inspection.
Page 9 of 23
City of Waukee Fee Schedule 2024
Plan Review/Permit Fees
0-6,000 square feet
$100.00
6,001 - 12,000 sq ft
$200.00
12,001 - 24,000 sq ft
$300.00
24,001 - 50,000 sq ft
$400.00
50,001-100,000 sq ft
$500.00
100,001 - 500,000 sq ft
$1,000.00
500,001-1,000,000 sq ft
$1,500.00
1,000,001 sq ft and above
$1,500.00 + $100,00 for every 6,000 sq ft
Excessive Nuisance Alarms"
First two false alarms
no charge
Third false alarm
$75.00
Fourth false alarm
$100.00
Fifth false alarm
$150.00
"Alarm system actuates excessive false alarms constitutes a public nuisance; these include intentional
misuse, error/malfunction, or unintentional activation.
The maximum permissible number of false alarms is two (2) per calendar year. New alarm installations
would be granted a thirty (30) day break-in and adjustment period
CPR and First Aid Question
Healthcare Provider Courses
Classroom and Skills' $100.00/person
Skills Testing (online classes) $60.00/person
Heartsaver Courses
Classroom and Skills - CPR/AED only"
$85.00/person
Classroom and Skills - CPR/AED and First Aid"
$140.00/person
Classroom and Skills - First Aid only'
$70.00/person
Skills Testing - CPR (online classes)
$60.00/person
Skills Testing - CPR and First Aid (online classes)
$60.00/person
Skills Testing - First Aid only (online classes)
$60.00/person
Family and Friends Class $35.00/person
Stop the Bleed" $25.00/class
Instructor travel (if class is outside Waukee) $50.00/hour
*All classroom courses require a minimum of four (4) participants.
Cancellation Policy - No refunds if a participant does not show up on course date.
Page 10 of 23
City of Waukee Fee Schedule 2024
Miscellaneous
Operation Permit Fee Non -Compliance
$50.00
Inspections outside of normal business
$75.00 per hour
Event Stand By (FF/Paramedic)
$50.00 per hour
Event Stand By (FF/EMT)
$40,00 per hour
Use of acceptance equipment
1$40.00
POLICE DEPARTMENT ,
Administration
Off -duty police officer $65.00 per hour with 2-hour minimum
Fingerprinting services 1$10.00 per card + $5.00 single charge supply fee
Pet Licensing and Animal Control
Spayed or neutered dog or cat
$15.00 per license
Non -spayed or neutered dog or cat
$25.00 per license
Replacement tag
$5.00 per license
A copy of recent rabies vaccination is required for a pet license to be issued. Licenses are valid from January 1
through December 31 and must be renewed annually.
UTILITY BILLING J,96 I� '1 m '` 11� ,
Gas service deposit
$50.00
Water service deposit
$50.00
Gas service deposit (renters)
$100.00
Water service deposit (renters)
$100.00
Gas service deposit (mobile home court resident)
$100.00
Gas reconnection fee
$55.00
Water reconnection fee
$30.00
Snowbird"' gas reconnection fee
$25.00
Snowbird" water reconnection fee
$12.50
Portable irrigation meter
$150.00
Shut off notice/tag fee
$25.00
Late fees
1 '/z %
'Snowbird is defined as a resident with their primary residence in Waukee who leaves that residence vacant for a
minimum of three consecutive months and informs Utility Billing in advance of the vacancy. Snowbirds who are
regular garbage customers can suspend service during the vacancy period; however, they are required to continue
paying the $3.00/month solid waste landfill fee.
Page 11 of 23
City of Waukee Fee Schedule 2024
PUBLIC WORKS DEPARTMENT
Equipment Rates Per Hour*
Dump truck
$80.00
Sewer Jet/Vac Truck
$222.00
Jet/Vac Trailer
$180.00
Camera Van
$180.00
Street sweeper
$115.00
Wheel loader
$126.00
Backhoe
$81.00
Excavator
$65.00
Motor grader
$158.00
Skid loader
$41.00
Bucket truck
$77.00
Variable message board
$36.00
Pickup (3/4 ton)
$38.00
Trencher (walk behind)
$31.05
Trencher (wheel)
$98.33
Boring/Missile
$20.70
Gas construction/service truck
1$38.00
Mini Excavator
1$52.00
"One hour minimum charge. Additional equipment fees may be charged based on Iowa Department of
Transportation.
