HomeMy WebLinkAbout1999-06-21-Resolutions 99-64_Wastewater Treatment Facility - Change Order 2CITY OFWaukeeATHEKEYTOGOODLIVING RESOLUTION NO.99-64 A RESOLUTION APPROVING CHANGE ORDER NO.2 TO THE CONTRACT WITH RICE LAKE CONTRACTING CORP.FOR THE WASTEWATER TREATMENT FACILITY IMPROVEMENTS INCREASING THE CONTRACT IN THE AMOUNT OF $30,484.00 WHEREAS,it has been determined that the a change order is both necessary and prudent for the following modifications: 1.Addition of coarse bubble diffusers in the biosolids storage tank. 2.Changing the aeration system from 5 -30 HP blowers to 3 -40 blowers and the elimination of one diffuser assembly per aeration chain. 3.Addition of rough-in plumbing by the contractor for the installation of a sink in the process room of the headworks building. 4.Addition of a clay plug on Reed Beds subnatant line. 5.Increase the size ofMH-l from 48"diameter to 60"diameter. 6.Moving of tap location with the installation of a II-v"0 bend to bring water main in back line. 7.Extra work for repairing a 24"clay tile line which was not at the location as shown on plans. 8.Addition of two II-v"0 bends on water line to go around 24"clay tile. 9.Addition of a structure to accommodate a conflict between existing piping to the lagoons and the new 24"RW. 10.Installation of new 24"DIP between stromsewer release structure and MH-l. 11.Addition of three 2"pvc true union ball valves on the sampling lines at the sampler in the Control Room. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE,IOWA,that Change Order No.2 increasing the amount of the contract with Rice Lake Contracting Corp.in the amount of $30,484.00 for the Wastewater Treatment Facility Improvements is hereby approved;) BE IT FURTHER RESOLVED,that the Mayor and City Clerk be and they are hereby authorized and directed to execute said Change Order No.2. PASSED AND APPROVED this 21st day of June,1999. ROLL CALL VOTE AYES NAYS ABSENT Nicholas C.Gruber Marvin Berger Robyn S.Heath Bill Peard LaITy Lyon x X X X X J I