Loading...
HomeMy WebLinkAbout2019-08-05-Resolution 19-306_Set Public Hearing Date, Lift Station No 3 Rehabilitation Phase 2-Backup Pump ReplacementRESOLUTION 19-306 RESOLUTION ORDERING CONSTRUCTION OF THE LIFT STATION NO. 3 REHABILITATION PHASE 2 - BACKUP PUMP REPLACEMENT, AND FIXING A DATE FOR HEARING THEREON AND TAKING OF BIDS THEREFOR WHEREAS, it is deemed advisable and necessary to construct certain public improvements described in general as the Lift Station No. 3 Rehabilitation Phase 2 - Backup Pump Replacement; and WHEREAS, the City has caused to be prepared plans, specifications and form of contract, together with estimate of cost, which are now on file in the office of the City Clerk for public inspection, for the construction of the public improvements; and WHEREAS, the plans, specifications and form of contract are deemed suitable for the making of the public improvements; and WHEREAS, before the plans, specifications, form of contract and estimate of cost may be adopted, and a contract for the construction of the public improvements is entered into, it is necessary, pursuant to Chapter 26, Code of Iowa, to hold a public hearing and to advertise for bids: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1. That it is hereby determined that it is necessary and advisable to construct certain public improvements described in general as the Lift Station No. 3 Rehabilitation Phase 2 - Backup Pump Replacement, in the manner set forth in the plans and specifications and form of contract, above referred to, the cost thereof to be paid in accordance with the provisions as set out in the posted Notice to Bidders and published Notice of Public Hearing; the public improvements being more generally described as follows: Construct improvements including all labor, materials and equipment necessary for lift station modifications; replacement of backup pump, including footings, slab and electrical work; replacement of standby power; electrical work including conduit, wiring and controls; security fence replacement, concrete driveway and pavement replacement, recoating of piping, valve repairs and miscellaneous associated work, including cleanup and surface restoration. Section 2. That the amount of the bid security to accompany each bid shall be in an amount which shall conform to the provisions of the notice to bidders approved as a part of the specifications. BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to post a notice to bidders once in a relevant contractor plan room service with statewide circulation and a relevant construction lead generating service with statewide circulation and on an internet site sponsored by either the City or a statewide association that represents the City. Posting shall be not less than thirteen clear days nor more than forty-five days prior to August 28, 2019, which is hereby fixed as the date for receiving bids. The bids are to be filed prior to 2:30 P.M., on such date. The City Council hereby delegates to the City Administrator or his designee the duty of receiving, opening and tabulating bids for construction of the Project. Bids shall be received and opened as provided in the public notice and the results of the bids shall be considered at the meeting of this Council on September 3, 2019, at 5:30 P.M. BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to publish notice of hearing once in a legal newspaper, printed wholly in the English language, published at least once weekly and having general circulation in this City. Publication shall be not less than four clear days nor more than twenty days prior to the date hereinafter fixed as the date for a public hearing on the plans, specifications, form of contract and estimate of costs for the project, the hearing to be at 5:30 P.M. on September 3, 2019. PASSED AND APPROVED this 5th day of August, 2019. ATTEST: �J4� fi� AAL-J-* City Clerk RESULTS OF VOTE: AYE Anna Bergman X R. Charles Bottenberg Courtney Clarke X Shelly Hughes X Larry R. Lyon X NAY ABSENT 0 ABSTAIN