Labor Fees (includes Park & Rec Labor fees)
Labor Operations/Specialist
52.43 per hour regular rate (1 hour minimum);
$78.65 per hour overtime rate (1 hour minimum)
Administrative
$51.69 per hour (1 hour minimum)
Overtime rate
$77.54 per hour
After -hour call in
$84.85 per hour (1 hour minimum)
Holiday after hour call -in"
$141.42 per hour (1 hour minimum)
Department Supervisors
56.57 per hour regular rate;
$84.85 per hour overtime rate*
Assistant Public Works Director
$80.55 overtime N/A
Department Director
1$92.70 overtime N/A
"Holidays as designated in the City of Waukee Employee Handbook
Custom Mailbox Reimbursement
Pursuant to City of Waukee Snow & Ice Removal
Policy 1$150.00
Page 12 of 23
City of Waukee Fee Schedule 2024
Hydrant Meter Deposit
3/4" meter
$900 + $35.00 monthly availibility charge
1" meter
$1,000 + $50.00 monthly availibility charge
2" meter
$2,200 + $120.00 monthly availibility charge
3" meter
$3,717 + $150.00 monthly availibility charge
Non-refundable administrative fee
1$125.00
Meter Accuracy Test
Test 1$100.00
Water Meters and Appurtenances Fee*
3/4" Domestic meter
$524.00
1" Irrigation meter
$360.00
1" Domestic meter
$664.00
1 1/2" Irrigation turbo meter with flange kit
$1,865.00
1-1/2" Domestic compound meter w/ flange kit
$2,580.00
2" Irrigation turbo meter with strainer w/ flange kit
$2,185.00
2" Domestic compound meter w/ flange kit
$2,892.00
3" Irrigation turbo meter w/ flange kit
$2,491.00
3" Domestic compound meter w/ flange kit
$2,968.00
4" Irrigation turbo meter w/ flange kit
$4,523.00
4" Domestic compound meter w/ flange kit
$5,688.00
6" Irrigation turbon meter w/ flange kit
$8,655.00
6" Domestic compound meter w/ flange kit
1$10,039.00
Breaking seal/tampering w/meter
J$250.00
"Water meters will be billed at meter cost plus labor.
*Water meter equipment pricing subject to change without notice.
Samples and Flushing*
Bacteriological Sample 1$150.00
Water used for flushing J$8.62 per 1,000
*New mains that fail initial bacteriological test may be assessed sampling and flushing costs
Oversize/Overweight Permits
Single Trip
$0.00
Round Trip
$0.00
Annual Oversize
$0.00
Page 13 of 23
City of Waukee Fee Schedule 2024
Signage*
8" Street Blades:
24" Length
$66.00
30" Length
$75.00
36" Length
$95.00
42" Length
$99.00
54" Length
$136.00
72" Length
$157.00
Stop sign, 30 X 30 R1-1 and hardware
$138.00
Stop sign, 30 X 30 R1-1 with post and street
blades/hardware
$110.00 plus street blade cost
No Parking with telespar post
$103.00
No Parking banded on light post
$64.00
25 MPH banded to light pole
$70.00
25 MPH on telspar post
$104.00
Street Blade with telespar post
$70.00
Nine -dot delineators with post and hardware
$54.00
Telespare Post/Hardware
$84.00
No outlet on post
1$142.00
No outlet banded on light pole
1$87.00
"Street signs will be billed at sign cost plus labor
*All other signs billed at cost plus labor/installation
Gas Charges
Gas meter accuracy test:
Residential
1$105.00
Large Volume
1$240.00
Gas meter fees - commercial:
2" Flanged Meter Set
$3,914.00 plus meter cost
3" Flanged Meter Set
$4,000.00 plus meter cost
4" Flanged Meter Set
$4,866.00 plus meter cost
Multiple Meter Commercial Headers
$535.00 per meter
Construction cost of service line
ITime and Material + 15%
