Loading...
HomeMy WebLinkAbout2001-07-02-Resolutions 01-106_Sidewalk Improvements 2001 Phase II - Preliminary ResRESOLUTION NO.01-106 Preliminary resolution pursuant to Section 384.42 of the Iowa Code covering the 2001 Sidewalk Improvements Project -Phase II WHEREAS,it is deemed advisable that certain public improvements be constructed in the City of Waukee,Iowa (the "City"),in accordance with the provisions of Chapter 384 of the Code ofIowa,and a portion of the cost be assessed to the property benefitted thereby;and WHEREAS,the City has arranged for engineering services with Veenstra & Kimm,Inc.,in connection with the said improvement; NOW,THEREFORE,It Is Resolved by the City Council of the City of Waukee, Iowa,as follows: Section 1.The 2001 Sidewalk hnprovements Project -Phase II shall consist of the removal of areas of deteriorated existing sidewalk and the construction of new sidewalk 4 feet wide and 4 inches thick along the east right-of-way line of 6th Street from Highway 6 to Ashworth Drive to replace deteriorated sections of sidewalk and to construct sidewalk at locations where no sidewalk presently exists.In locations of driveways,the sidewalk will be 8 inches thick.Sidewalk 4 inches thick will be of portland cement concrete and sidewalk 8 inches thick will be ofM-4 portland cement concrete.The improvements also include excavation and surface restoration associated with the construction of new sidewalk. It is considered that the following described property will be benefitted by this improvement and should be specially assessed: All West 195.75 feet of the east 1035.75 feet of the north 195 feet of the Northeast Quarter of the Northwest Quarter in Section 33,T79N,R26W. Lot 6 in Block 2 and Lot 6 in Block 7 of Waukee 1st Addition. All south Waukee 1st Addition in Block 7 north of the railroad between Lot 6 in Block 7 and the Chicago,Milwaukee &St.Paul Railroad. Parcels A and B,and Lot 1 and 2 in Block 8 of Waukee (original town). Section 4.The Project Engineers are hereby ordered to prepare preliminary plans and specifications,an estimated total cost ofthe work and a plat and schedule and to file the same with the City Clerk and shall include in the estimated cost a default fund item of not to exceed 10%of the amount to be assessed against specially benefitted property. Section 5.The improvement shall be known as the "200 I Sidewalk hnprovements Project -Phase II,"and shall be so referred to in all subsequent proceedings. Section 6.All resolutions,parts of resolutions,or actions of the Council in conflict herewith are hereby repealed,to the extent of such conflict. Passed and approved July 2,2001. or Attest: ROLL CALL VOTE AYE NAY ABSENT Nicholas C.Gruber X Marvin Berger X Bill Peard X Mike Watts X Wayne Johnson X