Small Volume Meter Set
1$382.24
Page 14 of 23
City of Waukee Fee Schedule 2024
Gas Main Installation Construction Costs
Trenched Gas Main (Per Linear Foot)
2" PLS (30" Min)
$6.20
4" PLS (30" Min)
$8.06
6" PLS (30" Min)
$14.45
8" PLS (30" Min)
$23.37
10" PLS (30" Min)
$35.86
2" Steel (30" Min)
$17.61
4" Steel (30" Min)
$22.02
6" Steel (30" Min)
$42.33
8" Steel (30" Min)
1$48.65
10" Steel (30" Min)
1$58.56
Directional Bored Gas Main (Per Linear Foot)
1/2" PLS
$17.01
1" PLS
$17.01
2" PLS
$17.01
4" PLS
$23.81
6" PLS
$42.53
8" PLS
$57.53
10" PLS
$92.40
1" Steel
$18.71
2" Steel
$18.71
4" Steel
$25.53
6" Steel
$44.24
8" Steel
$73.96
10" Steel
$106.28
Gas Services (Per Linear Foot)
1/2 PLS
$11.05
1" PLS
$11.05
2" PLS
$12.75
4" PLS
$26.30
6" PLS
$32.87
1" Steel
$17.01
2" Steel
$20.41
4" Steel
1$29.59
6" Steel
1$41.08
Page 15 of 23
City of Waukee Fee Schedule 2024
Gas Main Hot Tie In (Per Each)
1/2" PLS
$340.47
1" PLS
$203.48
2" PLS
$425.59
4" PLS
$766.06
6" PLS
$1,012.60
8" PLS
$1,725.82
1" Steel
$1,012.60
2" Steel
$1,335.46
4" Steel
$2,127.92
6" Steel
$2,127.92
8" Steel
$2,552.05
Steel Gas Main Work (Per Each)
1" Steel Service Retire
$924.27
2" Steel Service Retire
$924.27
4" Steel Service Retire
$1,315.19
6" Steel Service Retire
$1,972.79
Frost Charges (Per Linear Foot)
6" to 12" Trench
$3.11
13" to 18" Trench
$6.19
19" to 24" Trench
$8.62
Frost Charges (Each)
6" to 12" Bellhole
$78.90
12" to 18" Bellhole
$185.73
18" to 24" Bellhole
$295.85
Welding (Per Hour)
Welder Rate
$119.75
Welder Helper
$94.59
Welding Rig
$42.33
Labor Rates (Per Hour)
Supervisor
$145.75
Foreman
$123.01
Fuser
$98.15
Helper
$94.59
Laborer
$71.24
Operator
$98.05
Pipe Fitter
$119.75
Truck Driver
$98.05
Page 16 of 23
City of Waukee Fee Schedule 2024
Equipment Rates (Per Hour)
Pick Up 1/2 ton
$34.67
Pick Up 1 ton
$39.52
2 ton dump truck with tools
$50.80
Foreman truck with tools
$35.28
Fuser Truck with Tools
$35.28
Backhoe (Rubber Tire)
$56.44
Backhoe with Breaker
$63.50
Backhoe with Tamper
$63.50
Excavator
$108.66
Mini Excavator
$58.41
Sideboom Tractor
$91.72
Trencher Walk behind
$43.81
Trencher Wheel
$138.75
Boring Equipment 2" Missile
$29.21
Boring Equipment 3-4" Missile
$36.53
Bore Rig Small
$438.15
Skid Steer
$29.21
Pipe Trailer Stick
$14.60
Pipe Trailer Coil
$7.32
Vacuum Excavator
$65.73
Pipe Straightner
$14.60
Generator
$7.32
Water Pump
$14.60
Jumping Jack Tamper
$7.32
Air Compressor with Tools
1$21.92
Page 17 of 23
City of Waukee Fee Schedule 2024
Stopping Equipment (Per Each)
1" Steel Stop Low Pressure
$82.19
1" Steel Stop high Pressure
$0.00
2" Steel Stop Low Pressure
$123.27
2" Steel Stop high Pressure
$0.00
4" Steel Stop Low Pressure
$147.93
4" Steel Stop high Pressure
$0.00
6" Steel Stop low Pressure
$0.00
6" Steel Stop high Pressure
$0.00
8" Steel Stop low Pressure
$0.00
8" Steel Stop high Pressure
$0.00
10" Steel Stop low Pressure
$0.00
10" Steel Stop high Pressure
$0.00
2" Plastic Squeeze - off
$8.22
4" Plastic Squeeze - off
$12.34
6" Plastic Squeeze - off
$16.44
8" Plastic Squeeze - off
$66.03
10" Plastic Squeeze - off
1$0.00
1/2" - 1" Plastic Squeeze - off
1$8.22
By -Pass (Per Each)
1" PLS By -Pass
$616.50
2" PLS By -Pass
$753.49
4" PLS By -Pass
$986.40
6" PLS By -Pass
$1,315.19
1" Steel By -Pass
$1,096.00
2" Steel By -Pass
$1,753.60
4" Steel By -Pass
$2,630.38
6" Steel By -Pass
$0.00
8" Steel By -Pass
1$0.00
Miscellaneous (Per Linear Foot)
Bell hole adder over 6' deep
$0.00
Hand Dig
$42.53
Silt Fence
$14.45
Rock Shield
$17.01
Page 18 of 23
City of Waukee Fee Schedule 2024
Miscellaneous (Per Each)
Anode 1 LB Installed
$42.53
Anode 5 LB Installed
$51.04
Anode 17 LB Installed
$59.54
Test Station Installed
$255.17
Line Markers Installed
$127.59
1" PE Valve Installed
$141.11
2" PE Valve Installed
$211.66
4" PE Valve Installed
$450.81
6" PE Valve Installed
$601.12
1" Steel Valve Installed
$239.88
2" Steel Valve Installed
$515.05
4" Steel Valve Installed
$564.44
6" Steel Valve Installed
1$1,001.88
Miscellaneous (Per Square Foot)
Sod Removal & Replacement (Existing)
$5.12
Sod Replacement (New)
$5.96
Asphalt Removal & Replacement
$25.15
Concrete Removal & Replacement
$29.77
Spreading Stone
$76.55
Matting
$25.53
Seeding
$1.37
Miscellaneous (Per Vertical Foot)
Extra Depth Ditch
1$2.55
Page 19 of 23
City of Waukee Fee Schedule 2024
Gas Main Installation Material Costs
(Per Each) *
1" PE Ball Valve
$48.64
2" PE Ball Valve
$95.76
4" PE Ball Valve
$304.00
6" PE Ball Valve
$630.80
Line Markers
$24.65
Test Station
$59.35
Anode 1 LB
$26.02
Anode 5 LB
$71.75
Anode 17 LB
$190.15
Valve Box w/ Cast Iron Ring and Lid
$232.60
4" Butt Fusion Tee
$22.71
4" Butt Fusion 90 Deg Bend
$17.42
4" Butt Fusion Caps
$10.57
4" X 2" Butt Fusion Reducer
$10.43
2" Butt Fusion 90 Deg Bend
$5.58
2" Butt Fusion Tee
$6.99
2" Butt Fusion Caps
$3.50
4" X 2" HV Tap Tee
$118.75
6" Butt Fusion Tee
$51.94
6" Butt Fusion 90 Deg Bend
$43.84
6" Butt Fusion 45 Deg Bend
$43.84
6" X 4" Butt Fusion Reducer
$31.34
4" Butt Fusion 45 Deg Bend
$17.42
(Per Linear Foot)*
2" IPS Performance Pipe
$1.34
4" IPS Performance Pipe
$4.43
6" IPS Performance Pipe
$9.62
Rock Shield
$13.00
Tracer Wire and Warning Tape
1$0.25
* Freight will be included as a separate line item on the final invoice
Residential Gas Service Construction Costs
(Per Each)
Short Side Service $382.24
Long Side Service $382.24
Stormwater Fees
COSESC0 - Individual lot
$250.00/one time fee
COSESCO - All other GP#2
$250.00/one time fee
Page 20 of 23
City of Waukee Fee Schedule 2024
Schedule of Administrative Penalties:*
Industrial Pretreatment Ordinance Violations Related to Regulation of Fat, Oil and Grease Discharge
$100.00 (first violation within 12 months);
Sec. 104.161 - Failure to install, operate or maintain
$200.00 (second and subsequent violations within 12
grease interceptor/trap
months)
$100.00 (first violation within 12 months);
Sec. 104.163 - Failure to comply with WRA director
$200.00 (second and subsequent violations within 12
order
months)
100.00 (first violation within 12 months);
Sec. 104.164 - Inadequate installation of grease
$200.00 (second and subsequent violations within 12
interceptor/trap
months)
100. 00 (first violation within 12 months);
Sec. 104.165 - Failure to operate, maintain and
$200.00 (second and subsequent violations within 12
clean grease interceptor/trap
months)
$100.00 (first violation within 12 months),-
$200.00 (second and subsequent violations within 12
Sec. 104.166 - Failure to maintain records
months)
Sec. 104.167 - Failure to provide, operate and
T100.00 (first violation within 12 months);
maintain accessible monitoring facilities and allow
$200.00 (second and subsequent violations within 12
inspections
months)
$100.00 (first violation within 12 months);
$200.00 (second and subsequent violations within 12
Sec. 104.168 - Failure to pay charges, fines or fees
months)
*Notice of violation with the applicable penalty for such violations noted thereone shall be issued to the
violator. Penalties shall be paid in full within 30 days of the issuance of the notice at the City Clerk's Office,
Des Moines City Hall, 400 Robert D. Ray Drive, Des Moines, Iowa 50309.
Page 21 of 23
City of Waukee Fee Schedule 2024
Schedule of Administrative Penalties:*
Industrial Pretreatment Ordinance Violations Related to Regulation of Hauled Waste
$100.00 (first violation within 12 months);
$200.00 (second and subsequent violations within 12
Sec. 104.184 - Failure to obtain a license
months)
$100.00 (first violation within 12 months);
Sec. 104.185 - Failure to pay application fee or
$200.00 (second and subsequent violations within 12
provide bond
months)
100.00 (first violation within 12 months);
Sec. 104.186 - Failure to comply with vehicle and
$200.00 (second and subsequent violations within 12
equipment standards
months)
$100.00 (first violation within 12 months);
$200.00 (second and subsequent violations within 12
Sec. 104.187 - Improper disposal of hauled wastes
months)
$100.00 (first violation within 12 months), -
Sec. 104.188 - Failure to provide source and
$200.00 (second and subsequent violations within 12
disposal information
months)
1 00.00 (first violation within 12 months);
Sec. 104.189 - Improper mixture of waste types
$200.00 (second and subsequent violations within 12
and/or sources
months)
$100.00 (first violation within 12 months);
Sec. 104.190 - Failure to comply with disposal
$200.00 (second and subsequent violations within 12
standards
months)
$100.00 (first violation within 12 months);
Sec. 104.191 - Failure to remove or dispose of
$200.00 (second and subsequent violations within 12
rejected wastes
months)
100.00 (first violation within 12 months);
Sec. 104.192 - Failure to pay treatment fees or
$200.00 (second and subsequent violations within 12
other charges
months)
*Notice of violation with the applicable penalty for such violations noted thereone shall be issued to the
violator. Penalties shall be paid in full within 30 days of the issuance of the notice at the City Clerk's Office,
Des Moines City Hall, 400 Robert D. Ray Drive, Des Moines, Iowa 50309.
GIS Fees
Electronic media 1$41.95 per hour
Engineering Fees
Engineering inspection fees
$75.00 per hour
Third party inspection fees
Charged as billed
Large format prints (greater than 11 X 17")
$25.00
Miscellaneous Fees
Right of way/utility permit fee 1$150.00
Page 22 of 23
City of Waukee Fee Schedule 2024
Rebates
$75.00 (30-79,000 btu per hour);
Furnace (92% efficiency or greater)
$150.00 (80,000 + btu per hour)
Water heater (30, 40, & 50 gallons)
$50.00
Dryer, stove, gas fireplace
$25.00
Programmable thermostat (maximum rebate of
installed cost)
$30.00
50.00 maximum for purchase of 50 gallon or larger
Rain barrel
barrel
Up to $1,000.00 per BMP, max $5,000 per property
(50% cost share for materials, engineering and hired
Stormwater Grant
labor)
Page 23 of 23